← Back
BuildNYC
Primarily 3 family with 1 store or office
361 WEST 52ND STREET
MANHATTAN · BIN 1025255
💬 Discuss this project
1920Year Built
4Stories
S3Building Class
R8Zoning
3,900 sfGross Floor Area
4Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 113 East 184th Street Realty · 1,500 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 4Intef interior renovation 4th floorUnder Construction5p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
113 East 184th Street Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/08/2021$2.4M—MAXY CAT REALTY LLC → 113 EAST 184TH STREET REALTY LLC$609/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
You Gao409/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Indesign Studio403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Division BuildersGeneral Contractor104/09/2026
XH&RC Plumbing and HeatingPlumbing108/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
You Gao9407409/14/2026
Building Lifecycle
All (48)Filed (4)Permit Issued (2)Violation (34)Special Inspection (8)
09/14/2026
Filed — Alteration
INTERIOR RENOVATION OF DWELLING UNIT ON 4TH FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01320998-P2
09/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
You Gao
09/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
07/31/2026
Permit issued — Plumbing
M01320998-S1-PL
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
You Gao
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
You Gao
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
06/12/2026
Filed — Alteration
INTERIOR RENOVATION OF DWELLING UNIT ON 4TH FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01320998-P1
04/29/2026
Violation issued (HPD, closed)
A
12/23/2025
Permit issued — General Construction
M01320998-I1-GC
11/20/2025
Filed — Alteration
INTERIOR RENOVATION OF DWELLING UNIT ON 4TH FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01320998-I1
11/20/2025
Filed — Alteration
INTERIOR RENOVATION OF DWELLING UNIT ON 4TH FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01320998-S1
11/17/2025
Violation issued (HPD, closed)
I
09/01/2025
Violation issued (HPD, open)
C
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
01/15/2021
Violation issued (HPD, closed)
C
08/22/2020
Violation issued (HPD, open)
C
02/18/2020
Violation issued (HPD, open)
C
10/25/2019
Violation issued (HPD, closed)
I
09/26/2019
Violation issued (ECB, closed)
Quality of Life
09/26/2019
Violation issued (ECB, closed)
Construction
09/26/2019
Violation issued (ECB, closed)
Construction
09/26/2019
Violation issued (ECB, closed)
Construction
09/26/2019
Violation issued (ECB, closed)
Quality of Life
09/26/2019
Violation issued (ECB, closed)
Construction
09/26/2019
Violation issued (ECB, closed)
Construction
09/20/2019
Violation issued (ECB, closed)
Construction
10/10/2018
Violation issued (HPD, closed)
I
02/03/2015
Violation issued (HPD, closed)
I
08/05/2010
Violation issued (ECB, closed)
Construction
04/17/1996
Violation issued (ECB, closed)
Construction
11/12/1992
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
11/12/1992
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/1992
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
09/12/1991
Violation issued (DOB, closed)
VP-VIOLATION UNSERVED ECB-ACTIVE
09/12/1991
Violation issued (ECB, closed)
Construction
04/05/1989
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedXH&RC Plumbing and Heating07/31/2026
DOB NOWGeneral ConstructionPermit IssuedDivision Builders12/23/2025
1 project · most recent 09/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/14/2026Permit IssuedXH&RC Plumbing and HeatingGas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/03/2026Tenant Protection Plan Compliance—special
09/03/2026Fire-Resistant Penetrations and JointsYou Gaospecial
09/03/2026Energy Code Compliance InspectionsYou Gaoprogress
09/03/2026HVAC-R and service water piping design and insulationYou Gaoenergy_progress
06/15/2026Fire-Resistant Penetrations and JointsYou Gaospecial
06/15/2026Tenant Protection Plan ComplianceYou Gaospecial
06/15/2026Energy Code Compliance InspectionsYou Gaoprogress
06/15/2026HVAC-R and service water piping design and insulationYou Gaoenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026M01320998-I1Request digital key ↗
08/20/2026M01320998-P1Request digital key ↗
08/20/2026M01320998-S1Request digital key ↗
▸Applications & Permits1
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M01320998-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/14/2026M01320998-P2Open ↗
08/20/2026M01320998-P1Open ↗
08/13/2026M01320998-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/14/2026M01320998-P2Open ↗
10/14/2026M01320998-P2Open ↗
08/27/2026M01320998-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
10/14/2026M01320998-P2Open ↗
08/27/2026M01320998-S1Open ↗
08/27/2026M01320998-S1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist4
10/14/2026M01320998-P2Open ↗
08/20/2026M01320998-P1Open ↗
08/13/2026M01320998-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026M01320998-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
10/14/2026M01320998-P2Open ↗
08/20/2026M01320998-P1Open ↗
08/13/2026M01320998-I1Open ↗
Showing 3 of 4 on file for this type