← Back
Over six families without stores
3612 BRONX BOULEVARD
BRONX · BIN 2057320
💬 Discuss this project
1925Year Built
5Stories
C1Building Class
R6AZoning
8,600 sfGross Floor Area
16Units
Rent Stabilized9 Open Violations ▸
Over six families without stores · Owner of record: GSJ BX 3612 BRONX BLVD LLC · 5,000 sf lot · 1.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 2 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Penthouse5p · 2 filings · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 48p · 3 filings · 20 docs
Floor 37p · 3 filings · 20 docs
Floor 27p · 3 filings · 20 docs
Floor 17p · 3 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN GRID2307/08/2026
RELIABLE ENTERPRISES607/08/2026
GSJ BX 3612 BRONX BLVD LLC903/22/2026
TECH CONSTRUCTION C BUILD103/22/2026
JCM PRO BUILDERS103/22/2026
BUILD TECH CONSTRUCTION C303/22/2026
POLAR CONTRACTING203/22/2026
SKYWARD103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/16/2021$1.6M—3612 BRONX PARTNERS LLC → GSJ BX 3612 BRONX BLVD LLC$184/sf building
10/17/2018$700K—— → —$81/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1003/21/2026
NEXT STEP BUILDING SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYWARD DEVELOPERS INCGeneral Contractor903/21/2026
BUILD TECH CONSTRUCTION CORP.General Contractor707/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
LLNY GROUP,LLCGeneral Contractor407/08/2026
KJK ELECTRIC INCElectrical203/22/2026
XH&RC PLBG AND HTG INCFire Protection107/08/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161001/09/2025
Building Lifecycle
All (137)Filed (13)Permit Issued (14)Signed Off (8)Violation (20)Inspection (9)Objection (40)Special Inspection (30)Tax Incentive (3)
07/08/2026
Violation issued (HPD, open)
B
07/08/2026
Violation issued (HPD, open)
C
07/08/2026
Violation issued (HPD, open)
A
07/08/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
A
06/25/2025
Signed off — Alteration
FILING PLUMBING AND SPRINKLER SYSTEM IN CONJUNCTION APPLICATION #210180588. GAS ENTIRELY REMOVED.
X00313396-I1
06/18/2025
Signed off — Alteration
FILING MECHANICAL IN CONJUNCTION APPLICATION #210180588
X00313406-I1
06/18/2025
Signed off — Alteration
X00313506-I1
06/18/2025
Signed off — Alteration
Filing FO application in conjunction with application #210180588
X00465025-I1
05/16/2025
Signed off — Alteration
Filing for Support of Excavation in conjunction with application #210180588
X00465046-I1
01/24/2025
Signed off — Alteration
REPAIR CURB CUT, NO CHANGE OF USE, EGRESS AND OCCUPANCY.
X01072588-I1
01/15/2025
Special inspection requirement — Final
FAHAD FATEH
01/15/2025
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
01/15/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
01/15/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
01/15/2025
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
01/15/2025
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
01/15/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/15/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/15/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
01/09/2025
Filed — Alteration
FILING MECHANICAL IN CONJUNCTION APPLICATION #210180588
X00313406-P2
01/01/2025
421-a(16) construction completed
12/30/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/16/2024
Filed — Alteration
FILING MECHANICAL IN CONJUNCTION APPLICATION #210180588
X00313406-P1
12/10/2024
Permit issued — Curb Cut
X01072588-I1-CC
12/06/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/03/2024
Violation issued (HPD, closed)
I
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/22/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/22/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
11/22/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
11/22/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/22/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
11/14/2024
Filed — Alteration
FILING PLUMBING AND SPRINKLER SYSTEM IN CONJUNCTION APPLICATION #210180588. GAS ENTIRELY REMOVED.
X00313396-P3
11/01/2024
Signed off — Alteration
FILING CONSTRUCTION FENCE IN CONJUNCTION APPLICATION #210180588
X00313422-I1
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/01/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
11/01/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
11/01/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/01/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
11/01/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/01/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
10/30/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00907812-I1
10/23/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/15/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/20/2024
Permit issued — Plumbing
X00313396-I1-EW-SP
09/09/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
09/09/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/09/2024
Special inspection requirement — Final
FAHAD FATEH
09/09/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
09/09/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
09/09/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/29/2024
421-a(16) registration filed
08/02/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/10/2024
Objection resolved — Addressed
07/08/2024
Objection raised — Scope
06/28/2024
Filed — Alteration
REPAIR CURB CUT, NO CHANGE OF USE, EGRESS AND OCCUPANCY.
X01072588-I1
03/20/2024
Permit issued — Mechanical Systems
X00313406-I1-MS
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offLLNY GROUP,LLC12/10/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC09/20/2024
DOB NOWMechanical SystemsSigned-offLLNY GROUP,LLC03/20/2024
DOB NOWConstruction FenceSigned-offBUILD TECH CONSTRUCTION C12/04/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC11/29/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC07/24/2023
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC07/05/2023
DOB NOWFoundationSigned-offBUILD TECH CONSTRUCTION C10/24/2022
DOB NOWConstruction FenceSigned-offBUILD TECH CONSTRUCTION C08/02/2022
DOB NOWStructuralSigned-offBUILD TECH CONSTRUCTION C08/01/2022
DOB NOWStructuralSigned-offSKYWARD DEVELOPERS INC09/01/2021
DOB NOWSprinklersSigned-offA. M. PLUMBING COMPANY07/14/2021
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC04/15/2021
DOB NOWMechanical SystemsSigned-offSKYWARD DEVELOPERS INC04/15/2021
BIS—ISSUEDLLNY GROUP,LLC08/12/2025
BIS—ISSUEDBUILD TECH CONSTRUCTION CORP.11/22/2023
BIS—ISSUEDBUILD TECH CONSTRUCTION CORP.11/04/2022
BIS—ISSUEDBUILD TECH CONSTRUCTION CORP.07/08/2022
BIS—ISSUEDJCM PRO BUILDERS LLC11/17/2021
BIS—RE-ISSUEDSKYWARD DEVELOPERS INC08/31/2021
3 projects · most recent 09/12/2024
General Wiring
FiledStatusContractorScope
09/12/2024CompleteKJK ELECTRIC INCGeneral Wiring
07/24/2023CompleteRICHARD NEU—
12/07/2021CompleteMAGNA ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/30/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
12/06/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
10/23/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
10/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/02/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/05/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/31/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
01/15/2025FinalFAHAD FATEHprogress
01/15/2025HVAC insulation and sealing FAHAD FATEHenergy_progress
01/15/2025Maintenance informationFAHAD FATEHenergy_progress
01/15/2025Shutoff dampersFAHAD FATEHenergy_progress
01/15/2025HVAC and service water heating system controls FAHAD FATEHenergy_progress
01/15/2025HVAC and service water heating equipment FAHAD FATEHenergy_progress
01/15/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/15/2025Mechanical SystemsFAHAD FATEHspecial
01/15/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/15/2025Heating SystemsFAHAD FATEHspecial
11/22/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/22/2024Maintenance informationFAHAD FATEHenergy_progress
11/22/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
11/22/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
11/22/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
11/22/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/22/2024Sprinkler SystemsFAHAD FATEHspecial
11/01/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/01/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
11/01/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
11/01/2024Maintenance informationFAHAD FATEHenergy_progress
11/01/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
11/01/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/01/2024Sprinkler SystemsFAHAD FATEHspecial
09/09/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
Latest 25 of 40.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch - Sprinkler4
08/20/2026X00313396-P3Request digital key ↗
08/20/2026X00313396-I1Request digital key ↗
08/20/2026X00313396-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/20/2026X00313396-I1Request digital key ↗
08/20/2026X00313396-P3Request digital key ↗
08/15/2026X00313396-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/25/2026X00313406-P2Request digital key ↗
08/25/2026X00313406-P1Request digital key ↗
08/25/2026X00313406-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/22/2026X00907812-I1Request digital key ↗
08/21/2026X01072588-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
08/15/2026X00465025-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026X00313422-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation1
08/15/2026X00465046-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/25/2026X00313506-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
08/06/2025210180588Open ↗
06/11/2025210180588Open ↗
04/21/2025210180588Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
09/05/2025210180588Open ↗
07/12/2022210180588Open ↗
11/22/2021210180588Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/03/2021210180588Open ↗
▸BISVERIFY TAX LOT1
11/19/2024210180588Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/17/2025210180588Open ↗
▸BISZONING DIAGRAM1
02/08/2021210180588Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/03/2021210180588Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature25
09/02/2026X00313396-P3Open ↗
09/02/2026X00313396-P3Open ↗
09/02/2026X00313396-P3Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026X00313422-I1Open ↗
08/25/2026X00313406-I1Open ↗
08/25/2026X00313406-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026X00313396-P3Open ↗
09/02/2026X00313396-P3Open ↗
08/30/2026X00313396-I1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/22/2024240360051Open ↗
06/24/2024240360051Open ↗
▸Trade Schedules & Equipment2
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/13/2024210180588Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/13/2024210180588Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
07/22/2024240360051Open ↗
02/08/2021210180588Open ↗
01/26/2021210180588Open ↗
▸BISSTREET TREE SIGNOFF2
08/21/2025240360051Open ↗
12/12/2024210180588Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/10/2021210180588Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/22/2024240360051Open ↗
▸Environmental & Asbestos31
▸DOB NOWOER: Notice to Proceed11
08/13/2026X00313396-P3Open ↗
08/13/2026X00313506-I1Open ↗
08/13/2026X00313396-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026X00313406-P1Open ↗
08/25/2026X00313406-I1Open ↗
08/25/2026X00313406-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026X00313506-I1Open ↗
08/13/2026X00465046-I1Open ↗
08/13/2026X00313406-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/03/2021210180588Open ↗
01/26/2021210180588Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
08/21/2025240360051Open ↗
06/18/2025210180588Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
06/24/2024240360051Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE1
05/11/2021210180588Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
07/22/2022210180588Open ↗
07/22/2022210180588Open ↗
04/14/2022210180588Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00313396-I1Open ↗
08/13/2026X00313406-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/13/2024210180588Open ↗
▸BISINTERIOR LIGHTING POWER1
12/13/2024210180588Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/13/2024210180588Open ↗
▸BISFENESTRATION AREAS1
12/13/2024210180588Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
12/13/2024210180588Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/13/2024210180588Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/13/2024210180588Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/12/2024210180588Open ↗
▸BISLIGHTING CONTROLS1
12/13/2024210180588Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/17/2024210180588Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/22/2022210180588Open ↗
04/14/2022210180588Open ↗
05/06/2021210180588Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
07/07/2022210180588Open ↗
05/21/2021210180588Open ↗
05/21/2021210180588Open ↗
Showing 3 of 5 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
12/12/2024210180588Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/22/2025210180588Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/12/2024210180588Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/12/2024210180588Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/12/2024210180588Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/12/2024210180588Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/12/2024210180588Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/12/2024210180588Open ↗
▸BISSOIL REPORT1
02/08/2021210180588Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/10/2021210180588Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/03/2021210180588Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00465046-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X00465046-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00465046-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSUPERSEDING LETTER5
09/05/2025210180588Open ↗
07/12/2022210180588Open ↗
11/22/2021210180588Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
06/11/2025210180588Open ↗
04/21/2025210180588Open ↗
02/12/2025210180588Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE7
09/05/2025210180588Open ↗
07/12/2022210180588Open ↗
07/07/2022210180588Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT3
01/08/2025210180588Open ↗
12/27/2024210180588Open ↗
01/26/2021210180588Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/19/2024210180588Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION7
04/23/2025210180588Open ↗
10/04/2024210180588Open ↗
07/22/2024240360051Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
09/05/2025210180588Open ↗
07/12/2022210180588Open ↗
11/22/2021210180588Open ↗
Showing 3 of 5 on file for this type
▸Other Documents14
▸DOB NOWPlot Diagram2
08/13/2026X00465046-I1Open ↗
08/13/2026X00465025-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
01/26/2021210180588Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
07/22/2024240360051Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/19/2025210180588Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/22/2024240360051Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/12/2024210180588Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
12/12/2024210180588Open ↗
▸BISMAINTENANCE INFORMATION1
12/13/2024210180588Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/13/2024210180588Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
12/13/2024210180588Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
12/13/2024210180588Open ↗
▸BISPLOT DIAGRAM1
01/26/2021210180588Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00465046-I1Open ↗