← Back
One story - permanent living quarter
3619 VICTORY BOULEVARD
STATEN ISLAND · BIN 5036676
💬 Discuss this project
1920Year Built
1.67Stories
A2Building Class
M1-1Zoning
1,200 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: REAL VICTORY LLC · 14,125 sf lot · 0.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OSCII203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE201/02/2024
WALDRON ENGINEERING206/15/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683201/02/2024
Building Lifecycle
All (11)Filed (4)Permit Issued (1)Signed Off (1)Violation (3)Inspection (2)
11/26/2025
Violation issued (HPD, open)
I
12/05/2024
Violation issued (HPD, open)
I
02/21/2024
Signed off — Alteration
APPLICAITON FILED FOR THE INSTALLATION OF NEW GAS METER AND INSTALLATION OF NEW GAS HWH/BOILER
S00887266-I1
02/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/02/2024
Filed — Alteration
APPLICAITON FILED FOR THE INSTALLATION OF NEW GAS METER AND INSTALLATION OF NEW GAS HWH/BOILER
S00887266-P1
11/30/2023
Violation issued (HPD, open)
I
11/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2023
Permit issued — Plumbing
S00887266-I1-PL
07/20/2023
Filed — Alteration
APPLICAITON FILED FOR THE INSTALLATION OF NEW GAS METER AND INSTALLATION OF NEW GAS HWH/BOILER
S00887266-I1
06/15/2023
Filed — Alteration CO
Refiling of S00838391-I1 as requested as last objection from Plan examiner (Frank Shaker) that we withdraw the NB filing and re-file as ALT-CO. ESS <10,000 sq-ft occupancy U use group 6D in a M1-1, complies with NYC 2022, RCNY 608-01A, BB_2019-002 and 007
S00890436-I1
04/07/2023
Filed — New Building
Non accessory ESS <10,000 Sq-ft
S00838391-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/27/2023
2 projects · most recent 06/15/2023
FiledStatusContractorScope
06/15/2023——1 scope_items
04/07/2023——1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/04/2024Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
01/04/2024Energy Code Compliance InspectionsFrank Martarella IIIprogress
01/04/2024HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
01/04/2024HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
01/04/2024HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
01/02/2024HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
01/02/2024Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
01/02/2024Energy Code Compliance InspectionsFrank Martarella IIIprogress
01/02/2024HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
01/02/2024HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
04/05/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
04/05/2023Concrete - Cast-In-Place—special
03/03/2023Final—progress
03/03/2023Footing and Foundation—progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00890436-I1Request digital key ↗
08/22/2026S00887266-P1Request digital key ↗
08/22/2026S00887266-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00890436-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00838391-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026S00887266-I1Open ↗
08/13/2026S00838391-I1Open ↗
08/13/2026S00887266-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S00887266-I1Open ↗
09/01/2026S00887266-I1Open ↗
08/30/2026S00887266-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00887266-I1Open ↗
08/30/2026S00887266-P1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00838391-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026S00838391-I1Open ↗
08/13/2026S00890436-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026S00887266-I1Open ↗
08/13/2026S00887266-P1Open ↗
▸Other Documents6
▸DOB NOWFinal Survey2
08/13/2026S00838391-I1Open ↗
08/13/2026S00890436-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026S00890436-I1Open ↗
08/13/2026S00838391-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00838391-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00838391-I1Open ↗