← Back
Public elementary, junior or senior high
363 37 STREET
BROOKLYN · BIN 3337060
💬 Discuss this project
1900Year Built
4Stories
W1Building Class
M1-2DZoning
69,260 sfGross Floor Area
0Units
LL97 Covered13 Open Violations 0 unresolved · 13 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 40,000 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
StructuralPlumbingCivil
Permit Issued — active, not yet Signed-off
CellarUnder Construction20p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2108/21/2026
DEPT.OF EDUCATION P.S.23403/22/2026
DEPT OF EDUCATION P.S.231403/22/2026
D.O.E. P.S.231 0103/22/2026
DOE PS 231 040103/22/2026
DEPARTMENT OF EDUCATION103/22/2026
PS 231 DOE203/22/2026
PS 231 DEPT OF ED103/22/2026
PS 231 0103/22/2026
NYCSCA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAI JI PLUMBING INCGeneral Contractor504/09/2026
SAI JI PLUMBING, INCPlumbing408/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171206/11/2026
Building Lifecycle
All (88)Filed (13)Permit Issued (8)Violation (25)Inspection (5)Objection (10)Special Inspection (27)
08/20/2026
Permit issued — Plumbing
B01137527-I1-PL
08/20/2026
Permit issued — Plumbing
B01137527-S2-PL
06/12/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MAXIM KORNGOLD
06/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01287626-P2
06/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MAXIM KORNGOLD
06/03/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/17/2026
Special inspection requirement — Electrical motors and elevators
MIKHAIL ZEYGMAN
02/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tommy Maene
02/17/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
02/17/2026
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
02/17/2026
Special inspection requirement — Concrete - Precast
MIKHAIL ZEYGMAN
02/17/2026
Special inspection requirement — Final
MIKHAIL ZEYGMAN
02/17/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
02/17/2026
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
02/17/2026
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
02/11/2026
Filed — Alteration
On-site improvements to support a new stormwater system as part of a separate application (B01137527-S2).
B01137527-P4
02/11/2026
Filed — Alteration
On-site improvements to support a new stormwater system as part of a separate application (B01137527-S2).
B01137527-P5
02/02/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Concrete - Precast
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tommy Maene
02/02/2026
Special inspection requirement — Final
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Electrical motors and elevators
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
02/02/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
01/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01287626-P1
01/16/2026
Permit issued — Plumbing
B01137527-I1-PL
01/16/2026
Permit issued — Plumbing
B01137527-S2-PL
01/16/2026
Permit issued — Earth Work
B01137527-S1-GC-CX
01/16/2026
Permit issued — Foundation
B01137527-S3-GC-CX
01/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2026
Objection resolved — Addressed
12/12/2025
Objection raised — Other
12/09/2025
Filed — Alteration
On-site improvements to support a new stormwater system as part of a separate application (B01137527-S2).
B01137527-P3
12/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
12/09/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
12/09/2025
Special inspection requirement — Footing and Foundation
MIKHAIL ZEYGMAN
12/09/2025
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
11/25/2025
Permit issued — Support of Excavation
B01287626-I1-SE
11/21/2025
Permit issued — Construction Fence
B01282888-I1-FN
11/20/2025
Objection resolved — Addressed
10/22/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION AS INDICATED ON PLANS.THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01287626-I1
10/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
10/08/2025
Filed — Alteration
On-site improvements to support a new stormwater system as part of a separate application (B01137527-S2).
B01137527-P2
10/08/2025
Filed — Alteration
On-site improvements to support a new stormwater system as part of a separate application (B01137527-S2).
B01137527-P1
09/30/2025
Objection raised — Other
09/23/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 721K AT 360 36 STREETBROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01282888-I1
06/27/2025
Violation issued (ECB, open)
Construction
04/07/2025
Objection resolved — Addressed
04/07/2025
Objection resolved — Addressed
04/07/2025
Objection resolved — Addressed
01/07/2025
Objection raised — Other
01/03/2025
Filed — Alteration
On-site improvements to support a new stormwater system as part of a separate application (B01137527-S2).
B01137527-S3
12/30/2024
Objection raised — Other
12/30/2024
Objection raised — Other
12/23/2024
Filed — Alteration
On-site improvements to support a new stormwater system as part of a separate application (B01137527-S2).
B01137527-S1
12/23/2024
Filed — Alteration
On-site improvements to support a new stormwater system as part of a separate application (B01137527-S2).
B01137527-S2
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSAI JI PLUMBING, INC08/20/2026
DOB NOWPlumbingPermit IssuedSAI JI PLUMBING, INC08/20/2026
DOB NOWPlumbingPermit IssuedSAI JI PLUMBING, INC01/16/2026
DOB NOWPlumbingPermit IssuedSAI JI PLUMBING, INC01/16/2026
DOB NOWEarth WorkPermit IssuedSAI JI PLUMBING INC01/16/2026
DOB NOWFoundationPermit IssuedSAI JI PLUMBING INC01/16/2026
DOB NOWSupport of ExcavationPermit IssuedSAI JI PLUMBING INC11/25/2025
DOB NOWConstruction FencePermit IssuedSAI JI PLUMBING INC11/21/2025
BISOTISSUEDARCADIA ELECTRICAL CO INC05/10/2016
BISOTISSUEDPHOENIX SERVICES CORPORATION07/27/2006
BISEQISSUEDACE SCAFFOLD CO INC12/13/2005
BISOTISSUEDPHOENIX SERVICES CORPORATION08/01/2005
BISEQISSUEDACE SCAFFOLD CO INC07/15/2005
1 project · most recent 02/11/2026
Storm
FiledStatusContractorScope
02/11/2026Permit IssuedSAI JI PLUMBING, INCStorm
4 projects · most recent 03/30/2026
Lighting General Wiring
FiledStatusContractorScope
03/30/2026Permit IssuedCANDELA SYSTEMS CORP DBALighting
02/16/2026Permit IssuedPLUS ELECTRIC INCLighting
12/17/2025Permit IssuedJKC ELECTRICAL INCGeneral Wiring
09/27/2019CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
2 projects · most recent 06/11/2026
FiledStatusContractorScope
06/11/2026Permit IssuedSAI JI PLUMBING INC1 scope_items
02/11/2026Permit IssuedSAI JI PLUMBING, INC1 scope_items
1 project · most recent 09/23/2025
Fence
FiledStatusContractorScope
09/23/2025Permit IssuedSAI JI PLUMBING INCFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/03/2026Pass-Final PL - UndergroundPassView ↗
01/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/12/2026Excavations - Sheeting, Shoring, and BracingMAXIM KORNGOLDspecial
06/10/2026Excavations - Sheeting, Shoring, and BracingMAXIM KORNGOLDspecial
02/17/2026Electrical motors and elevatorsMIKHAIL ZEYGMANenergy_progress
02/17/2026Subsurface Investigations (Borings/Test Pits)Tommy Maenespecial
02/17/2026Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
02/17/2026Subgrade InspectionsMIKHAIL ZEYGMANspecial
02/17/2026Concrete - PrecastMIKHAIL ZEYGMANspecial
02/17/2026FinalMIKHAIL ZEYGMANprogress
02/17/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
02/17/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
02/17/2026Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
02/17/2026Maintenance informationMIKHAIL ZEYGMANenergy_progress
02/02/2026Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
02/02/2026Concrete - PrecastMIKHAIL ZEYGMANspecial
02/02/2026Subgrade InspectionsMIKHAIL ZEYGMANspecial
02/02/2026Subsurface Investigations (Borings/Test Pits)Tommy Maenespecial
02/02/2026FinalMIKHAIL ZEYGMANprogress
02/02/2026Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
02/02/2026Electrical motors and elevatorsMIKHAIL ZEYGMANenergy_progress
02/02/2026Maintenance informationMIKHAIL ZEYGMANenergy_progress
02/02/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
02/02/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
12/09/2025Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
12/09/2025FinalMIKHAIL ZEYGMANprogress
12/09/2025Footing and FoundationMIKHAIL ZEYGMANprogress
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.s.721kEducation—
Project B01287626 Alteration · Permit Entire · 10/22/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/20/2026B01282888-I1Request digital key ↗
08/20/2026B01137527-P5Request digital key ↗
08/20/2026B01137527-P4Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026B01137527-I1Open ↗
09/02/2026B01137527-I1Open ↗
08/31/2026B01137527-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/20/2026B01137527-P1Open ↗
08/20/2026B01137527-P5Open ↗
08/20/2026B01137527-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B01137527-I1Open ↗
09/02/2026B01137527-I1Open ↗
09/02/2026B01137527-I1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026B01282888-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026B01137527-P5Open ↗
08/13/2026B01137527-P1Open ↗
08/13/2026B01137527-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01137527-S1Open ↗
▸Approvals, Objections & Sign-offs29
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/18/2026B01287626-P2Open ↗
08/13/2026B01137527-I1Open ↗
08/13/2026B01137527-S3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/18/2026B01287626-P2Open ↗
08/13/2026B01137527-P2Open ↗
08/13/2026B01137527-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026B01137527-S3Open ↗
08/13/2026B01137527-I1Open ↗
08/13/2026B01137527-S1Open ↗
▸Other Documents16
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal14
08/18/2026B01287626-P2Open ↗
08/18/2026B01287626-I1Open ↗
08/13/2026B01287626-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01287626-I1Open ↗
08/13/2026B01137527-S1Open ↗