← Back
Miscellaneous religious facility
363 DAHILL ROAD
BROOKLYN · Kensington · BIN 3125938
💬 Discuss this project
1930Year Built
1Stories
M9Building Class
R5Zoning
2,443 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Miscellaneous religious facility · 4,000 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DO WELL MANAGEMENT LLC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB202/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)203/21/2026
XPDITE GROUP 103203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NAIM CONSTRUCTION LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524202/10/2023
Building Lifecycle
All (45)Filed (2)Permit Issued (1)Signed Off (1)Violation (11)Special Inspection (30)
07/13/2026
Violation issued (ECB, open)
Construction
05/29/2025
Violation issued (ECB, closed)
Construction
11/04/2024
Violation issued (ECB, closed)
Construction
06/15/2023
Signed off — Alteration
APPLICATION FILED HEREWITH TO RE-CONSTRUCT PARTIALLY REMOVED WALL AT REAR OF THE BUILDING.
B08044129-I1
04/14/2023
Permit issued — General Construction
B08044129-I1-GC
02/15/2023
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
02/15/2023
Special inspection requirement — Masonry
Shahrish Shuvo
02/15/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Shahrish Shuvo
02/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/15/2023
Special inspection requirement — Final
Shahrish Shuvo
02/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
02/15/2023
Special inspection requirement — Preliminary
Shahrish Shuvo
02/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
02/15/2023
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
02/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
02/15/2023
Special inspection requirement — Interior lighting power
Shahrish Shuvo
02/15/2023
Special inspection requirement — Fenestration areas
Shahrish Shuvo
02/15/2023
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
02/15/2023
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
02/10/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO RE-CONSTRUCT PARTIALLY REMOVED WALL AT REAR OF THE BUILDING.
B08044129-P1
02/06/2023
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
02/06/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Shahrish Shuvo
02/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/06/2023
Special inspection requirement — Masonry
Shahrish Shuvo
02/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
02/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
02/06/2023
Special inspection requirement — Final
Shahrish Shuvo
02/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
02/06/2023
Special inspection requirement — Preliminary
Shahrish Shuvo
02/06/2023
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
02/06/2023
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
02/06/2023
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
02/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
02/06/2023
Special inspection requirement — Interior lighting power
Shahrish Shuvo
02/06/2023
Special inspection requirement — Fenestration areas
Shahrish Shuvo
12/07/2022
Filed — Alteration
APPLICATION FILED HEREWITH TO RE-CONSTRUCT PARTIALLY REMOVED WALL AT REAR OF THE BUILDING.
B08044129-I1
06/19/2018
Violation issued (ECB, closed)
Construction
06/19/2018
Violation issued (ECB, closed)
Construction
05/30/2018
Violation issued (ECB, closed)
Construction
05/30/2018
Violation issued (ECB, closed)
Construction
05/30/2018
Violation issued (ECB, closed)
Construction
05/09/2017
Violation issued (ECB, closed)
Construction
12/17/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/24/2014
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNAIM CONSTRUCTION LLC04/14/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
02/15/2023Concrete - Cast-In-PlaceShahrish Shuvospecial
02/15/2023MasonryShahrish Shuvospecial
02/15/2023Construction Operations Influencing Adjacent StructuresShahrish Shuvospecial
02/15/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
02/15/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
02/15/2023FinalShahrish Shuvoprogress
02/15/2023Energy Code Compliance InspectionsShahrish Shuvoprogress
02/15/2023PreliminaryShahrish Shuvoprogress
02/15/2023Fire-Resistance Rated ConstructionShahrish Shuvoprogress
02/15/2023Air barrier - visual inspectionShahrish Shuvoenergy_progress
02/15/2023Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
02/15/2023Interior lighting powerShahrish Shuvoenergy_progress
02/15/2023Fenestration areasShahrish Shuvoenergy_progress
02/15/2023Insulation placement and R valuesShahrish Shuvoenergy_progress
02/15/2023Fenestration air leakageShahrish Shuvoenergy_progress
02/06/2023Concrete - Cast-In-PlaceShahrish Shuvospecial
02/06/2023Construction Operations Influencing Adjacent StructuresShahrish Shuvospecial
02/06/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
02/06/2023MasonryShahrish Shuvospecial
02/06/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
02/06/2023Energy Code Compliance InspectionsShahrish Shuvoprogress
02/06/2023FinalShahrish Shuvoprogress
02/06/2023Fire-Resistance Rated ConstructionShahrish Shuvoprogress
02/06/2023PreliminaryShahrish Shuvoprogress
02/06/2023Fenestration air leakageShahrish Shuvoenergy_progress
Latest 25 of 30.
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B08044129-P1Request digital key ↗
08/27/2026B08044129-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
06/21/2022322106412Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B08044129-I1Open ↗
08/29/2026B08044129-I1Open ↗
08/26/2026B08044129-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B08044129-I1Open ↗
08/13/2026B08044129-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B08044129-I1Open ↗
08/26/2026B08044129-P1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/21/2022322106412Open ↗