← Back
One family attached or semi-detached
363 POILLON AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5175913
💬 Discuss this project
2023Year Built
—Stories
A5Building Class
R3-2Zoning
1,775 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,954 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Attic3p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 14p · 2 filings · 20 docs
Basement3p · 1 filing · 20 docs
Site & exterior3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DONATO2707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI605/16/2024
ROGERS CALVANICO GROUP PLLC109/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MADONIA DEVELOPMENT CORPGeneral Contractor1003/21/2026
DONATO PLUMBING GROUP INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738305/16/2024
JAMES V MORRI, RA1042305/16/2024
Building Lifecycle
All (62)Filed (7)Permit Issued (7)Signed Off (3)Inspection (13)Objection (2)Special Inspection (30)
01/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2024
Special inspection requirement — Concrete - Cast-In-Place
James Morri
06/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
06/03/2024
Special inspection requirement — Subgrade Inspections
James Morri
06/03/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
06/03/2024
Special inspection requirement — Energy Code Compliance Inspections
James Morri
06/03/2024
Special inspection requirement — Footing and Foundation
James Morri
06/03/2024
Special inspection requirement — Final
James Morri
06/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
James Morri
06/03/2024
Special inspection requirement — Structural Wood Frame
James Morri
06/03/2024
Special inspection requirement — Fenestration air leakage
James Morri
06/03/2024
Special inspection requirement — Fenestration areas
James Morri
06/03/2024
Special inspection requirement — Lighting in dwelling units
James Morri
06/03/2024
Special inspection requirement — Lighting controls
James Morri
06/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
James Morri
06/03/2024
Special inspection requirement — Maintenance information
James Morri
06/03/2024
Special inspection requirement — Insulation placement and R values
James Morri
06/03/2024
Special inspection requirement — Air barrier — testing
anthony santoro
06/03/2024
Special inspection requirement — Permanent certificate
James Morri
06/03/2024
Special inspection requirement — Metering
James Morri
06/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
James Morri
06/03/2024
Special inspection requirement — Air barrier - visual inspection
James Morri
06/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
James Morri
06/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
James Morri
05/16/2024
Filed — New Building
INSTALLATION OF NEW STORM PIPING AND COMPONENTS SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING. STORM DRAINAGE PIPING IN OPEN SPACE LISTED ON THIS APPLICATION AS OTHER.
S08025372-P3
05/06/2024
Signed off — New Building
INSTALLATION OF NEW STORM PIPING AND COMPONENTS SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING. STORM DRAINAGE PIPING IN OPEN SPACE LISTED ON THIS APPLICATION AS OTHER.
S08025372-S2
05/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/01/2024
Signed off — New Building
INSTALLATION OF NEW STORM PIPING AND COMPONENTS SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING. STORM DRAINAGE PIPING IN OPEN SPACE LISTED ON THIS APPLICATION AS OTHER.
S08025372-S1
04/12/2024
Signed off — Alteration
S08055638-I1
04/11/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2024
Permit issued — Curb Cut
S08055638-I1-CC
03/27/2024
Filed — Alteration
S08055638-I1
03/21/2024
Objection raised — Scope
03/21/2024
Objection resolved — Addressed
03/15/2024
Filed — New Building
INSTALLATION OF NEW STORM PIPING AND COMPONENTS SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING. STORM DRAINAGE PIPING IN OPEN SPACE LISTED ON THIS APPLICATION AS OTHER.
S08025372-P1
03/14/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
03/07/2024
Filed — New Building
INSTALLATION OF NEW STORM PIPING AND COMPONENTS SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING. STORM DRAINAGE PIPING IN OPEN SPACE LISTED ON THIS APPLICATION AS OTHER.
S08025372-P2
03/05/2024
Special inspection requirement — Concrete - Cast-In-Place
James Morri
03/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
03/05/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
03/05/2024
Special inspection requirement — Subgrade Inspections
James Morri
03/05/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/05/2024
Special inspection requirement — Energy Code Compliance Inspections
James Morri
03/01/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/29/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/26/2023
Permit issued — Plumbing
S08025372-S2-PL
09/25/2023
Filed — New Building
INSTALLATION OF NEW STORM PIPING AND COMPONENTS SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING. STORM DRAINAGE PIPING IN OPEN SPACE LISTED ON THIS APPLICATION AS OTHER.
S08025372-S2
08/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/18/2023
Permit issued — Plumbing
S08025372-S1-PL
08/15/2023
Filed — New Building
INSTALLATION OF NEW STORM PIPING AND COMPONENTS SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING. STORM DRAINAGE PIPING IN OPEN SPACE LISTED ON THIS APPLICATION AS OTHER.
S08025372-S1
06/23/2023
Permit issued — Earth Work
S08025372-I1-ST
06/23/2023
Permit issued — Earth Work
S08025372-I1-FO
06/23/2023
Permit issued — Earth Work
S08025372-I1-EA
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMADONIA DEVELOPMENT CORP04/01/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING GROUP INC09/26/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING GROUP INC08/18/2023
DOB NOWEarth WorkSigned-offMADONIA DEVELOPMENT CORP06/23/2023
DOB NOWEarth WorkSigned-offMADONIA DEVELOPMENT CORP06/23/2023
DOB NOWEarth WorkSigned-offMADONIA DEVELOPMENT CORP06/23/2023
DOB NOWStructuralPermit IssuedMADONIA DEVELOPMENT CORP06/20/2023
1 project · most recent 05/16/2024
Sprinkler System
FiledStatusContractorScope
05/16/2024——Sprinkler System
1 project · most recent 05/16/2024
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/16/2024Signed-offDONATO PLUMBING GROUP INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 09/21/2023
General Wiring
FiledStatusContractorScope
09/21/2023CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
1 project · most recent 05/16/2024
Concrete Wood
FiledStatusContractorScope
05/16/2024Signed-offDONATO PLUMBING GROUP INCConcrete, Wood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
01/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/01/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
06/03/2024Concrete - Cast-In-PlaceJames Morrispecial
06/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
06/03/2024Fire-Resistant Penetrations and JointsJames Morrispecial
06/03/2024Subgrade InspectionsJames Morrispecial
06/03/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
06/03/2024Energy Code Compliance InspectionsJames Morriprogress
06/03/2024Footing and FoundationJames Morriprogress
06/03/2024FinalJames Morriprogress
06/03/2024Fire-Resistance Rated ConstructionJames Morriprogress
06/03/2024Structural Wood FrameJames Morriprogress
06/03/2024Fenestration air leakageJames Morrienergy_progress
06/03/2024Fenestration areasJames Morrienergy_progress
06/03/2024Lighting in dwelling unitsJames Morrienergy_progress
06/03/2024Lighting controlsJames Morrienergy_progress
06/03/2024Fenestration and door U-factor and product ratingsJames Morrienergy_progress
06/03/2024Maintenance informationJames Morrienergy_progress
06/03/2024Insulation placement and R valuesJames Morrienergy_progress
06/03/2024Air barrier — testing anthony santoroenergy_progress
06/03/2024Permanent certificateJames Morrienergy_progress
06/03/2024MeteringJames Morrienergy_progress
06/03/2024HVAC-R and service water heating equipmentJames Morrienergy_progress
06/03/2024Air barrier - visual inspectionJames Morrienergy_progress
06/03/2024HVAC-R and service water heating system controlsJames Morrienergy_progress
06/03/2024HVAC-R and service water piping design and insulationJames Morrienergy_progress
03/05/2024Concrete - Cast-In-PlaceJames Morrispecial
Latest 25 of 48.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026S08055638-I1Request digital key ↗
08/21/2026S08025372-I1Request digital key ↗
08/21/2026S08025372-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/21/2026S08025372-P1Open ↗
08/21/2026S08025372-I1Open ↗
08/13/2026S08025372-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/21/2026S08025372-I1Open ↗
08/21/2026S08025372-P1Open ↗
08/13/2026S08025372-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08025372-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature12
09/19/2026S08025372-I1Open ↗
09/19/2026S08025372-I1Open ↗
09/19/2026S08025372-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/19/2026S08025372-I1Open ↗
09/19/2026S08025372-I1Open ↗
09/19/2026S08025372-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S08055638-I1Open ↗
08/21/2026S08025372-P1Open ↗
08/21/2026S08025372-S1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/21/2026S08025372-P1Open ↗
08/21/2026S08025372-I1Open ↗
08/13/2026S08025372-P3Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/21/2026S08025372-P1Open ↗
08/21/2026S08025372-I1Open ↗
08/13/2026S08025372-P3Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08025372-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08025372-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08025372-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/21/2026S08025372-P1Open ↗
08/21/2026S08025372-I1Open ↗
08/13/2026S08025372-P3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08025372-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/21/2026S08025372-P1Open ↗
08/21/2026S08025372-I1Open ↗
08/13/2026S08025372-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026S08025372-P1Open ↗
08/21/2026S08025372-I1Open ↗
08/13/2026S08025372-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026S08025372-I1Open ↗
08/21/2026S08025372-P1Open ↗
08/13/2026S08025372-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08025372-I1Open ↗