← Back
BuildNYC
One family attached or semi-detached
363 POILLON AVENUE
STATEN ISLAND · BIN 5175912
💬 Discuss this project
2023Year Built
—Stories
A5Building Class
R3-2Zoning
1,775 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 2,954 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic4p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 115p · 2 filings · 20 docs
Basement14p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James V Morri605/16/2024
Rogers Calvanico Group109/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
James V Morri, RA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Madonia DevelopmentGeneral Contractor907/08/2026
Donato Plumbing GroupPlumbing207/08/2026
Catello Electrical ContElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738305/16/2024
James V Morri, RA1042305/16/2024
Building Lifecycle
06/20/2024
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
S08025368-I1-GC
05/20/2024
Special inspection requirement — Subgrade Inspections
James Morri
05/20/2024
Special inspection requirement — Concrete - Cast-In-Place
James Morri
05/20/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/20/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
61 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMadonia Development04/01/2024
DOB NOWPlumbingSigned-offDonato Plumbing Group09/26/2023
DOB NOWPlumbingSigned-offDonato Plumbing Group08/18/2023
DOB NOWGeneral ConstructionSigned-offMadonia Development06/23/2023
DOB NOWFoundationSigned-offMadonia Development06/23/2023
DOB NOWFoundationSigned-offMadonia Development06/23/2023
DOB NOWFoundationPermit IssuedMadonia Development06/20/2023
1 project · most recent 05/16/2024
Sprinkler System
FiledStatusContractorScope
05/16/2024——Sprinkler System
1 project · most recent 05/16/2024
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/16/2024Signed-offDonato Plumbing GroupGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 09/21/2023
General Wiring
FiledStatusContractorScope
09/21/2023CompleteCatello Electrical ContGeneral Wiring
1 project · most recent 05/16/2024
Concrete Wood
FiledStatusContractorScope
05/16/2024Signed-offDonato Plumbing GroupConcrete, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/01/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
05/20/2024Subgrade InspectionsJames Morrispecial
05/20/2024Concrete - Cast-In-PlaceJames Morrispecial
05/20/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
05/20/2024Fire-Resistant Penetrations and JointsJames Morrispecial
05/20/2024Energy Code Compliance InspectionsJames Morriprogress
05/20/2024FinalJames Morriprogress
05/20/2024Fire-Resistance Rated ConstructionJames Morriprogress
05/20/2024Structural Wood FrameJames Morriprogress
05/20/2024Footing and FoundationJames Morriprogress
05/20/2024Fenestration areasJames Morrienergy_progress
05/20/2024Lighting in dwelling unitsJames Morrienergy_progress
05/20/2024MeteringJames Morrienergy_progress
05/20/2024Air barrier - visual inspectionJames Morrienergy_progress
05/20/2024Insulation placement and R valuesJames Morrienergy_progress
05/20/2024Air barrier — testing anthony santoroenergy_progress
05/20/2024HVAC-R and service water piping design and insulationJames Morrienergy_progress
05/20/2024Maintenance informationJames Morrienergy_progress
05/20/2024HVAC-R and service water heating system controlsJames Morrienergy_progress
05/20/2024Permanent certificateJames Morrienergy_progress
05/20/2024Lighting controlsJames Morrienergy_progress
05/20/2024Fenestration air leakageJames Morrienergy_progress
05/20/2024HVAC-R and service water heating equipmentJames Morrienergy_progress
05/20/2024Fenestration and door U-factor and product ratingsJames Morrienergy_progress
05/16/2024Concrete - Cast-In-PlaceJames Morrispecial
Latest 25 of 48.
58 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account