← Back
BuildNYC
Walk-up apt, over six families with stores
364 3RD AVENUE
MANHATTAN · Gramercy · BIN 1018144
💬 Discuss this project
1910Year Built
6Stories
C7Building Class
C2-8Zoning
12,546 sfGross Floor Area
24Units
Rent Stabilized6 Active Violations 1 likely answered ▸
Walk-up apt, over six families with stores · Owner of record: 360-364 Third Owner · 2,755 sf lot · 4.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof7th Street Burger7p · 4 filings · 20 docs
Floor 67th Street Burger5p · 1 filing · 12 docs
Floor 57th Street Burger5p · 1 filing · 12 docs
Floor 47th Street Burger5p · 1 filing · 12 docs
Floor 37th Street Burger5p · 1 filing · 12 docs
Floor 27th Street Burger22p · 3 filings · 20 docs
Floor 17th Street Burger25p · 4 filings · 20 docs
CellarBoiler and oil burner replacement3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
360-364 Third Owner1503/22/2026
Parkview North Realty1103/21/2026
7th Street Burger307/08/2026
360-364 Third Avenue103/21/2026
Grameast Realty103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/27/2015$13.0M—— → —$1,036/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brian McDonough, PE106/24/2025
Sohail Humayun P E109/05/2024
Consulting Engineer401/03/2023
Robert Germain Jr. PE112/12/2022
Edwards & Zuck Consulting Engineers107/07/2022
Bazini Engineering101/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Just Architecture403/21/2026
Sagacity Building Services103/21/2026
Milrose Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Guaranteed Home ImprovemeGeneral Contractor303/21/2026
Siena ConstructionGeneral Contractor203/21/2026
Dja SafetyGeneral Contractor109/07/2026
Borowide Elect'l ContractorsElectrical103/21/2026
M&G Plumbing and HeatingPlumbing107/08/2026
Done Right Hood & Fire SAGeneral Contractor107/08/2026
Paul M. & Son's Electrical ConElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
McDonough Engineering Pra9377106/24/2025
Sohail Humayun P E8457109/05/2024
Consulting Engineer5093401/03/2023
Robert F. Germain Jr. PE5100112/12/2022
Building Lifecycle
All (96)Filed (9)Permit Issued (6)Signed Off (6)Violation (40)Inspection (5)Special Inspection (30)
09/16/2026
Signed off — Alteration
Installation of Kitchen Exhaust Fan, Kitchen Exhaust Hood and associated ductwork as required.
M01230149-I1
09/01/2026
Permit issued — Mechanical Systems
M01230149-I1-MS
08/20/2026
Signed off — Alteration
install kitchen exhaust system
M01032238-I1
07/12/2026
Violation issued (HPD, open)
B
07/12/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, closed)
C
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
C
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, open)
B
06/24/2025
Filed — Alteration
Installation of Kitchen Exhaust Fan, Kitchen Exhaust Hood and associated ductwork as required.
M01230149-I1
05/22/2025
Special inspection requirement — Mechanical Systems
Brian McDonough
05/22/2025
Special inspection requirement — Final
Brian McDonough
09/20/2024
Permit issued — Mechanical Systems
M01032238-I1-MS
09/05/2024
Filed — Alteration
install kitchen exhaust system
M01032238-I1
04/08/2024
Special inspection requirement — Ventilation and air distribution system
SOHAIL HUMAYUN
04/08/2024
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
04/08/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
SOHAIL HUMAYUN
04/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
SOHAIL HUMAYUN
04/08/2024
Special inspection requirement — Final
SOHAIL HUMAYUN
04/08/2024
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
04/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
SOHAIL HUMAYUN
04/08/2024
Special inspection requirement — Duct leakage testing, insulation and design
SOHAIL HUMAYUN
04/08/2024
Special inspection requirement — Maintenance information
SOHAIL HUMAYUN
05/09/2023
Signed off — Alteration
plumbing work for removal, relocate & install plumbing fixtures at apts # 1 &#2 on 1st floor and Apt #5 at 2nd floor indicated on drawings filed herewith. No change in use egress or occupancy under this application
M07993474-I1
05/08/2023
Signed off — Alteration
general construction and mechanical work at apts. #1 & #2 at 1st floor & Apt #5 at 2nd floor indicated on drawings filed herewith. No change in use egress or occupancy under this application.
M07993454-I1
02/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/14/2023
Signed off — Alteration
M08037091-I1
01/26/2023
Permit issued — General Construction
M08037091-I1-GC
01/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
John Natoli
01/09/2023
Special inspection requirement — Lighting in dwelling units
John Natoli
01/09/2023
Special inspection requirement — Metering
John Natoli
01/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
John Natoli
01/09/2023
Special inspection requirement — Energy Code Compliance Inspections
John Natoli
01/09/2023
Special inspection requirement — Final
John Natoli
01/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
John Natoli
01/09/2023
Special inspection requirement — Mechanical Systems
John Natoli
01/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Natoli
01/03/2023
Filed — Alteration
general construction and mechanical work at apts. #1 & #2 at 1st floor & Apt #5 at 2nd floor indicated on drawings filed herewith. No change in use egress or occupancy under this application.
M07993454-P1
01/03/2023
Filed — Alteration
plumbing work for removal, relocate & install plumbing fixtures at apts # 1 &#2 on 1st floor and Apt #5 at 2nd floor indicated on drawings filed herewith. No change in use egress or occupancy under this application
M07993474-P1
01/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
John Natoli
01/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Natoli
01/03/2023
Special inspection requirement — Energy Code Compliance Inspections
John Natoli
12/22/2022
Special inspection requirement — Mechanical Systems
John Natoli
12/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Natoli
12/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
John Natoli
12/22/2022
Special inspection requirement — Energy Code Compliance Inspections
John Natoli
12/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
John Natoli
12/22/2022
Special inspection requirement — Final
John Natoli
12/22/2022
Special inspection requirement — Energy Code Compliance Inspections
John Natoli
12/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/14/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2022
Filed — Alteration
M08037091-I1
11/21/2022
Permit issued — Plumbing
M07993474-I1-PL
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDja Safety09/01/2026
DOB NOWMechanical SystemsSigned-offDone Right Hood & Fire SA09/20/2024
DOB NOWGeneral ConstructionSigned-offGuaranteed Home Improveme01/26/2023
DOB NOWPlumbingSigned-offM&G Plumbing and Heating11/21/2022
DOB NOWMechanical SystemsSigned-offSiena Construction11/18/2022
DOB NOWBoiler EquipmentSigned-offRockway Fuel Oil01/25/2022
BISEQISSUEDArsenal Scaffold01/19/2022
BISEQISSUEDArsenal Scaffold08/03/2020
BISPLISSUEDPilato Brothers Plumbing & Heating Co02/08/2019
BISPLISSUEDPilato Brothers Plumbing & Heating Co02/08/2019
BISOTISSUEDSiena Construction01/31/2019
BISOTISSUEDSiena Construction01/30/2019
BISOTISSUEDSiena Construction09/30/2016
BISPLISSUEDM & M Piping and Heating07/20/2016
BISPLISSUEDM & M Piping and Heating06/30/2016
BISMHISSUEDSiena Construction06/28/2016
BISEQISSUEDSiena Construction06/23/2016
BISEQISSUEDEverest Scaffolding06/21/2016
BISMHISSUEDSiena Construction06/20/2016
BISMHISSUEDSiena Construction04/26/2016
BISPLISSUEDM & M Piping and Heating04/26/2016
BISOTISSUEDSiena Construction04/22/2016
BISOTISSUEDSiena Construction11/10/2015
BISPLISSUEDM & M Piping and Heating07/13/2015
BISOTISSUEDSiena Construction05/08/2015
BISEQISSUEDRock Scaffolding08/17/2010
BISFBISSUEDIrving Bavlitsky12/06/2004
BISFPISSUEDMaster Fire Prev Systems03/20/1997
2 projects · most recent 06/24/2025
Ventilation Systems Others
FiledStatusContractorScopeMake / Model / Capacity
06/24/2025Signed-offDja SafetyVentilation Systems
Ventilation
Captiveaire DU85HFA 2,500 CFM · Kitchen Exhaust ×1
07/07/2022——Others, Ventilation Systems
Ventilation
Enervex RSV014 300 CFM · Exhaust Fan ×1
5 projects · most recent 08/09/2023
General Wiring Boiler Controls
FiledStatusContractorScope
08/09/2023Permit IssuedPaul M. & Son's Electrical ConGeneral Wiring
11/28/2022CompletePaul M. & Son's Electrical ConGeneral Wiring
01/03/2022CompleteRaleigh Powell Lic ElectricBoiler Controls
02/04/2020Permit IssuedPaul M. & Son's Electrical ConGeneral Wiring
02/08/2019CompletePaul M. & Son's Electrical ConGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
05/22/2025Mechanical SystemsBrian McDonoughspecial
05/22/2025FinalBrian McDonoughprogress
04/08/2024Ventilation and air distribution systemSOHAIL HUMAYUNenergy_progress
04/08/2024Mechanical SystemsSOHAIL HUMAYUNspecial
04/08/2024Exhaust and Vent Systems in Plenums and DuctsSOHAIL HUMAYUNspecial
04/08/2024Tenant Protection Plan ComplianceSOHAIL HUMAYUNspecial
04/08/2024FinalSOHAIL HUMAYUNprogress
04/08/2024Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
04/08/2024Fire-Resistance Rated ConstructionSOHAIL HUMAYUNprogress
04/08/2024Duct leakage testing, insulation and designSOHAIL HUMAYUNenergy_progress
04/08/2024Maintenance informationSOHAIL HUMAYUNenergy_progress
01/09/2023HVAC-R and service water heating system controlsJohn Natolienergy_progress
01/09/2023Lighting in dwelling unitsJohn Natolienergy_progress
01/09/2023MeteringJohn Natolienergy_progress
01/09/2023HVAC-R and service water piping design and insulationJohn Natolienergy_progress
01/09/2023Energy Code Compliance InspectionsJohn Natoliprogress
01/09/2023FinalJohn Natoliprogress
01/09/2023Fire-Resistance Rated ConstructionJohn Natoliprogress
01/09/2023Mechanical SystemsJohn Natolispecial
01/09/2023Fire-Resistant Penetrations and JointsJohn Natolispecial
01/03/2023HVAC-R and service water piping design and insulationJohn Natolienergy_progress
01/03/2023Fire-Resistant Penetrations and JointsJohn Natolispecial
01/03/2023Energy Code Compliance InspectionsJohn Natoliprogress
12/22/2022Mechanical SystemsJohn Natolispecial
12/22/2022Fire-Resistant Penetrations and JointsJohn Natolispecial
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
7th Street BurgerRestaurant / Food ServiceFloors 1–6, Roof
Project M01032238 Alteration · LOC Issued · 09/05/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 308 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026M00654880-I1Request digital key ↗
09/02/2026M00670946-I1Request digital key ↗
09/01/2026M07993474-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION43
04/09/2022140976442Open ↗
11/10/2020140976442Open ↗
09/23/2019123656533Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION21
08/29/2019123656533Open ↗
08/22/2019140865632Open ↗
02/11/2019123401522Open ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications85
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
10/08/2019123656533Open ↗
10/08/2019123656533Open ↗
09/19/2019123401522Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026M01032238-I1Open ↗
09/02/2026M01032238-I1Open ↗
09/02/2026M01032238-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026M01032238-I1Open ↗
09/02/2026M01032238-I1Open ↗
09/02/2026M01032238-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026M00670946-I1Open ↗
09/01/2026M07993474-I1Open ↗
09/01/2026M07993474-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/22/2019140865632Open ↗
01/22/2019123656533Open ↗
01/17/2019123401522Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
01/22/2019123656533Open ↗
01/17/2019123401522Open ↗
07/06/2016122785655Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/22/2019140865632Open ↗
06/17/2016140510551Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/22/2019140865632Open ↗
06/17/2016140510551Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/10/2020140976442Open ↗
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
08/19/2019123401522Open ↗
08/14/2019123401522Open ↗
04/04/2019123401522Open ↗
Showing 3 of 23 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes8
11/18/2020140976442Open ↗
01/22/2019123656533Open ↗
01/17/2019123401522Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos19
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
11/10/2020140976442Open ↗
01/22/2019123656533Open ↗
01/17/2019123401522Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026M00670946-I1Open ↗
09/01/2026M07993474-P1Open ↗
09/01/2026M07993474-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
10/08/2019123656533Open ↗
09/19/2019123401522Open ↗
01/22/2019123656533Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
10/08/2019123656533Open ↗
09/19/2019123401522Open ↗
11/28/2016122781668Open ↗
Showing 3 of 7 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/17/2016140510551Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/03/2021140976442Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/10/2020140976442Open ↗
08/22/2019140865632Open ↗
06/17/2016140510551Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
03/25/2022140865632Open ↗
10/08/2019123656533Open ↗
09/19/2019123401522Open ↗
Showing 3 of 13 on file for this type
▸BISFINAL1
03/24/2022140865632Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
11/10/2020140976442Open ↗
10/08/2019123656533Open ↗
09/19/2019123401522Open ↗
Showing 3 of 14 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms38
▸BISBOROUGH INTAKE FORM16
10/08/2019123656533Open ↗
09/19/2019123401522Open ↗
09/19/2019123656533Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION11
02/01/2021140976442Open ↗
01/24/2021140976442Open ↗
12/05/2020140976442Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET8
01/22/2019123656533Open ↗
01/17/2019123401522Open ↗
07/06/2016122785655Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/10/2020140976442Open ↗
08/22/2019140865632Open ↗
06/17/2016140510551Open ↗
▸Other Documents3
▸BISDepartment of Consumer Affairs (DCA) Form2
02/01/2019123656533Open ↗
06/30/2016122812732Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/17/2016140510551Open ↗