← Back
Elevator co-op, conversion from loft/warehouse
Collect Pond House
364 BROADWAY · BIN 1001862
💬 Discuss this project
1909Year Built
12Stories
D0Building Class
C6-4AZoning
93,378 sfGross Floor Area
39Units
LL97 CoveredRent Stabilized30 Open Violations 28 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator co-op, conversion from loft/warehouse · Owner of record: COLLECT POND HOUSE INC · 7,501 sf lot · 12.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Roof8p · 4 filings · 20 docs
Bulkhead6p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar6p · 2 filings · 20 docs
Sub-Cellar1p · 1 filing · 14 docs
1 job · most recent 01/30/2026
Water/Sanitary
FiledStatusContractorScope
01/30/2026——Water/Sanitary
8 jobs · most recent 07/23/2025
General Wiring
FiledStatusContractorScope
07/23/2025Permit IssuedFIU CORP DBA FIU ELECTRICGeneral Wiring
10/12/2023Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/15/2023CompleteGLENDALE ELECTL CONTNG IN—
07/06/2022CompleteINFINITY ELECTRIC, INCGeneral Wiring
01/24/2022CompleteMATROS AUTOMATED ELEC'L C—
11/16/2021CompleteESSEX ELECTRIC INCGeneral Wiring
01/17/2020Permit IssuedTUXEDO ELEC'L CONTR'G INC—
09/10/2018CompleteSTEVEN FARKAS—
1 job · most recent 03/05/2026
Steel Concrete
FiledStatusContractorScope
03/05/2026——Steel, Concrete
1 job · most recent 08/01/2023
Sidewalk Shed
FiledStatusContractorScope
08/01/2023Signed-offNEW AMSTERDAM RESTORATIONSidewalk Shed
Building Lifecycle
All (216)Filed (24)Permit Issued (21)Signed Off (8)Facade (FISP) (21)Violation (60)Inspection (2)Objection (50)Special Inspection (30)
08/06/2026
Filed — Alteration
Localized masonry repairs and replacement of lower roof for waterproofing.
M01300414-P2
07/17/2026
Signed off — Alteration
LOCALIZED TERRACOTA REPLACEMENT AND PATCHING, LOCALIZED MASONRY REPAIRS AND STONE PATCHING,LOCALIZED LINTEL AND WINDOW SILL REPLACEMENT, PREPARE, PRIME AND PAINT OF CAST IRON FIGURINES AND MISCELLOANEOUS METALWINDOW PANELS AND SURFACES as per plans filed
M01391257-I1
07/07/2026
Signed off — Alteration
M00865313-I1
07/07/2026
Permit issued — General Construction
M01391257-I1-GC
06/11/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00883647-I1
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/21/2026
Special inspection requirement — Lighting in dwelling units
05/21/2026
Special inspection requirement — Air barrier - visual inspection
05/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/21/2026
Special inspection requirement — Fenestration air leakage
05/21/2026
Special inspection requirement — Insulation placement and R values
05/21/2026
Special inspection requirement — Exterior lighting power
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/21/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
05/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/21/2026
Special inspection requirement — Final
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
05/20/2026
Objection raised — Scope
05/20/2026
Objection resolved — Addressed
05/20/2026
Objection raised — Scope
05/20/2026
Objection resolved — Addressed
05/11/2026
Filed — Alteration
LOCALIZED TERRACOTA REPLACEMENT AND PATCHING, LOCALIZED MASONRY REPAIRS AND STONE PATCHING,LOCALIZED LINTEL AND WINDOW SILL REPLACEMENT, PREPARE, PRIME AND PAINT OF CAST IRON FIGURINES AND MISCELLOANEOUS METALWINDOW PANELS AND SURFACES as per plans filed
M01391257-I1
05/05/2026
Special inspection requirement — Air barrier - visual inspection
PIETRO ROSATO
05/05/2026
Special inspection requirement — Exterior lighting power
PIETRO ROSATO
05/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/05/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
05/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
PIETRO ROSATO
05/05/2026
Special inspection requirement — Insulation placement and R values
PIETRO ROSATO
05/05/2026
Special inspection requirement — Fenestration air leakage
PIETRO ROSATO
05/05/2026
Special inspection requirement — Lighting in dwelling units
PIETRO ROSATO
05/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
PIETRO ROSATO
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
04/22/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
04/22/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SAMI HAJJAR P.E
04/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
04/22/2026
Special inspection requirement — Air barrier - visual inspection
ERIC BERLENT
04/22/2026
Special inspection requirement — Final
Christa Waring
04/10/2026
Objection resolved — Resolved
04/06/2026
Objection resolved — Resolved
03/24/2026
Objection raised — Scope
03/24/2026
Objection raised — Cost
03/16/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/06/2026
Objection resolved — Addressed
03/05/2026
Filed — Alteration
Structural work for Floor slab and panel repairs as per plans filed herewith. no change to use, egress or occupancy.
M01327323-S1
03/03/2026
Objection resolved — Addressed
03/02/2026
Objection raised — Admin
02/24/2026
Filed — Alteration
Localized masonry repairs and replacement of lower roof for waterproofing.
M01300414-I1
02/20/2026
Objection raised — Scope
02/20/2026
Objection raised — Zoning
02/20/2026
Objection raised — Scope
02/20/2026
Objection raised — Scope
02/20/2026
Objection raised — Scope
02/20/2026
Objection raised — Cost
02/20/2026
Objection raised — Energy
Latest 60 of 216 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRSTSERVICE RESIDENTIAL208/29/2026
ACCARDO ENGINEERING, PLLC507/08/2026
SPRING SCAFFOLDING LLC1103/22/2026
COLLACT POND INC EILEEN103/22/2026
COLLAT POND HOUSE INC EIL103/22/2026
ANDREWS BUIILDING CORP503/22/2026
ANDREWS MANAGEMENT303/22/2026
COLLECT POND INC ANDREWS103/22/2026
COLLECT POND HOUSE INC C O ANDRE203/21/2026
UNIT OWNER103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CTA ARCHITECTS508/06/2026
PIRO STUDIO LLC601/30/2026
OLD STRUCTURES ENGINEERING212/08/2025
URBAN INTEGRATIONS308/01/2023
HC ARCHITECT, PC101/13/2022
ISAAC - RAE LLC109/01/2020
ASHRAF CORP408/22/2019
BAILEYS ENGINEERING PC102/14/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1203/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
Rigid Structural Design, LLC403/21/2026
HH BUILDING CONSULTING & ARCHITECTU803/21/2026
HANOK103/21/2026
AE DESIGN SOLUTION203/21/2026
BOYD CONSULTING203/21/2026
BIG ORANGE EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor1107/08/2026
NEW AMSTERDAM RESTORATIONGeneral Contractor1107/09/2026
SPRING SCAFFOLDING LLCGeneral Contractor903/21/2026
MP & L METAL INCElectrical103/21/2026
PETER DANIELSSONElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
BREND RESTORATION LLCGeneral Contractor107/08/2026
LEWIS CONSTRUCTION NYC INGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
JURGEN WRIEDTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004405/11/2026
METRIC CONSULTING AND INS1803305/11/2026
CHEN ENGINEERING SERVICES1826107/06/2021
ISAAC-RAE LLC6733109/01/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM RESTORATION07/07/2026
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION05/06/2025
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM RESTORATION05/06/2025
DOB NOWSuspended ScaffoldSigned-offNEW AMSTERDAM RESTORATION03/14/2025
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION06/03/2024
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM RESTORATION06/03/2024
DOB NOWSuspended ScaffoldSigned-offNEW AMSTERDAM RESTORATION03/11/2024
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM RESTORATION06/27/2023
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION06/15/2023
DOB NOWStructuralPermit IssuedBREND RESTORATION LLC06/13/2022
DOB NOWGeneral ConstructionSigned-offLEWIS CONSTRUCTION NYC IN03/29/2022
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC11/09/2021
DOB NOWPlumbingSigned-offNICHOLAS SUIDA09/30/2020
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION10/01/2019
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/25/2019
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/24/2019
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION07/23/2019
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/15/2019
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/14/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/27/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/14/2018
BISOTISSUEDJEPOL CONSTRUCTION INC02/03/2021
BISOTISSUEDJEPOL CONSTRUCTION INC02/03/2021
BISOTISSUEDAROUND THE CLOCK CNSN GRP08/12/2020
BISOTISSUEDAROUND THE CLOCK CNSN GRP07/07/2020
BISOTISSUEDKBRNY, INC05/26/2020
BISOTISSUEDKBRNY, INC05/26/2020
BISOTISSUEDAROUND THE CLOCK CNSN GRP03/13/2020
BISOTISSUEDJEPOL CONSTRUCTION INC02/03/2020
BISOTISSUEDJEPOL CONSTRUCTION INC02/03/2020
BISPLISSUEDTMS PLBG & HEATING CORP07/18/2019
BISPLISSUEDTESTERMAN PLBG & HTG INC05/10/2019
BISOTISSUEDEPC CONTRACTING INC04/23/2019
BISOTISSUEDEPC CONTRACTING INC04/16/2019
BISOTISSUEDJEPOL CONSTRUCTION INC01/31/2019
BISOTISSUEDJEPOL CONSTRUCTION INC01/31/2019
BISOTISSUEDJEPOL CONSTRUCTION INC01/31/2019
BISPLISSUEDDEMAR PLUMBING CORP12/18/2018
BISFBISSUEDDEMAR PLUMBING CORP12/18/2018
BISOTISSUEDJEPOL CONSTRUCTION INC01/31/2018
+ 31 more permits on file
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/08/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/22/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
05/21/2026Fire-Resistance Rated Construction—progress
05/21/2026Lighting in dwelling units—energy_progress
05/21/2026Air barrier - visual inspection—energy_progress
05/21/2026Fenestration and door U-factor and product ratings—energy_progress
05/21/2026Fenestration air leakage—energy_progress
05/21/2026Insulation placement and R values—energy_progress
05/21/2026Exterior lighting power—energy_progress
05/21/2026Structural Stability – Alterations of existing buildings—special
05/21/2026Fire-Resistant Penetrations and Joints—special
05/21/2026Exterior Insulation and Finish Systems (EIFS)—special
05/21/2026Tenant Protection Plan Compliance—special
05/21/2026Final—progress
05/21/2026Energy Code Compliance Inspections—progress
05/05/2026Air barrier - visual inspectionPIETRO ROSATOenergy_progress
05/05/2026Exterior lighting powerPIETRO ROSATOenergy_progress
05/05/2026Tenant Protection Plan Compliance—special
05/05/2026Structural Stability – Alterations of existing buildings—special
05/05/2026Exterior Insulation and Finish Systems (EIFS)—special
05/05/2026Fenestration and door U-factor and product ratingsPIETRO ROSATOenergy_progress
05/05/2026Insulation placement and R valuesPIETRO ROSATOenergy_progress
05/05/2026Fenestration air leakagePIETRO ROSATOenergy_progress
05/05/2026Lighting in dwelling unitsPIETRO ROSATOenergy_progress
05/05/2026Fire-Resistance Rated ConstructionPIETRO ROSATOprogress
04/22/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
04/22/2026MasonrySAMI HAJJAR P.Especial
Latest 25 of 60.
▾Documents — 1,166 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch18
09/06/2026M00018105-I1Request digital key ↗
09/06/2026M00079143-I1Request digital key ↗
09/03/2026M00536263-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00197816-I1Request digital key ↗
08/15/2026M00197816-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/06/2026M00079143-P1Request digital key ↗
09/06/2026M00079143-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00314181-I1Request digital key ↗
▸Applications & Permits273
▸BISWORK PERMIT APPLICATION131
03/16/2020123701324Open ↗
10/08/2019140841061Open ↗
10/08/2019140841061Open ↗
Showing 3 of 131 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION128
01/11/2023121799312Open ↗
10/31/2022122230923Open ↗
06/02/2022122057656Open ↗
Showing 3 of 128 on file for this type
▸DOB NOWLPC Approval/Permit12
08/15/2026M00614259-I1Open ↗
08/14/2026M01391257-I1Open ↗
08/13/2026M00882273-S2Open ↗
Showing 3 of 12 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/10/2019121184262Open ↗
▸Seals & Professional Certifications212
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION132
03/13/2020123701324Open ↗
01/27/2020123701324Open ↗
12/16/2019140838360Open ↗
Showing 3 of 132 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/06/2026M00079143-P1Open ↗
09/06/2026M00079143-I1Open ↗
09/03/2026M00614259-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026M00314181-I1Open ↗
08/28/2026M01327323-S1Open ↗
08/26/2026M00536263-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026M00197816-I1Open ↗
08/26/2026M00536263-I1Open ↗
08/23/2026M01391257-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
04/29/2019140845110Open ↗
04/11/2019140841061Open ↗
03/27/2019140838360Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment122
▸BISSELF-CERT PLUMBING NOTICE43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISSCHEDULE B - PLUMBING29
07/15/2020140845110Open ↗
04/29/2019140845110Open ↗
03/27/2019140838360Open ↗
Showing 3 of 29 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
04/13/2020140838360Open ↗
10/11/2019122187846Open ↗
07/25/2019122187846Open ↗
Showing 3 of 26 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
07/12/2019122400437Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes7
01/27/2020123701324Open ↗
04/11/2019140841061Open ↗
03/27/2019140838360Open ↗
Showing 3 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00197816-P1Open ↗
08/13/2026M00197816-I1Open ↗
08/13/2026M00314181-I1Open ↗
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos66
▸BISASBESTOS: CERTIFICATION (DEP ACP5)32
03/04/2020123701324Open ↗
02/25/2020123701324Open ↗
09/26/2019122086562Open ↗
Showing 3 of 32 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/31/2026M00865313-I1Open ↗
08/25/2026M00882273-S3Open ↗
08/25/2026M00882273-S2Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance68
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
01/27/2020123701324Open ↗
12/16/2019140838360Open ↗
12/13/2019140841061Open ↗
Showing 3 of 35 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
09/25/2020140845110Open ↗
12/16/2019140838360Open ↗
12/13/2019140841061Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/25/2020140845110Open ↗
07/05/2019140845110Open ↗
06/25/2019140841061Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/27/2022123701324Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/27/2022123701324Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY19
11/18/2022122230923Open ↗
11/07/2022122230923Open ↗
08/31/2022122230923Open ↗
Showing 3 of 19 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
05/31/2022122187846Open ↗
01/28/2022123701324Open ↗
01/28/2022123701324Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/28/2022123701324Open ↗
▸Approvals, Objections & Sign-offs119
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST40
11/18/2022122230923Open ↗
02/03/2022123701324Open ↗
12/13/2021122086562Open ↗
Showing 3 of 40 on file for this type
▸BISLANDMARKS APPROVAL39
03/04/2020123701324Open ↗
02/25/2020123701324Open ↗
12/16/2019140838360Open ↗
Showing 3 of 39 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLANDMARKS SIGNOFF3
12/13/2021122086562Open ↗
09/25/2020140845110Open ↗
04/11/2019140841061Open ↗
▸BISFINAL2
05/31/2022122187846Open ↗
01/28/2022123701324Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLandmark Approval1
08/13/2026M01300414-I1Open ↗
▸Cost, Insurance & Ownership105
▸BISCOST AFFIDAVIT100
11/18/2022122230923Open ↗
11/07/2022122230923Open ↗
12/10/2021122086562Open ↗
Showing 3 of 100 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/31/2022122230923Open ↗
01/27/2022123701324Open ↗
▸Filing & Intake Forms114
▸BISEFILING COVER SHEET45
01/27/2020123701324Open ↗
Showing 1 of 45 on file for this type
▸BISADDITIONAL INFORMATION45
07/11/2022122057656Open ↗
08/25/2020140845110Open ↗
06/16/2020122086562Open ↗
Showing 3 of 45 on file for this type
▸BISBOROUGH INTAKE FORM16
04/13/2020140838360Open ↗
04/13/2020122086562Open ↗
12/16/2019140838360Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
04/29/2019140845110Open ↗
04/11/2019140841061Open ↗
03/27/2019140838360Open ↗
Showing 3 of 8 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M00882273-I1Open ↗
08/13/2026M00882273-P1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01016732-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01016732-I1Open ↗