Condo, residential unit in elevator building
Prospect Condominium
364 ST MARKS AVENUE · BIN 3378994
💬 Discuss this project
2005Year Built
6Stories
R4Building Class
R6AZoning
19,817 sfGross Floor Area
29Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Condo, residential unit in elevator building · Owner of record: PROSPECT CONDOMINIUM LLC · 7,940 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Floor 33p · 1 filing · 17 docs
Floor 2Under Construction3p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHOICE NY MGMT907/08/2026
AJ CONTRACTOR1007/08/2026
PROSPECT CONDO803/22/2026
WNG CONSTRUCTION103/22/2026
ANCOR CONSTR SERVICES INC103/22/2026
SKYWORX CONTRACTING203/21/2026
1848 2ND AVENUE2203/21/2026
PHOENIX 132 SUTTON STREET203/21/2026
SAINT MARKS AVENUE LOFTS CONDO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HPG GROUP INCGeneral Contractor607/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor303/21/2026
A & J CONTRACTORS CO INCGeneral Contractor304/09/2026
AMERICAN STANDARD PLUMBING &Fire Protection207/08/2026
G.P. MECHANICAL CORPPlumbing207/08/2026
AQUEDUCT MECHANICAL CORPFire Protection107/08/2026
ELIO CONSTRUCTION CORPGeneral Contractor104/11/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor104/09/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
FLINT MECHANICAL CORPPlumbing107/08/2026
A ELECTRICAL MAIN SVC INCElectrical103/22/2026
JADA PLUMBING & HTG LLCPlumbing107/08/2026
ANI ELECTRIC CORPElectrical103/22/2026
TORRES IVANElectrical103/21/2026
TROADIO MENENDEZElectrical103/21/2026
WILLIAM GEIGERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN INTEGRATIONS LLC7993209/15/2025
RYAN SPECIAL ENGINEERING2018207/19/2025
MIDTOWN PRESERVATION ARCH2634106/11/2025
LPE ENGINEERING PC3102106/11/2025
WINTON GROUP ARCHITECTURE4343610/28/2024
HARPER ARCHITECTURE, PC6851504/24/2023
D'ANTONIO CONSULTING ENGI931604/24/2023
CELIN MUNOZ CONSULTING EN1064403/23/2022
Building Lifecycle
All (179)Filed (21)Permit Issued (20)Signed Off (13)Violation (28)Inspection (19)Objection (48)Special Inspection (30)
04/17/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
04/09/2026
Signed off — Alteration
General construction related to the bathroom renovation of apartment 2C on the 2nd floor.
B01076593-S1
04/09/2026
Signed off — Alteration
General construction related to the bathroom renovation of apartment 2C on the 2nd floor.
B01076593-I1
03/30/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01277463-I1
03/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/26/2026
Signed off — Alteration
FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01073556-I1
02/26/2026
Permit issued — Plumbing
B01076593-S1-PL
02/06/2026
Signed off — Alteration
B01304036-I1
02/06/2026
Signed off — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01281607-I1
02/06/2026
Permit issued — Supported Scaffold
B01304036-I1-SF
01/16/2026
Permit issued — Sidewalk Shed
B01277463-I1-SH
12/26/2025
Permit issued — General Construction
B01073556-I1-GC
12/24/2025
Permit issued — Suspended Scaffold
B01281607-I1-SC
10/22/2025
Filed — Alteration
B01304036-I1
10/10/2025
Violation issued (ECB, closed)
Unknown
10/10/2025
Violation issued (ECB, closed)
Construction
10/10/2025
Violation issued (ECB, closed)
Construction
09/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
09/22/2025
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
09/22/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
09/15/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01281607-P1
09/12/2025
Permit issued — Suspended Scaffold
B01281607-I1-SC
09/11/2025
Permit issued — General Construction
B01073556-I1-GC
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
09/11/2025
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
09/11/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
09/09/2025
Objection raised — Structural
09/09/2025
Objection resolved — Addressed
09/08/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01281607-I1
08/28/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01277463-I1
08/28/2025
Permit issued — Sidewalk Shed
B01277463-I1-SH
08/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/01/2025
Permit issued — Plumbing
B01076593-S1-PL
07/19/2025
Filed — Alteration
General construction related to the bathroom renovation of apartment 2C on the 2nd floor.
B01076593-S1
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Phu Duong
07/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Phu Duong
06/30/2025
Permit issued — General Construction
B01076593-I1-GC
06/11/2025
Filed — Alteration
FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01073556-I1
05/14/2025
Signed off — Alteration
HEREBY FILING FOR INSTALLATION OF HVAC MECHANICAL EQUIPMENT FOR UNIT 2A/2B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01062742-S1
05/14/2025
Signed off — Alteration
HEREBY FILING FOR INSTALLATION OF HVAC MECHANICAL EQUIPMENT FOR UNIT 2A/2B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01062742-S4
05/13/2025
Signed off — Alteration
HEREBY FILING FOR INSTALLATION OF HVAC MECHANICAL EQUIPMENT FOR UNIT 2A/2B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01062742-S3
05/13/2025
Signed off — Alteration
HEREBY FILING FOR INSTALLATION OF HVAC MECHANICAL EQUIPMENT FOR UNIT 2A/2B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01062742-I1
04/23/2025
Permit issued — Mechanical Systems
B01062742-S3-MS
03/10/2025
Violation issued (ECB, open)
Construction
02/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS BROWN
10/30/2024
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS BROWN
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
10/29/2024
Special inspection requirement — Sprinkler Systems
Vladimir Kaushansky
10/28/2024
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF HVAC MECHANICAL EQUIPMENT FOR UNIT 2A/2B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01062742-P2
10/25/2024
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF HVAC MECHANICAL EQUIPMENT FOR UNIT 2A/2B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01062742-P1
10/24/2024
Special inspection requirement — Sprinkler Systems
Vladimir Kaushansky
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJADA PLUMBING & HTG LLC02/26/2026
DOB NOWSupported ScaffoldSigned-offA & J CONTRACTORS CO INC02/06/2026
DOB NOWSidewalk ShedSigned-offINTERSYSTEM CONSTRUCTION01/16/2026
DOB NOWGeneral ConstructionSigned-offA & J CONTRACTORS CO INC12/26/2025
DOB NOWSuspended ScaffoldSigned-offVICHIHEL RESTORATION INC12/24/2025
DOB NOWSuspended ScaffoldSigned-offVICHIHEL RESTORATION INC09/12/2025
DOB NOWGeneral ConstructionSigned-offA & J CONTRACTORS CO INC09/11/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S08/28/2025
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP08/01/2025
DOB NOWGeneral ConstructionSigned-offELIO CONSTRUCTION CORP06/30/2025
DOB NOWMechanical SystemsSigned-offHPG GROUP INC04/23/2025
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP10/02/2024
DOB NOWGeneral ConstructionSigned-offHPG GROUP INC07/29/2024
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP07/26/2024
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP02/28/2023
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN02/28/2023
DOB NOWMechanical SystemsSigned-offHPG GROUP INC12/30/2021
DOB NOWPlumbingSigned-offAMERICAN STANDARD PLUMBIN12/29/2021
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP12/28/2021
DOB NOWGeneral ConstructionSigned-offHPG GROUP INC12/22/2021
BISPLISSUEDABR PLBG&HTG CONTR INC08/02/2018
BISOTISSUEDSKYLER PROPERTY SERVICES08/01/2018
BISPLISSUEDJ.A. MECH. PLBG. & HTG IN01/11/2018
BISOTISSUEDADAM B. CONTTRACTING INC12/27/2017
BISEQISSUEDSKYRISE GENERAL CONTRACTO06/16/2016
BISEQISSUEDPHEONIX 132 SUTTON STREET08/25/2010
BISEQISSUEDPHEONIX 132 SUTTON STREET08/23/2010
BIS—ISSUEDWGW INC09/06/2007
BISPLISSUEDJ CRISERA PLBG08/24/2007
BISEQISSUEDWGW INC04/12/2007
BIS—ISSUEDWGW INC04/12/2007
BISEQISSUEDW & G CONSTRUCTION INC.01/02/2007
BIS—ISSUEDW & G CONSTRUCTION INC.09/01/2006
BISSPISSUEDSAFETY FIRE SPRINKLER CORP04/25/2006
BISEQISSUEDW & G CONSTRUCTION INC.03/29/2006
BIS—ISSUEDW & G CONSTRUCTION INC.03/29/2006
BISPLISSUEDJ. CRISERA PLBG & HTG CORP02/08/2006
BISEQISSUEDW & G CONSTRUCTION INC.12/15/2005
BISEQISSUEDW & G CONSTRUCTION INC.12/15/2005
BIS—ISSUEDW & G CONSTRUCTION INC.09/02/2005
+ 9 more permits on file
8 projects · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026CompleteADAM ELECL CONTRNG LLC—
10/22/2025CancelledADAM ELECL CONTRNG LLC—
09/04/2025Permit IssuedAURORA ELECL CONTG INC—
07/24/2025CompleteKJK ELECTRIC INC—
03/30/2025CompleteANI ELECTRIC CORPGeneral Wiring
09/09/2022CompleteRIVERDALE ELEC'L SERV INCGeneral Wiring
01/24/2022CompleteKWONG MING ELECTRIC INCGeneral Wiring
01/08/2018CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
04/17/2026Pass-Final Sign Permit InspectionPassView ↗
03/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
09/22/2025Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
09/22/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
09/22/2025Post-installed AnchorsDANNY TRUJILLOspecial
09/11/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
09/11/2025Post-installed AnchorsDANNY TRUJILLOspecial
09/11/2025Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
07/18/2025HVAC-R and service water piping design and insulationPhu Duongenergy_progress
07/18/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
07/18/2025Energy Code Compliance InspectionsPhu Duongprogress
10/30/2024Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
10/30/2024Energy Code Compliance InspectionsNICHOLAS BROWNprogress
10/30/2024HVAC-R and service water piping design and insulationNICHOLAS BROWNenergy_progress
10/29/2024Sprinkler SystemsVladimir Kaushanskyspecial
10/24/2024Sprinkler SystemsVladimir Kaushanskyspecial
10/23/2024Energy Code Compliance InspectionsNICHOLAS BROWNprogress
10/23/2024Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
10/23/2024HVAC-R and service water piping design and insulationNICHOLAS BROWNenergy_progress
10/07/2024MasonryDennis Melespecial
07/15/2024Tenant Protection Plan ComplianceRoberta Levinespecial
07/05/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
07/05/2024Energy Code Compliance InspectionsPhu Duongprogress
07/05/2024FinalPhu Duongprogress
07/05/2024Interior lighting powerPhu Duongenergy_progress
07/05/2024Lighting in dwelling unitsPhu Duongenergy_progress
07/05/2024Lighting controlsPhu Duongenergy_progress
Latest 25 of 78.
▾Documents — 241 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/31/2026B00624966-P1Request digital key ↗
08/31/2026B00624966-P4Request digital key ↗
08/31/2026B00624966-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION10
07/17/2019340688526Open ↗
09/28/2018321773130Open ↗
07/26/2018321773130Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION7
07/17/2019340688526Open ↗
08/15/2018321773130Open ↗
01/11/2018321688143Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
09/27/2018321773130Open ↗
08/29/2018321688143Open ↗
06/06/2018321688143Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications119
▸DOB NOWProgress Inspector Seal & Signature45
09/02/2026B00624966-P2Open ↗
09/02/2026B00624966-P2Open ↗
09/01/2026B01076593-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/02/2026B00624966-P2Open ↗
09/02/2026B00624966-P2Open ↗
09/01/2026B01076593-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/31/2026B00624622-P1Open ↗
08/31/2026B00624622-I1Open ↗
08/31/2026B00624966-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
12/21/2019340688526Open ↗
02/07/2019321688143Open ↗
01/02/2019321688143Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/17/2019340688526Open ↗
06/15/2016340391864Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/25/2010320210115Open ↗
08/24/2010320206291Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/17/2019340688526Open ↗
06/15/2016340391864Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/25/2010320210115Open ↗
08/24/2010320206291Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/17/2019340688526Open ↗
06/15/2016340391864Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
07/19/2018321773130Open ↗
06/14/2018321773130Open ↗
06/11/2018321688143Open ↗
Showing 3 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
08/29/2018321688143Open ↗
06/06/2018321688143Open ↗
03/23/2018321688143Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
06/14/2018321773130Open ↗
11/21/2017321688143Open ↗
07/17/2019340688526Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026B00624966-I1Open ↗
08/31/2026B00624966-P4Open ↗
08/31/2026B00624966-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/24/2010320206291Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/25/2010320210115Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/26/2018321773130Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/21/2019340688526Open ↗
11/20/2018321773130Open ↗
06/14/2018321773130Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
12/21/2019340688526Open ↗
01/02/2019321688143Open ↗
11/20/2018321773130Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/15/2026B00624622-I1Open ↗
08/13/2026B00624966-I1Open ↗
08/13/2026B00624700-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/19/2019340688526Open ↗
07/17/2019340688526Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/17/2019340688526Open ↗
▸BISNYCECC ANALYSIS1
07/17/2019340688526Open ↗
▸BISINTERIOR LIGHTING POWER1
07/17/2019340688526Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/19/2019340688526Open ↗
07/17/2019340688526Open ↗
06/15/2016340391864Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/21/2019340688526Open ↗
02/07/2019321688143Open ↗
01/02/2019321688143Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/20/2026B01277463-I1Open ↗
08/13/2026B01281607-I1Open ↗
08/13/2026B01304036-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
08/25/2010320210115Open ↗
08/24/2010320206291Open ↗
▸BISFINAL1
07/17/2019340688526Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
12/21/2019340688526Open ↗
07/17/2019340688526Open ↗
01/02/2019321688143Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms15
▸BISBOROUGH INTAKE FORM6
12/21/2019340688526Open ↗
02/07/2019321688143Open ↗
01/02/2019321688143Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
06/14/2018321773130Open ↗
11/21/2017321688143Open ↗
08/25/2010320210115Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
10/22/2018321773130Open ↗
10/22/2018321773130Open ↗
03/01/2018321688143Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/17/2019340688526Open ↗
06/15/2016340391864Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/02/2019321688143Open ↗
12/19/2017321688143Open ↗
▸DOB NOWCalculations2
08/13/2026B01281607-P1Open ↗
08/13/2026B01281607-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01281607-I1Open ↗
08/13/2026B01281607-P1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B01277463-P1Open ↗