DOB01/02/2026DOB INTENT TO REVOKE APPROVAL(S) AND PERMIT(S) APPLICATION #X00750693-I1 DUE TO SPECIAL INSPECTOR WITHDRAWAL.
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
ECB11/05/2022I OBSERVED SIDEWALK SHED(SWS) AT EXP1 AND 2 NOT HAVING ANY LIGHTS INSTALLED-BC3307.6.4.8. ALSO SWS AT CORNER EXP1,2, DOES NOT MAINTAIN 8F MINIMUM HEIGHT CLEARANCE AS REQUIRED BY BC3307.6.4.7.MOREOVER SWS IS MIS$2K due
ECB04/29/2022FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. I OBSERVED THE FRONT BRICK PARAPET WALL DEFECTIVE WITH NUMEROUS CRACKS AND MISSING MORTAR THROUGHOUT. NOTED THE WALL LEANING TOWARDS THE PUBLIC WALKWAY, RE$1K due
DOB04/29/2022ERECT A SIDEWALK SHED , ENTIRE LENGTH OF BUILDING APPROXIMATELY 80 LINEAR FEET AT EXPOSURE#1
DOB11/04/2021FAILURE TO MAINTAIN-MASONRY WALLS&WOOD ROOF SUSTAINED FIRE DAMAGE ON 11/01/21.MODERATE DAMAGES TO INTERIOR AT ALL STORES ON BAILY AVE WITH COLLAPSE CEILINGS AND OPEN ROOF.OWNER TO ENGAGE NYSPE AND CONTRACTOR TO REPAIR BUILDING UNDER PERMIT.FILE FOR PERMIT BY 12/01/2021.START WORK BY 01/01/2022
DOB11/02/2021DUE TO FIRE
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB08/17/2017VP-VIOLATION UNSERVED ECB-ACTIVE
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
ECB10/11/2009FAILURE TO MAINTAIN BUILDING WALLSON APPURTENANCES NOTED@FRONT AND SIDE FACADE THERE IS BRICK WORK MASONRY LOOSE CRACKED MORTAR MISSING INVARIOUS LOCATIONS.REMEDY:MAINTAIN EXTERIOR BUILDING WALLNothing owed — awaiting certificate of correction
ECB02/03/2009OIL FIRED FULTON HIGH PRESSURE BOILER REPLACES WITHOUT OBTAINING APPROVAL AND WORK PERMITS FORM NYC DEPT OF BUILDINGS. FUEL BURN AND BOILER PERMIT REQUIRED.Nothing owed — awaiting certificate of correction
ECB03/12/200432A,50B,50D,50A,50C. COLUMBIA 1981 NATL BD,102682.50A-PIPE DOWN SAFETYVALVE DISCHARGE TO A SAFE POINT.50B-SEAL THE FLUR TO THE CHIMNEY WITH A SAFE POINT.50C-EXPOSED WOOD IN CEILING MUST BE COVERED BY BOILERNothing owed — awaiting certificate of correction
ECB09/11/2000FAILURE TO MAITAIN THE STRUCTURAL CONDITION OF THE EXTERIOR BUILDING WALLS.DEFECTS NOTED:FRONT FACADE BRICK POPPING OUT,MORTAR JOINTS ARE SPALLING AND EREDED,STEEL BEARING PLATES EXPOSED AND CORRODED.SIDE EASTNothing owed — awaiting certificate of correction
One story retail building · Owner of record: N.E.W.S. REALTY ENTERPRISES CORP. · 8,475 sf lot · 0.88 FAR built · Flood zone X