← Back
BuildNYC
Elevator apt, fireproof with stores
3647 BROADWAY
MANHATTAN · BIN 1062449
💬 Discuss this project
1917Year Built
10Stories
D6Building Class
R8Zoning
123,314 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized33 Active Violations 4 likely answered 2 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: 3647 Realty Co · 15,000 sf lot · 8.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Savory Deli & Grocery5p · 3 filings · 19 docs
CellarSavory Deli & Grocery1 filing · 6 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction11p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3647 Realty1503/22/2026
Comprehensive Designs403/22/2026
'FC Foley Square Associates107/08/2026
Taco Bell103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NS Engineers209/10/2026
AP Professional Engineering204/07/2026
Thomas Barry Architect211/11/2021
Syed Engineering207/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sandeep Kaur103/21/2026
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Apex Group NYScaffold409/02/2026
Topline NYC ContractingScaffold303/21/2026
KJK ElectricElectrical203/22/2026
DI MartiniGeneral Contractor203/21/2026
Y.S. ElectricElectrical203/21/2026
Devorah ElectricElectrical103/21/2026
J. F. MarchElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
Apex Group NYGeneral Contractor107/08/2026
JascoScaffold107/08/2026
Shahon Electric CoElectrical103/21/2026
Norway ElectricElectrical103/21/2026
K & G Electric CoElectrical103/22/2026
KJK ElectricElectrical103/21/2026
Li ZhengElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS Engineers1442109/10/2026
AP Professional Engineering5974204/08/2026
Opera Studio Architecture5970211/11/2021
Building Lifecycle
All (119)Filed (9)Permit Issued (8)Signed Off (3)Facade (FISP) (12)Violation (60)Objection (8)Special Inspection (19)
10/06/2026
Violation issued (ECB, open)
Elevators
10/06/2026
Objection resolved — Resolved
10/06/2026
Objection resolved — Resolved
10/06/2026
Objection resolved — Resolved
10/06/2026
Objection resolved — Resolved
10/05/2026
Objection raised — Fire_Protection
10/02/2026
Objection raised — Fire_Protection
10/02/2026
Objection raised — Accessibility
10/02/2026
Objection raised — Cost
09/10/2026
Filed — Alteration
REPLACE PL FIXTURES W/ NEW @ EXISTING ROUGHING(1 H.S.,1 3-COMP. SINK)@ 1ST & (1 LAV,1 WC,1 H.W.H.)@ CELLAR. REPLACE GAS APPLIANCES W/ NEW (2 DEEP FRYERS,2 FLAT GRILLS,1 CHARCOAL,1 2-BURNER)@ 1ST. INSTALL NEW PL (1 H.S.)@ 1ST. CAP & REMOVE (1 MOP SINK)@ 1S
M01456226-S1
09/10/2026
Filed — Alteration
REPLACE PL FIXTURES W/ NEW @ EXISTING ROUGHING(1 H.S.,1 3-COMP. SINK)@ 1ST & (1 LAV,1 WC,1 H.W.H.)@ CELLAR. REPLACE GAS APPLIANCES W/ NEW (2 DEEP FRYERS,2 FLAT GRILLS,1 CHARCOAL,1 2-BURNER)@ 1ST. INSTALL NEW PL (1 H.S.)@ 1ST. CAP & REMOVE (1 MOP SINK)@ 1S
M01456226-I1
09/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/04/2026
Special inspection requirement — Interior lighting power
Shamsul Siddique
09/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Shamsul Siddique
09/04/2026
Special inspection requirement — Final
Shamsul Siddique
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shamsul Siddique
09/03/2026
Violation issued (HPD, open)
B
09/03/2026
Violation issued (HPD, open)
B
09/01/2026
Permit issued — Sidewalk Shed
M01361814-I1-SH
08/11/2026
Violation issued (HPD, open)
C
07/30/2026
Violation issued (ECB, open)
Elevators
07/17/2026
Violation issued (HPD, open)
A
06/26/2026
Violation issued (HPD, open)
C
06/26/2026
Violation issued (HPD, open)
C
06/03/2026
Permit issued — Sidewalk Shed
M01361814-I1-SH
05/27/2026
Violation issued (ECB, open)
Elevators
05/27/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, open)
B
05/27/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
B
05/12/2026
Violation issued (HPD, closed)
C
04/17/2026
Permit issued — Suspended Scaffold
M01382455-I1-SC
04/15/2026
Permit issued — General Construction
M01373029-I1-GC
04/11/2026
Violation issued (HPD, closed)
C
04/11/2026
Violation issued (HPD, closed)
C
04/11/2026
Violation issued (HPD, closed)
C
04/11/2026
Violation issued (HPD, closed)
C
04/08/2026
Filed — Alteration
INSTALLATION OF OUTRIGGER THE FACADE REPAIR WORK AS PER PLAN SUBMITTED.
M01382455-I1
04/07/2026
Filed — Alteration
M01373029-I1
04/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GURVINDER SINGH
04/02/2026
Special inspection requirement — Post-installed Anchors
GURVINDER SINGH
04/02/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
GURVINDER SINGH
04/01/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, open)
B
04/01/2026
Violation issued (HPD, closed)
A
03/26/2026
Violation issued (ECB, open)
Elevators
03/16/2026
Permit issued — Sidewalk Shed
M01361814-I1-SH
03/16/2026
Special inspection requirement — Masonry
GURVINDER SINGH
03/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
GURVINDER SINGH
03/05/2026
Violation issued (ECB, open)
Elevators
03/02/2026
Filed — Alteration
M01361814-I1
01/16/2026
Violation issued (HPD, closed)
B
01/16/2026
Violation issued (HPD, closed)
B
01/16/2026
Violation issued (HPD, closed)
B
11/06/2025
Violation issued (HPD, closed)
C
11/06/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
B
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedApex Group NY09/01/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY06/03/2026
DOB NOWSuspended ScaffoldPermit IssuedApex Group NY04/17/2026
DOB NOWGeneral ConstructionPermit IssuedApex Group NY04/15/2026
DOB NOWSidewalk ShedPermit IssuedApex Group NY03/16/2026
DOB NOWSupported ScaffoldSigned-offJasco07/08/2021
DOB NOWGeneral ConstructionSigned-offDI Martini06/02/2021
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting08/21/2020
BISOTISSUEDLucky General Construction07/10/2014
BISEQISSUEDTri-State Contracting of*05/21/2014
BISOTISSUEDLucky General Construction01/29/2014
BISEQISSUEDJ & G GNRL Contracting04/09/2012
BISFPISSUEDNY Fire02/16/2010
BISPLISSUEDPlumbing & Heating Doctor02/05/2010
BISPLISSUEDJodom Mechanical01/13/2010
BISOTISSUEDGracecon12/07/2009
BISFPISSUEDMega Fire Protection04/19/2004
BISEQISSUEDJ and G General01/24/2003
BISEQISSUEDJ and G General09/17/2002
BISFPISSUEDIdeal Fire Control02/18/2000
BISPLISSUEDC.R.U. Mechan & Heating12/15/1999
BISMHISSUEDOrient Construction Group12/10/1999
BISEQISSUEDOrient Construction Group12/10/1999
BISPLISSUEDEbm Plumbing11/17/1999
BISBLRE-ISSUEDBeta Mechanical, Inc./Better Ene11/17/1999
BISPLISSUEDRigid Plumbing Cont06/05/1996
BISOTISSUEDAuthorized Contracting Co05/29/1996
BISPLISSUEDLeslie Kimmel10/22/1992
BISBLISSUEDEmpire Industrial Combustion10/22/1992
BIS—ISSUEDAnf Co10/02/1992
BISPLISSUEDNYC PLG Heating and Water Meter Co07/23/1991
1 project · most recent 09/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/10/2026——Gas, Water/Sanitary
4 projects · most recent 03/03/2026
General Wiring
FiledStatusContractorScope
03/03/2026Permit IssuedHigh Quality Electric of NYC—
04/26/2021CompleteKJK ElectricGeneral Wiring
08/17/2020Permit IssuedRichard Neu—
01/29/2018Permit IssuedK & G Electric CoGeneral Wiring
1 project · most recent 04/08/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/08/2026Permit IssuedApex Group NYSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/08/2026Tenant Protection Plan Compliance—special
09/08/2026Tenant Protection Plan Compliance—special
09/04/2026Interior lighting powerShamsul Siddiqueenergy_progress
09/04/2026Energy Code Compliance InspectionsShamsul Siddiqueprogress
09/04/2026FinalShamsul Siddiqueprogress
09/04/2026Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
04/07/2026Structural Stability – Alterations of existing buildingsGURVINDER SINGHspecial
04/02/2026Post-installed AnchorsGURVINDER SINGHspecial
04/02/2026Alternative Materials - OTCR Buildings Bulletin NumberGURVINDER SINGHspecial
03/16/2026MasonryGURVINDER SINGHspecial
03/16/2026Tenant Protection Plan ComplianceGURVINDER SINGHspecial
11/11/2021Fire-Resistance Rated ConstructionThomas Barryprogress
11/11/2021Fire-Resistant Penetrations and JointsThomas Barryspecial
11/11/2021Energy Code Compliance InspectionsThomas Barryprogress
11/11/2021FinalThomas Barryprogress
11/11/2021Lighting controlsThomas Barryenergy_progress
11/11/2021MeteringThomas Barryenergy_progress
11/11/2021Interior lighting powerThomas Barryenergy_progress
06/26/2021FinalRAFI HAMIDprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Savory Deli & GroceryRestaurant / Food ServiceCellar, Floor 1
Project M01456226 Alteration · Plan Examiner Review · 09/10/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
09/15/2026M01456226-I1Request digital key ↗
09/15/2026M01456226-S1Request digital key ↗
09/06/2026M01382455-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00447439-I1Request digital key ↗
09/04/2026M00447439-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00385802-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
12/04/2020140984424Open ↗
03/02/2015121025951Open ↗
03/02/2015121025951Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
12/05/2020140984424Open ↗
07/19/2014140157504Open ↗
05/20/2014140200805Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
03/02/2015121025951Open ↗
02/26/2015121025951Open ↗
09/09/2014140157504Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/15/2026M01456226-I1Open ↗
09/15/2026M01456226-S1Open ↗
09/04/2026M00447439-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01382455-I1Open ↗
09/01/2026M01382455-I1Open ↗
08/27/2026M00447439-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/04/2020140984424Open ↗
05/20/2014140200805Open ↗
01/29/2014140157504Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/04/2020140984424Open ↗
05/20/2014140200805Open ↗
01/29/2014140157504Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/04/2020140984424Open ↗
05/20/2014140200805Open ↗
01/29/2014140157504Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026M00447439-P1Open ↗
08/27/2026M00447439-P1Open ↗
08/23/2026M00547774-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/12/2012121025951Open ↗
02/16/2010120263641Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/12/2012121025951Open ↗
02/16/2010120263641Open ↗
▸Trade Schedules & Equipment1
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
05/05/2010120263641Open ↗
▸Safety & Tenant Protection2
▸BISTPP1: TENANT PROTECTION PLAN1
05/03/2021140984424Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00385802-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/15/2026M01456226-I1Open ↗
09/15/2026M01456226-S1Open ↗
09/04/2026M00447439-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/16/2010120263641Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/29/2014140157504Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/04/2020140984424Open ↗
01/29/2014140157504Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/04/2020140984424Open ↗
01/29/2014140157504Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/09/2014140157504Open ↗
▸BISEN2 - As Built Energy Analysis1
09/09/2014140157504Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00447439-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/04/2020140984424Open ↗
05/20/2014140200805Open ↗
01/29/2014140157504Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/26/2015121025951Open ↗
05/05/2010120263641Open ↗
05/05/2010120263641Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/12/2012121025951Open ↗
02/16/2010120263641Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/04/2020140984424Open ↗
09/09/2014140157504Open ↗
01/29/2014140157504Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET3
12/04/2020140984424Open ↗
05/20/2014140200805Open ↗
01/29/2014140157504Open ↗
▸BISEFILING COVER SHEET2
04/12/2012121025951Open ↗
02/16/2010120263641Open ↗
▸BISADDITIONAL INFORMATION2
02/27/2015121025951Open ↗
04/22/2014121025951Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/05/2010120263641Open ↗
▸DOB NOWCalculations1
08/13/2026M01382455-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01382455-I1Open ↗