← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
365 ATLANTIC AVENUE
BROOKLYN · BIN 3000690
💬 Discuss this project
1899Year Built
4Stories
RMBuilding Class
R7AZoning
8,380 sfGross Floor Area
7Units
Rent Stabilized0 Open Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 365-367 ATLANTIC AVE LLC · 4,250 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof5p · 1 filing · 20 docs
Floor 410p · 1 filing · 20 docs
Floor 39p · 2 filings · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar8p · 1 filing · 20 docs
3 jobs · most recent 11/10/2025
General Wiring
FiledStatusContractorScope
11/10/2025CompleteBROOKYLN SOLARWORKS, LLC—
02/09/2022CompleteV. VASS ELECTRIC CORP—
09/16/2021CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
Building Lifecycle
All (91)Filed (11)Permit Issued (8)Signed Off (4)Violation (15)Inspection (3)Objection (20)Special Inspection (30)
05/01/2026
Violation issued (HPD, closed)
A
01/12/2026
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01208783-I1
06/24/2025
Permit issued — Solar
B01208783-I1-SL
06/17/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01208783-I1
06/06/2025
Violation issued (HPD, closed)
A
04/10/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/10/2025
Special inspection requirement — Final
NARESH MAHANGU
04/10/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
04/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/27/2024
Violation issued (HPD, closed)
I
04/08/2024
Violation issued (HPD, closed)
A
12/08/2023
Violation issued (ECB, closed)
Unknown
11/20/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, closed)
A
03/20/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/29/2022
Filed — Alteration CO
INSTALLATION OF NEW FIRE ESCAPE AT THE FRONT FACADE. REMOVAL OF EXISTING FIRE ESCAPE AT THE REAR FACADE. MINOR WORK TO EXISTING 1ST FLOOR RETAIL SPACE.
B00606023-P3
09/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LITCHFIELD
09/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT LITCHFIELD
09/29/2022
Special inspection requirement — Interior lighting power
ROBERT LITCHFIELD
09/29/2022
Special inspection requirement — Lighting controls
ROBERT LITCHFIELD
09/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT LITCHFIELD
09/29/2022
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LITCHFIELD
06/23/2022
Objection raised — Scope
06/23/2022
Objection resolved — Addressed
06/12/2022
Filed — Alteration CO
INSTALLATION OF NEW FIRE ESCAPE AT THE FRONT FACADE. REMOVAL OF EXISTING FIRE ESCAPE AT THE REAR FACADE. MINOR WORK TO EXISTING 1ST FLOOR RETAIL SPACE.
B00606023-P2
06/11/2022
Special inspection requirement — Lighting controls
ROBERT LITCHFIELD
06/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LITCHFIELD
06/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT LITCHFIELD
06/11/2022
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LITCHFIELD
06/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT LITCHFIELD
06/11/2022
Special inspection requirement — Interior lighting power
ROBERT LITCHFIELD
06/10/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/01/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/24/2022
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH BUILDING RENOVATION
B00332777-S1
05/24/2022
Signed off — Alteration
Installation of temporary sidewalk shed & supported scaffold as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00678489-I1
05/24/2022
Permit issued — General Construction
B00606023-I1-GC
05/24/2022
Special inspection requirement — Final
ROBERT LITCHFIELD
05/24/2022
Special inspection requirement — Mechanical Systems
ROBERT LITCHFIELD
05/24/2022
Special inspection requirement — Maintenance information
ROBERT LITCHFIELD
05/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT LITCHFIELD
05/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT LITCHFIELD
05/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT LITCHFIELD
05/20/2022
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH BUILDING RENOVATION
B00332777-P2
05/16/2022
Objection resolved — Addressed
05/13/2022
Objection raised — Other
05/13/2022
Objection resolved — Addressed
05/13/2022
Objection resolved — Addressed
05/12/2022
Objection raised — Scope
05/12/2022
Objection raised — Scope
05/03/2022
Filed — Alteration CO
INSTALLATION OF NEW FIRE ESCAPE AT THE FRONT FACADE. REMOVAL OF EXISTING FIRE ESCAPE AT THE REAR FACADE. MINOR WORK TO EXISTING 1ST FLOOR RETAIL SPACE.
B00606023-P1
05/03/2022
Special inspection requirement — Interior lighting power
05/03/2022
Special inspection requirement — Lighting controls
05/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LITCHFIELD
05/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT LITCHFIELD
05/03/2022
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LITCHFIELD
05/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT LITCHFIELD
03/29/2022
Special inspection requirement — Final
FADY HABEEL
03/28/2022
Filed — Alteration
Installation of temporary sidewalk shed & supported scaffold as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00678489-P1
03/18/2022
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH BUILDING RENOVATION
B00332777-I1
Latest 60 of 91 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEERING HOUSE607/08/2026
355 357 ATLANTIC AVE CORP103/22/2026
OWNER OF 365 ATLANTIC103/22/2026
365-367 ATLANTIC AVE403/21/2026
365-367 ATLANTIC AVENUE CONDOMINIUM103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THE VILNITS GROUP LLC803/21/2026
Rigid Structural Design, LLC203/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEERING HOUSE CONSTRUCTGeneral Contractor607/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor207/08/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244106/17/2025
ROBERT LITCHFIELD ARCHITE3492609/29/2022
GREEN SOLUTIONS ENGINEERI5478112/15/2021
THE VILNITS GROUP LLC1223112/02/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC06/24/2025
DOB NOWGeneral ConstructionPermit IssuedSTEERING HOUSE CONSTRUCT05/24/2022
DOB NOWGeneral ConstructionPermit IssuedSTEERING HOUSE CONSTRUCT03/09/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING02/28/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING02/28/2022
DOB NOWMechanical SystemsSigned-offSTEERING HOUSE CONSTRUCT06/04/2021
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR03/10/2021
DOB NOWMechanical SystemsSigned-offSTEERING HOUSE CONSTRUCT03/02/2021
BISOTISSUEDSTEERING HOUSE CONSTRUCT11/20/2020
BISEQISSUEDSANITATION REPAIRS10/07/1994
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/20/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/10/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/01/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/10/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
04/10/2025FinalNARESH MAHANGUprogress
04/10/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/10/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
04/10/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/29/2022Fire-Resistant Penetrations and JointsROBERT LITCHFIELDspecial
09/29/2022Structural Stability – Alterations of existing buildingsROBERT LITCHFIELDspecial
09/29/2022Interior lighting powerROBERT LITCHFIELDenergy_progress
09/29/2022Lighting controlsROBERT LITCHFIELDenergy_progress
09/29/2022Fire-Resistance Rated ConstructionROBERT LITCHFIELDprogress
09/29/2022Energy Code Compliance InspectionsROBERT LITCHFIELDprogress
06/11/2022Lighting controlsROBERT LITCHFIELDenergy_progress
06/11/2022Fire-Resistant Penetrations and JointsROBERT LITCHFIELDspecial
06/11/2022Structural Stability – Alterations of existing buildingsROBERT LITCHFIELDspecial
06/11/2022Energy Code Compliance InspectionsROBERT LITCHFIELDprogress
06/11/2022Fire-Resistance Rated ConstructionROBERT LITCHFIELDprogress
06/11/2022Interior lighting powerROBERT LITCHFIELDenergy_progress
05/24/2022FinalROBERT LITCHFIELDprogress
05/24/2022Mechanical SystemsROBERT LITCHFIELDspecial
05/24/2022Maintenance informationROBERT LITCHFIELDenergy_progress
05/24/2022HVAC-R and service water heating system controlsROBERT LITCHFIELDenergy_progress
05/24/2022HVAC-R and service water piping design and insulationROBERT LITCHFIELDenergy_progress
05/24/2022HVAC-R and service water heating equipmentROBERT LITCHFIELDenergy_progress
05/03/2022Interior lighting power—energy_progress
05/03/2022Lighting controls—energy_progress
Latest 25 of 37.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch9
08/31/2026B00332777-P1Request digital key ↗
08/31/2026B00332777-S1Request digital key ↗
08/31/2026B00332777-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/31/2026B00332777-P2Request digital key ↗
08/31/2026B00332777-P1Request digital key ↗
08/31/2026B00332777-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/31/2026B00332777-I1Request digital key ↗
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit8
08/13/2026B00606023-P1Open ↗
08/13/2026B00606023-P3Open ↗
08/13/2026B00332777-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
12/07/2022322110942Open ↗
12/23/2021322043249Open ↗
12/21/2021322043249Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
06/04/2021322043249Open ↗
11/20/2020322043249Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/09/2022322110942Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026B00332777-P1Open ↗
09/01/2026B00332777-P1Open ↗
09/01/2026B00606023-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00678489-P1Open ↗
08/31/2026B00678489-I1Open ↗
08/13/2026B00606023-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B00332777-P1Open ↗
09/01/2026B00606023-P2Open ↗
09/01/2026B00606023-P2Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026B00606023-I1Open ↗
08/13/2026B00606023-P1Open ↗
08/13/2026B00606023-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026B00332777-I1Open ↗
08/13/2026B00332777-S1Open ↗
08/13/2026B00606023-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/02/2020322043249Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01208783-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/24/2022322043249Open ↗
05/24/2022322043249Open ↗
01/26/2022322043249Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00606023-I1Open ↗
08/13/2026B00332777-S1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/24/2022322043249Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/24/2022322043249Open ↗
05/24/2022322043249Open ↗
05/24/2022322043249Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/20/2022322110942Open ↗
12/20/2022322110942Open ↗
12/20/2022322110942Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL1
06/17/2020322043249Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/25/2022322043249Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01208783-I1Open ↗
▸DOB NOWLandmark Approval1
08/13/2026B01208783-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/30/2020322043249Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/24/2022322043249Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
12/20/2022322110942Open ↗
01/27/2022322043249Open ↗
11/24/2021322043249Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
12/07/2022322110942Open ↗
03/30/2020322043249Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification4
08/13/2026B00606023-P3Open ↗
08/13/2026B00606023-I1Open ↗
08/13/2026B00606023-P1Open ↗
Showing 3 of 4 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/20/2022322110942Open ↗
▸BISPLOT DIAGRAM1
12/20/2022322110942Open ↗