DOB05/07/2025Cycle 9 failure to correct swarmp conditions
DOB02/22/2024Failed to file FISP cycle 9C technical report by 2/21/2024
HPD12/19/2018§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, WEST WALL IN THE FOYER LOCATED AT APT 10E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD12/19/2018§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 10E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD12/19/2018§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE BATHROOM LOCATED AT APT 10E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD12/19/2018§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 10E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD12/19/2018§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 10E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD08/23/2016§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD08/23/2016§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE AT ENTRANCE DOOR AT LOBBY, 1st STORY
HPD08/23/2016§ 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES LOCATED AT APT 6D, 6th STORY
HPD08/23/2016§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
ECB12/29/2025Failure to maintain building facade wall"s" and appurtenances. Note: at the time of inspection i observed at ex #1, north elevation, cracked/broken glass window at 7TH floor. Unsecured objects attached to windoNothing owed — awaiting certificate of correction
ECB09/08/2025Failure to maintain building in code-compliant manner. Exterior walls have become porous and pipe leaking in hallway well. Causing damage tointerior wall of class room and hallway. Remedy: repair and/or replaceNothing owed — awaiting certificate of correction
ECB09/08/2025Failure to maintain building in code-compliant manner. Observed spalling paint from meter damage at front entrance, class room 1, 3 and hallway inside upn center. Remedy: repair and/or replace.Nothing owed — awaiting certificate of correction
ECB09/04/2025Failure to maintain building exterior wall(s) or appurtenances. Note:-at the time of inspection observed at expo #1, 2 and 3 north, east andsouth elevation damaged/deteriorating mortar joint at several locationNothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB11/14/2025Violation issued-failure to file 2024 external low pressure inspectionAnswered on the city's records: a 2024 boiler inspection report was accepted (Feb 7, 2024)3 identical filings
DOB09/23/2024Violation issued-failure to file 2023 external low pressure inspectionAnswered on the city's records: a 2023 boiler inspection report was accepted (Jan 17, 2023)2 identical filings
DOB06/30/2023Violation issued-failure to file 2020 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB06/30/2023Violation issued-failure to file 2021 external low pressure inspectionAnswered on the city's records: a 2021 boiler inspection report was accepted (Oct 26, 2021)