← Back
Two family converted from one family
365 RARITAN AVENUE
STATEN ISLAND · Grasmere-Arrochar-South Beach-Dongan Hills · BIN 5049841
💬 Discuss this project
1935Year Built
1.5Stories
B3Building Class
R3-1Zoning
825 sfGross Floor Area
2Units
Two family converted from one family · 5,500 sf lot · 0.15 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Filed — no permit issued26p · 2 filings · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS205/11/2026
Building Lifecycle
All (50)Filed (2)Objection (27)Special Inspection (21)
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Open
08/03/2026
Objection resolved — Resolved
06/30/2026
Objection raised — Energy
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Objection resolved — Addressed
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
06/02/2026
Objection raised — Zoning
06/02/2026
Objection raised — Zoning
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Fire_Protection
06/02/2026
Objection raised — Admin
06/02/2026
Objection raised — Admin
06/02/2026
Objection raised — Fire_Protection
06/02/2026
Objection raised — Inspections
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Cost
06/02/2026
Objection raised — Structural
05/11/2026
Filed — Alteration
This application proposes the construction of a new two-story rear addition to an existing two-family resident building.
S01361925-I1
05/11/2026
Special inspection requirement — Interior lighting power
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
05/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/11/2026
Special inspection requirement — Air barrier - visual inspection
05/11/2026
Special inspection requirement — Fenestration areas
05/11/2026
Special inspection requirement — Insulation placement and R values
05/11/2026
Special inspection requirement — Air barrier continuity plan testing
05/11/2026
Special inspection requirement — Lighting controls
05/11/2026
Special inspection requirement — Exterior lighting power
05/11/2026
Special inspection requirement — Air barrier — testing
05/11/2026
Special inspection requirement — Lighting in dwelling units
05/11/2026
Special inspection requirement — Fenestration air leakage
05/11/2026
Special inspection requirement — Metering
04/03/2026
Objection raised — Other
03/24/2026
Filed — Full Demolition
Full Demolition of Existing Brick Garage & Attached Framed Shed at Rear Yard
S01360966-I1
02/19/2026
Special inspection requirement — Final
02/19/2026
Special inspection requirement — Footing and Foundation
02/19/2026
Special inspection requirement — Lowest Floor Elevation
02/17/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
02/17/2026
Special inspection requirement — Demolition
Nothing on file for this building.
1 project · most recent 05/11/2026
FiledStatusContractorScope
05/11/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026Fire-Resistance Rated Construction—progress
06/16/2026Energy Code Compliance Inspections—progress
05/11/2026Interior lighting power—energy_progress
05/11/2026Concrete - Cast-In-Place—special
05/11/2026Fenestration and door U-factor and product ratings—energy_progress
05/11/2026Air barrier - visual inspection—energy_progress
05/11/2026Fenestration areas—energy_progress
05/11/2026Insulation placement and R values—energy_progress
05/11/2026Air barrier continuity plan testing—energy_progress
05/11/2026Lighting controls—energy_progress
05/11/2026Exterior lighting power—energy_progress
05/11/2026Air barrier — testing —energy_progress
05/11/2026Lighting in dwelling units—energy_progress
05/11/2026Fenestration air leakage—energy_progress
05/11/2026Metering—energy_progress
02/19/2026Final—progress
02/19/2026Footing and Foundation—progress
02/19/2026Lowest Floor Elevation—progress
02/17/2026Structural Stability – Alterations of existing Buildings—special
02/17/2026Demolition—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026S01361925-I1Request digital key ↗
08/15/2026S01361925-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026S01361925-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01361925-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWElectric Cut-Off1
08/13/2026S01360966-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026S01361925-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026S01360966-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/15/2026S01361925-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026S01361925-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026S01361925-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026S01360966-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026S01361925-I1Open ↗