← Back
BuildNYC
Office with commercial, 7-19 stories
366 5TH AVENUE
MANHATTAN · BIN 1015878
💬 Discuss this project
1908Year Built
12Stories
O6Building Class
C5-3Zoning
147,595 sfGross Floor Area
73Units
LL97 Covered3 Active Violations 0 unresolved · 3 paperwork only 4 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: Ronbet 366 · 12,862 sf lot · 11.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsSprinkler work, 1st and 3rd to 10th floors1 filing
RoofRepair of exterior facade1p · 2 filings · 8 docs
Floor 10Jos Ioseph P. Day Realtycorporation2 filings · 13 docs
Floor 9Sprinkler system modifications2 filings · 13 docs
Floor 8
Floor 7Northwell Health, Joseph P. Day1p · 8 filings · 20 docs
Floor 6Joseph P. Day, The Mundi Westport Group6p · 9 filings · 20 docs
Floor 5General construction and demolitionUnder Construction1 filing · 6 docs
Floor 4Partial interior renovation of office space1 filing · 4 docs
Floor 3
Floor 2
Floor 1Luckin Coffee, Julietta Gelato & Cafe +2Under Construction8p · 13 filings · 20 docs
MezzanineLuckin CoffeeUnder Construction11p · 3 filings · 20 docs
CellarLuckin CoffeeUnder Construction4p · 2 filings · 20 docs
Sub-BasementDecommission existing rooftop antenna and equipment1 filing · 3 docs
Site & exteriorRepair of exterior facade2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Joseph P. Day Realty14003/21/2026
Mufson Partnership7403/21/2026
Ronbet 3662003/22/2026
164 East 87 Street303/21/2026
9 East 40th Street203/21/2026
Cross & Brown Co103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Qwa Studio610/14/2026
Advantage Architecture810/01/2026
The Eipel Engineering Group107/08/2026
Jack Green Associates1804/03/2026
Concord Associates203/25/2026
Eugene Khananov AIA101/23/2026
Intellect Design105/06/2025
Highland Associates407/18/2024
Urban Associates205/08/2024
Roger de Electric Co101/29/2024
LB&B Associates201/23/2024
Joon Architecture and Design101/23/2024
Grant102/25/2022
Patuxent Engineering103/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Walter T Gorman PE3303/21/2026
Lewsan Consulting403/21/2026
Eugene Khananov Architect103/21/2026
Urban Associates403/21/2026
Prospect Associates603/21/2026
Patuxent Engineering203/21/2026
Construction Permit Services103/21/2026
AM Expediting103/21/2026
Salamon Engineering203/21/2026
Walter T Gorman Pepc1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Creative Team Interiors IGeneral Contractor1309/15/2026
EL-Roc Contg of BrooklynFire Protection807/08/2026
Inner City Electrical ContractorsElectrical803/21/2026
Republic Scaffold & HoistScaffold603/21/2026
Paul M MaintenanceGeneral Contractor407/08/2026
Art + 1General Contractor407/08/2026
LJPYGeneral Contractor407/08/2026
Phase 3 InteriorsGeneral Contractor307/08/2026
EL-Roc Contracting of BKPlumbing307/08/2026
Absolute Special InsptnFire Protection207/08/2026
W.R. Plumbing and HeatingPlumbing210/04/2026
Built NYGGeneral Contractor209/03/2026
Transel Elev. & ElectricElectrical103/21/2026
Watch Hill Wireless SoluGeneral Contractor107/08/2026
Karalis JohnElectrical103/21/2026
B & A Restoration Contractingspecialty_contractor107/08/2026
A. Pilato PlumbingPlumbing107/08/2026
Dependable MechanicalFire Protection107/08/2026
Triboro Electrical Contracting CoElectrical103/21/2026
Jem Fire PreventionFire Protection110/14/2026
Peter Plumbing AssociatesFire Protection107/08/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
M.R.SGeneral Contractor107/08/2026
Millar Elevator IndustriesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Walter T. Gorman, P.E., P2681010/01/2026
Qwa Studio9293507/01/2026
Jack Green Associates4221704/03/2026
Steel Core Engineering PL1098303/25/2026
Urban Engineering2575105/08/2024
Salamon Engineering1264101/29/2024
LB Engineering3122301/23/2024
Grant Engineering Consulting3512102/25/2022
Building Lifecycle
All (240)Filed (49)Permit Issued (46)Signed Off (21)Facade (FISP) (10)Violation (60)Inspection (24)Special Inspection (30)
10/14/2026
Filed — Alteration
install construction wood fence for job site. NO CHANGE in EGRESS, USE OR OCCUPANCY.
M01473879-I1
10/13/2026
Permit issued — Sprinklers
M01395049-S1-EW-SP
10/01/2026
Filed — Alteration
Interior renovations to suite 610 as per plans. No change to use, egress or occupancy.
M01463740-I1
10/01/2026
Permit issued — Plumbing
M01395049-S1-PL
09/30/2026
Special inspection requirement — Interior lighting power
Walter Gorman
09/30/2026
Special inspection requirement — Lighting controls
Walter Gorman
09/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
09/22/2026
Special inspection requirement — Final
Daniel Terebelo
09/14/2026
Permit issued — General Construction
M01420805-I1-GC
09/04/2026
Permit issued — Plumbing
M01421682-S2-PL
09/02/2026
Permit issued — General Construction
M01395049-I1-GC-CX
08/31/2026
Permit issued — General Construction
M01421682-I1-GC
07/28/2026
Filed — Alteration
Demolition and general construction in partial 5th floor as per plans. No change to use, egress or occupancy.
M01420805-I1
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
07/27/2026
Special inspection requirement — Final
Daniel Terebelo
07/08/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WALLS AND FIXTURES PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01421682-S3
07/01/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WALLS AND FIXTURES PER PLAN. ALTERATION ON EXISTING HVAC. NO CHANGE in EGRESS, USE OR OCCUPANCY.
M01395049-S1
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kun Wu
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kun Wu
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kun Wu
06/30/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WALLS AND FIXTURES PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01421682-I1
06/30/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WALLS AND FIXTURES PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01421682-S1
06/30/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WALLS AND FIXTURES PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01421682-S2
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kun Wu
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kun Wu
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kun Wu
06/29/2026
Special inspection requirement — Final
Kun Wu
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
06/29/2026
Special inspection requirement — Mechanical Systems
Kun Wu
06/23/2026
Special inspection requirement — Interior lighting power
Walter Gorman
06/16/2026
Signed off — Alteration
modification to an existing Sprinkler system to match new space tenants fit out
M01342136-S1
05/26/2026
Signed off — Alteration
modification to an existing Sprinkler system to match new space tenants fit out
M01342136-I1
05/11/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WALLS AND FIXTURES PER PLAN. ALTERATION ON EXISTING HVAC. NO CHANGE in EGRESS, USE OR OCCUPANCY.
M01395049-I1
04/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kun Wu
04/30/2026
Special inspection requirement — Lighting controls
Kun Wu
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
04/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kun Wu
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
04/30/2026
Special inspection requirement — Sprinkler Systems
Kun Wu
04/30/2026
Special inspection requirement — Lighting in dwelling units
Kun Wu
04/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kun Wu
04/29/2026
Special inspection requirement — Mechanical Systems
Kun Wu
04/29/2026
Special inspection requirement — Final
Kun Wu
04/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/09/2026
Signed off — Alteration
M01063271-I1
04/08/2026
Permit issued — Mechanical Systems
M01342136-S1-MS
04/08/2026
Permit issued — General Construction
M01342136-I1-GC
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
04/03/2026
Filed — Alteration
Mechanical work on ground floor as per plans. No change to use, egress or occupancy.
M00896878-P1
04/03/2026
Permit issued — Sprinklers
M01342136-S2-EW-SP
03/27/2026
Filed — Alteration
M00678996-I1
03/27/2026
Filed — Alteration
Modifications to sprinkler system as per plans. No change to use, egress or occupancy.
M00679012-I1
03/25/2026
Filed — Alteration
modification to an existing Sprinkler system to match new space tenants fit out
M01342136-S2
03/04/2026
Filed — Alteration
modification to an existing Sprinkler system to match new space tenants fit out
M01342136-S1
03/04/2026
Permit issued — General Construction
M01342136-I1-GC
01/30/2026
Signed off — Alteration
Installation of new plumbing fixtures on 6th floor as per plans. No change to use, egress or occupancy.
M01063281-I1
Latest 60 of 240 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedJem Fire Prevention10/13/2026
DOB NOWPlumbingPermit IssuedW.R. Plumbing and Heating10/01/2026
DOB NOWGeneral ConstructionPermit IssuedCreative Team Interiors I09/14/2026
DOB NOWPlumbingPermit IssuedW.R. Plumbing and Heating09/04/2026
DOB NOWGeneral ConstructionPermit IssuedBuilt NYG09/02/2026
DOB NOWGeneral ConstructionPermit IssuedBuilt NYG08/31/2026
DOB NOWMechanical SystemsSigned-offCreative Team Interiors I04/08/2026
DOB NOWGeneral ConstructionSigned-offCreative Team Interiors I04/08/2026
DOB NOWSprinklersSigned-offEL-Roc Contg of Brooklyn04/03/2026
DOB NOWGeneral ConstructionSigned-offCreative Team Interiors I03/04/2026
DOB NOWSprinklersSigned-offAbsolute Special Insptn08/18/2025
DOB NOWGeneral ConstructionSigned-offArt + 107/01/2025
DOB NOWSprinklersSigned-offEL-Roc Contg of Brooklyn06/18/2025
DOB NOWGeneral ConstructionSigned-offArt + 105/23/2025
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating08/19/2024
DOB NOWSprinklersPermit IssuedDependable Mechanical08/19/2024
DOB NOWMechanical SystemsPermit IssuedPhase 3 Interiors08/15/2024
DOB NOWGeneral ConstructionSigned-offPhase 3 Interiors07/24/2024
DOB NOWGeneral ConstructionPermit IssuedCreative Team Interiors I06/21/2024
DOB NOWGeneral ConstructionSigned-offM.R.S06/06/2024
DOB NOWMechanical SystemsPermit IssuedCreative Team Interiors I06/06/2024
DOB NOWGeneral ConstructionSigned-offCreative Team Interiors I05/31/2024
DOB NOWPlumbingSigned-offEL-Roc Contracting of BK05/31/2024
DOB NOWPlumbingSigned-offEL-Roc Contracting of BK05/22/2024
DOB NOWSprinklersSigned-offEL-Roc Contg of Brooklyn05/22/2024
DOB NOWSprinklersSigned-offPeter Plumbing Associates03/26/2024
DOB NOWMechanical SystemsSigned-offPaul M Maintenance03/14/2024
DOB NOWGeneral ConstructionPermit IssuedB & A Restoration Contracting02/02/2024
DOB NOWGeneral ConstructionSigned-offLJPY01/29/2024
DOB NOWMechanical SystemsSigned-offLJPY01/26/2024
DOB NOWMechanical SystemsPermit IssuedCreative Team Interiors I12/01/2023
DOB NOWSprinklersSigned-offEL-Roc Contg of Brooklyn11/17/2023
DOB NOWSprinklersSigned-offAbsolute Special Insptn11/15/2023
DOB NOWPlumbingSigned-offEL-Roc Contracting of BK11/03/2023
DOB NOWPlumbingSigned-offA. Pilato Plumbing10/30/2023
DOB NOWGeneral ConstructionSigned-offCreative Team Interiors I09/29/2023
DOB NOWMechanical SystemsSigned-offPaul M Maintenance08/09/2023
DOB NOWGeneral ConstructionSigned-offPaul M Maintenance08/07/2023
DOB NOWSprinklersSigned-offEL-Roc Contg of Brooklyn09/20/2022
DOB NOWAntennaSigned-offWatch Hill Wireless Solu04/01/2022
+ 56 more permits on file
5 projects · most recent 07/08/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026Permit IssuedBuilt NYGAir Conditioning Systems, Heating Systems
Cooling
Sigma ×1
Heating
Tpi ×1
07/01/2026Permit IssuedBuilt NYGAir Conditioning Systems, Heating Systems
Cooling
Sigma ×1
Heating
Warren ×1
04/03/2026Permit IssuedCreative Team Interiors IAir Conditioning Systems
Cooling
Skypeak ACSV-C.2-120-2-C-2-DS-V-A-S-S-L-W-B-0-0-0-0 4,000 CFM ×2
Water Furnace UBH060SL301DBWAN2B32SSK 2,000 CFM · Wshp ×2
07/18/2024Permit IssuedPhase 3 InteriorsAir Conditioning Systems
Cooling
Florida Heat Pump EC240-3VTC 8,000 CFM · Condensing Unit ×1
07/14/2021——Air Conditioning Systems
Cooling
Johnson Controls CSV240 238,000 BTU · Rooftop Unit ×1
CSV240B 230,000 BTU · Chiller ×1
6 projects · most recent 07/01/2026
Sprinkler System
FiledStatusContractorScope
07/01/2026Permit IssuedJem Fire PreventionSprinkler System
03/27/2026———
03/25/2026Signed-offEL-Roc Contg of Brooklyn—
07/18/2024Permit IssuedA&H Express Plumbing & Heating—
05/19/2023——23 heads
09/22/2020Signed-offEL-Roc Contg of Brooklyn909 heads
4 projects · most recent 07/08/2026
Water/Sanitary
FiledStatusContractorScope
07/08/2026Permit IssuedW.R. Plumbing and HeatingWater/Sanitary
07/01/2026Permit IssuedEflow Plumbing & WatermainWater/Sanitary
05/17/2024Signed-offEL-Roc Contracting of BKWater/Sanitary
05/19/2023——Water/Sanitary
10 projects · most recent 01/29/2026
General Wiring
FiledStatusContractorScope
01/29/2026Permit IssuedInner City Electrical Contractors1 meters, 1 new_meters
01/29/2026Permit IssuedInner City Electrical ContractorsGeneral Wiring
11/07/2024Permit IssuedInner City Electrical Contractors1 meters, 1 new_meters
09/03/2024Permit IssuedInner City Electrical ContractorsGeneral Wiring
08/14/2024Permit IssuedAttractive Lighting ElectricalGeneral Wiring
07/17/2024Permit IssuedInner City Electrical ContractorsGeneral Wiring
05/24/2024Permit IssuedInner City Electrical Contractors—
07/14/2022Permit IssuedMLS ElectricGeneral Wiring
07/30/2020Permit IssuedInner City Electrical Contractors5 meters, 5 new_meters
03/11/2019CompleteNash Electric Services—
1 project · most recent 07/08/2026
Steel
FiledStatusContractorScope
07/08/2026Permit IssuedW.R. Plumbing and HeatingSteel
1 project · most recent 10/14/2026
Fence
FiledStatusContractorScope
10/14/2026——Fence
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
04/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
09/30/2026Interior lighting powerWalter Gormanenergy_progress
09/30/2026Lighting controlsWalter Gormanenergy_progress
09/28/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
09/22/2026FinalDaniel Terebeloprogress
07/27/2026FinalDaniel Terebeloprogress
07/27/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
07/01/2026HVAC-R and service water heating system controlsKun Wuenergy_progress
07/01/2026HVAC-R and service water piping design and insulationKun Wuenergy_progress
07/01/2026HVAC-R and service water heating equipmentKun Wuenergy_progress
06/30/2026HVAC-R and service water piping design and insulationKun Wuenergy_progress
06/30/2026HVAC-R and service water heating equipmentKun Wuenergy_progress
06/30/2026HVAC-R and service water heating system controlsKun Wuenergy_progress
06/29/2026FinalKun Wuprogress
06/29/2026Mechanical SystemsKun Wuspecial
06/29/2026Fire-Resistant Penetrations and JointsKun Wuspecial
06/23/2026Interior lighting powerWalter Gormanenergy_progress
04/30/2026HVAC-R and service water heating system controlsKun Wuenergy_progress
04/30/2026Sprinkler SystemsKun Wuspecial
04/30/2026Fire-Resistant Penetrations and JointsKun Wuspecial
04/30/2026Energy Code Compliance InspectionsKun Wuprogress
04/30/2026HVAC-R and service water heating equipmentKun Wuenergy_progress
04/30/2026Lighting in dwelling unitsKun Wuenergy_progress
04/30/2026HVAC-R and service water piping design and insulationKun Wuenergy_progress
04/30/2026Fire-Resistant Penetrations and JointsKun Wuspecial
04/30/2026Energy Code Compliance InspectionsKun Wuprogress
Latest 25 of 96.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Luckin CoffeeRestaurant / Food ServiceCellar, Floor 1, Mezzanine
Project M01421682 Alteration · Permit Entire · 06/30/2026
Project M01395049 Alteration · Permit Entire · 05/11/2026
The Mundi Westport GroupOfficeFloor 6
Project M01063271 Alteration · LOC Issued · 07/18/2024
Project M01063278 Alteration · Permit Entire · 07/18/2024
Project M01063281 Alteration · LOC Issued · 07/18/2024
Project M01063283 Alteration · Permit Entire · 07/18/2024
Joseph P. DayOfficeFloors 6, 7
Project M01017137 Alteration · Permit Entire · 05/17/2024
Project M01017144 Alteration · LOC Issued · 05/17/2024
Project M01017147 Alteration · Permit Entire · 05/17/2024
Project M01016562 Alteration · LOC Issued · 05/15/2024
Project M00830737 Alteration · Approved · 05/19/2023
Project M00830743 Alteration · Approved · 05/19/2023
Project M00830750 Alteration · Approved · 05/19/2023
Julietta Gelato & CafeRestaurant / Food ServiceFloor 1
Project M01046777 Alteration · LOC Issued · 05/08/2024
Nature RepublicRetailFloor 1
Project M00979726 Alteration · LOC Issued · 01/23/2024
Project M00979768 Alteration · LOC Issued · 01/23/2024
Project M00988839 Alteration · LOC Issued · 01/23/2024
JP DAYRetailFloor 1
Project M00896878 Alteration · Permit Entire · 09/13/2023
Project M00896882 Alteration · LOC Issued · 09/13/2023
Project M00896887 Alteration · LOC Issued · 09/13/2023
Northwell HealthMedical / HealthcareFloor 7
Project M00866204 Alteration · LOC Issued · 06/01/2023
Project M00866244 Alteration · LOC Issued · 06/01/2023
Project M00866271 Alteration · LOC Issued · 06/01/2023
Project M00866275 Alteration · LOC Issued · 06/01/2023
Jos Ioseph P. Day RealtycorporationOfficeFloor 10
Project M00540178 Alteration · Approved · 07/14/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,184 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch47
10/20/2026M01473879-I1Request digital key ↗
10/15/2026M01473879-I1Request digital key ↗
10/04/2026M01463740-I1Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00292488-I1Request digital key ↗
09/05/2026M00292488-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00140160-I1Request digital key ↗
▸Applications & Permits220
▸BISWORK PERMIT APPLICATION110
01/13/2022123704526Open ↗
12/16/2021123704526Open ↗
01/11/2021123704526Open ↗
Showing 3 of 110 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION103
06/13/2024121566493Open ↗
08/04/2020140928995Open ↗
07/24/2020110253092Open ↗
Showing 3 of 103 on file for this type
▸BISPLACE OF ASSEMBLY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISRequest for Certificate of Occupancy with Open Application(s) Cover Letter1
06/11/2018123433392Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications361
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION133
03/15/2019123704526Open ↗
01/14/2019123527978Open ↗
01/14/2019123527978Open ↗
Showing 3 of 133 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
10/15/2026M01473879-I1Open ↗
10/04/2026M01463740-I1Open ↗
09/05/2026M00140160-I1Open ↗
Showing 3 of 49 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST46
03/15/2019123704526Open ↗
01/14/2019123527978Open ↗
05/21/2018123433392Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
10/11/2026M01463740-I1Open ↗
10/11/2026M01463740-I1Open ↗
09/23/2026M00896878-I1Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
10/11/2026M01463740-I1Open ↗
09/23/2026M00896878-I1Open ↗
09/22/2026M01395049-I1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT27
08/04/2020140928995Open ↗
03/15/2019123704526Open ↗
01/14/2019123527978Open ↗
Showing 3 of 27 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/04/2020140928995Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/04/2020140928995Open ↗
Showing 1 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment77
▸BISSELF-CERT PLUMBING NOTICE31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
01/14/2019123527978Open ↗
01/04/2018123181859Open ↗
01/02/2018123181859Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT6
06/11/2018123433392Open ↗
Showing 1 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS4
06/11/2018123433392Open ↗
Showing 1 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
02/27/2020121922964Open ↗
06/04/2018122870107Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection4
▸BISST-1: Street Tree Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos111
▸DOB NOWDEP ACP-5: Asbestos Assessment Report41
10/04/2026M01463740-I1Open ↗
09/05/2026M00292488-I1Open ↗
09/05/2026M00292488-P1Open ↗
Showing 3 of 41 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)40
03/15/2019123704526Open ↗
05/21/2018123433392Open ↗
09/22/2017123181859Open ↗
Showing 3 of 40 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00540178-I1Open ↗
08/27/2026M01017144-I1Open ↗
08/13/2026M01016562-I1Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance71
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS38
03/15/2019123704526Open ↗
06/22/2018123433392Open ↗
06/11/2018123433392Open ↗
Showing 3 of 38 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
06/22/2018123433392Open ↗
06/11/2018123433392Open ↗
02/23/2018140236402Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/22/2020140928995Open ↗
10/09/2020140928995Open ↗
08/04/2020140928995Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/04/2020140928995Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/09/2020140928995Open ↗
08/04/2020140928995Open ↗
Showing 2 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs70
▸BISADMINISTRATIVE OBJECTIONS30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
05/09/2023121574992Open ↗
06/22/2018123433392Open ↗
06/11/2018123433392Open ↗
Showing 3 of 27 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
11/27/2020140928995Open ↗
10/24/2020140928995Open ↗
10/09/2020140928995Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership102
▸BISCOST AFFIDAVIT99
05/05/2023121574992Open ↗
08/04/2020140928995Open ↗
03/15/2019123704526Open ↗
Showing 3 of 99 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms108
▸BISEFILING COVER SHEET69
03/15/2019123704526Open ↗
01/14/2019123527978Open ↗
05/21/2018123433392Open ↗
Showing 3 of 69 on file for this type
▸BISADDITIONAL INFORMATION20
01/04/2018123181859Open ↗
06/14/2017123036473Open ↗
06/08/2017123036473Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM13
01/13/2022123704526Open ↗
12/16/2021123704526Open ↗
01/11/2021123704526Open ↗
Showing 3 of 13 on file for this type
▸BISeFiling Job Application Cover Sheet6
08/04/2020140928995Open ↗
Showing 1 of 6 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type