← Back
Telephone utility
366 EAST 150 STREET
BRONX · Melrose · BIN 2000856
💬 Discuss this project
0Year Built
—Stories
U4Building Class
C4-4Zoning
0 sfGross Floor Area
0Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Telephone utility · Owner of record: NEW YORK TELEPHONE CO · 12,807 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Roof7p · 4 filings · 19 docs
Floor 71p · 2 filings · 5 docs
Floor 62p · 3 filings · 19 docs
Floor 51p · 2 filings · 5 docs
Floor 43p · 5 filings · 20 docs
Floor 34p · 4 filings · 16 docs
Floor 25p · 4 filings · 20 docs
Floor 11p · 1 filing · 5 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON2409/30/2026
NEW YORK CITY PRIME209/13/2026
SUMMIT INTERIORS INC DBA SUMMIT C504/09/2026
VERIZON COMMUNICATIONS LLC903/22/2026
PLATFORM SOLUTIONS INC.503/22/2026
VANTAGETOP303/22/2026
NEW YORK TELEPHONE CO703/22/2026
VERIZON PROPERTY TAX DEPT103/22/2026
JL NEW YORK TELEPHONE CO.103/22/2026
N.Y. TELEPHONE COMPANY/ V103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN INTERIORS CORPGeneral Contractor1207/08/2026
VANTAGETOP LLCGeneral Contractor1107/08/2026
ON-TRAC CONSTRUCTION ASSOGeneral Contractor903/21/2026
SAFWAY ATLANTIC, LLCGeneral Contractor404/08/2026
ASHLAR MECHANICAL CORPFire Protection307/08/2026
PLATFORM SOLUTIONS, INCGeneral Contractor303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor204/09/2026
RAMDATH, JAIDATHElectrical203/21/2026
SPENELLI, RICHARDElectrical203/21/2026
NEW YORK CITY PRIME CORPGeneral Contractor108/30/2026
ANTHONY MATRONEElectrical103/21/2026
MATRONE ANTHONYElectrical103/21/2026
FLORES, HECTORElectrical103/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor107/08/2026
BRIAN MONTGOMERYElectrical103/21/2026
BLASKOVIC, ALDOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5441204/30/2026
MERRITT ENGINEERING CONSU460103/02/2022
Building Lifecycle
All (191)Filed (27)Permit Issued (34)Signed Off (14)Facade (FISP) (16)Violation (60)Inspection (10)Special Inspection (30)
09/29/2026
Permit issued — Suspended Scaffold
X01463954-I1-SC
09/11/2026
Signed off — Alteration
REPURPOSING OF EXISTING FUEL OIL PIPING. EXTEND NEW PIPING FROM FUEL OIL TANK NO. 1 TO EXISTING PIPING WITH ASSOCIATED VALVES.
X00948795-I1
08/28/2026
Permit issued — Sidewalk Shed
X01448909-I1-SH
08/27/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01448909-I1
06/17/2026
Signed off — Alteration
Modification of existing sprinkler system to remove, replace, and relocate sprinkler heads and associated piping as shown on the drawings filed herewith, No change in use, egress, or occupancy.
X00802753-I1
05/29/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01370891-I1
05/29/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01370893-I1
05/22/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/30/2026
Filed — Alteration
Modification of existing sprinkler system to remove, replace, and relocate sprinkler heads and associated piping as shown on the drawings filed herewith, No change in use, egress, or occupancy.
X00802753-P3
04/30/2026
Signed off — Alteration
Removal of Fuel Oil Tank No. 2 associated with the existing generator. Removal of all associated piping, cap at wall in fuel oil room.
X00944356-I1
04/20/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2026
Permit issued — Sidewalk Shed
X01370891-I1-SH
03/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01370891-I1
03/13/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01370893-I1
03/13/2026
Permit issued — Supported Scaffold
X01370893-I1-SF
02/13/2026
Violation issued (FDNY_NOV, closed)
01/20/2026
Signed off — Alteration
General Construction in conjunction with the installation of new AC Units for new telco equipment with associated piping. No change to use, egress, or occupancy.
X01020342-I1
01/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2025
Violation issued (FDNY_NOV, closed)
11/19/2025
Violation issued (FDNY_NOV, closed)
11/19/2025
Violation issued (FDNY_NOV, closed)
10/28/2025
Filed — Alteration
Modification of existing sprinkler system to remove, replace, and relocate sprinkler heads and associated piping as shown on the drawings filed herewith, No change in use, egress, or occupancy.
X00802753-P2
10/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/13/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
10/10/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/06/2025
Violation issued (FDNY_NOV, closed)
10/06/2025
Violation issued (FDNY_ORDER, closed)
09/30/2025
Permit issued — Sprinklers
X00802753-I1-EW-SP
09/11/2025
Signed off — Alteration
Modification of mechanical system to include new HVAC equipment and associated ducts and piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
X00802674-I1
07/01/2025
Permit issued — Boiler Equipment
X00944356-I1-BE
06/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2025
Signed off — Alteration
Removal of chiller plant and associated piping in cellar thru roof. Installation of new HVAC on 2nd, 3rd, and 5th floors and two new adiabatic coolers on roof with associated ducts and piping. No change in use, egress, or occupancy.
X00805898-I1
05/20/2025
Permit issued — Boiler Equipment
X00948795-I1-BE
05/15/2025
Violation issued (FDNY_ORDER, closed)
05/15/2025
Violation issued (FDNY_NOV, closed)
04/17/2025
Signed off — Alteration
Installation of new AC Units for new telco equipment with associated piping. No change to use, egress, or occupancy.
X01020351-I1
03/24/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
03/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
03/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
03/24/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
03/24/2025
Special inspection requirement — Final
EUGENE BIFULCO
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/18/2025
Filed — Alteration
Installation of new AC Units for new telco equipment with associated piping. No change to use, egress, or occupancy.
X01020351-P1
02/28/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
02/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
02/28/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
02/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
02/28/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
02/28/2025
Special inspection requirement — Final
EUGENE BIFULCO
01/17/2025
Violation issued (FDNY_ORDER, closed)
01/17/2025
Violation issued (FDNY_NOV, closed)
12/06/2024
Permit issued — Boiler Equipment
X00948795-I1-BE
12/03/2024
Signed off — Alteration
Filing for the replacement of the 7th floor roof.
X01080815-I1
11/14/2024
Permit issued — Mechanical Systems
X00802674-I1-MS
09/30/2024
Violation issued (FDNY_NOV, closed)
09/06/2024
Filed — Alteration
REPURPOSING OF EXISTING FUEL OIL PIPING. EXTEND NEW PIPING FROM FUEL OIL TANK NO. 1 TO EXISTING PIPING WITH ASSOCIATED VALVES.
X00948795-P1
09/06/2024
Filed — Alteration
Removal of Fuel Oil Tank No. 2 associated with the existing generator. Removal of all associated piping, cap at wall in fuel oil room.
X00944356-P1
09/03/2024
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAVENUE CONTRACTING INC09/29/2026
DOB NOWSidewalk ShedPermit IssuedNEW YORK CITY PRIME CORP08/28/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/17/2026
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC03/13/2026
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP09/30/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP07/01/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP05/20/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP12/06/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP11/14/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP08/20/2024
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP08/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC04/12/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP03/28/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP03/26/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP12/18/2023
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP12/18/2023
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC12/14/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP11/15/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP11/15/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/27/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC05/15/2023
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP05/10/2023
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP04/14/2023
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP04/14/2023
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP04/14/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/18/2022
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO07/15/2022
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO06/07/2022
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO03/14/2022
DOB NOWSidewalk ShedPermit IssuedVANTAGETOP LLC06/07/2019
DOB NOWSupported ScaffoldPermit IssuedVANTAGETOP LLC11/29/2018
DOB NOWSidewalk ShedPermit IssuedVANTAGETOP LLC11/13/2018
DOB NOWSidewalk ShedPermit IssuedVANTAGETOP LLC06/14/2018
DOB NOWSidewalk ShedPermit IssuedVANTAGETOP LLC02/26/2018
BISOTISSUEDTISHMAN CONSTRUCTION CORP09/25/2020
BISMHISSUEDTISHMAN CONSTRUCTION CORP09/25/2020
BISOTISSUEDTISHMAN CONSTRUCTION CORP09/25/2020
BISOTISSUEDTISHMAN INTERIORS CORP05/20/2020
BISSPISSUEDASHLAR MECHANICAL CORP03/09/2020
BISMHISSUEDTISHMAN CONSTRUCTION CORP11/25/2019
+ 35 more permits on file
1 project · most recent 04/30/2026
FiledStatusContractorScope
04/30/2026Signed-offASHLAR MECHANICAL CORP38 heads
1 project · most recent 04/30/2026
FiledStatusContractorScope
04/30/2026———
8 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
04/20/2026Pending Payment VerificationJAMES F. VOLPE ELEC'LGeneral Wiring
03/11/2026CompleteBOROWIDE ELECT'L CONTR'S—
03/11/2026Permit IssuedJAMES F. VOLPE ELEC'LGeneral Wiring
01/29/2024CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
07/13/2022CompleteTOP SHELF ELECTRIC CORP—
06/23/2020CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
02/07/2018CompletePATRIOT ELECTRIC CORP—
4 projects · most recent 08/27/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/27/2026Permit IssuedNEW YORK CITY PRIME CORPSidewalk Shed
03/16/2026Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
03/13/2026Signed-offANDAMIO SCAFFOLDING LLCScaffold
12/13/2023Permit IssuedSAFWAY ATLANTIC, LLCScaffold
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/22/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2026Pass-Final Boiler Equipment InspectionPassView ↗
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/10/2025Pass-Final PL - UndergroundPassView ↗
06/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2024Fail-Final SP - Up to 3 Requested FloorsFailView ↗
03/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
10/13/2025Sprinkler SystemsEUGENE BIFULCOspecial
03/24/2025Maintenance informationEUGENE BIFULCOenergy_progress
03/24/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
03/24/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
03/24/2025Mechanical SystemsEUGENE BIFULCOspecial
03/24/2025FinalEUGENE BIFULCOprogress
03/24/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
02/28/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
02/28/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
02/28/2025Maintenance informationEUGENE BIFULCOenergy_progress
02/28/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
02/28/2025Mechanical SystemsEUGENE BIFULCOspecial
02/28/2025FinalEUGENE BIFULCOprogress
08/15/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsEUGENE BIFULCOspecial
07/15/2024FinalEUGENE BIFULCOprogress
07/15/2024Insulation placement and R valuesEUGENE BIFULCOenergy_progress
04/30/2024Sprinkler SystemsEUGENE BIFULCOspecial
02/13/2024HVAC-R and service water heating equipment—energy_progress
02/13/2024Duct leakage testing, insulation and design—energy_progress
02/13/2024HVAC-R and service water heating system controls—energy_progress
02/13/2024Energy Code Compliance Inspections—progress
02/13/2024Maintenance information—energy_progress
12/19/2023Mechanical Systems—special
12/19/2023Final—progress
12/19/2023Fire-Resistant Penetrations and Joints—special
Latest 25 of 36.
▾Documents — 325 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
09/13/2026X01448909-I1Request digital key ↗
08/26/2026X00017753-I1Request digital key ↗
08/26/2026X00095708-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION24
08/26/2020220636989Open ↗
04/09/2020240271530Open ↗
03/02/2018220637853Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION19
05/20/2020240271530Open ↗
03/10/2020220637121Open ↗
11/26/2019220636989Open ↗
Showing 3 of 19 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/29/2016220426411Open ↗
▸Seals & Professional Certifications83
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
04/29/2020220637121Open ↗
04/29/2020220637121Open ↗
04/21/2020240271530Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/10/2026X01448909-I1Open ↗
08/26/2026X00095708-I1Open ↗
08/24/2026X00687344-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026X01080815-I1Open ↗
09/27/2026X01080815-I1Open ↗
09/01/2026X00805898-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X00805898-I1Open ↗
09/01/2026X00687344-I1Open ↗
08/31/2026X00948795-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
04/09/2020240271530Open ↗
01/22/2018220401241Open ↗
11/02/2017220623859Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/22/2018220401241Open ↗
11/02/2017220623859Open ↗
06/17/2015220405728Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/09/2020240271530Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/09/2020240271530Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
07/17/2020220637871Open ↗
05/18/2020220637862Open ↗
05/18/2020220637853Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/01/2018220637121Open ↗
03/01/2018220636989Open ↗
▸BISEQUIPMENT USE PERMITS1
03/06/2020220623859Open ↗
▸BISSCHEDULE B - PLUMBING1
08/26/2020220636989Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/06/2020220623859Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/22/2018220401241Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/26/2026X00095708-I1Open ↗
08/24/2026X00687344-I1Open ↗
08/21/2026X00979637-S1Open ↗
Showing 3 of 12 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM6
07/17/2020220637871Open ↗
05/19/2020220637880Open ↗
05/19/2020220637862Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/23/2026X00802674-I1Open ↗
08/13/2026X00805904-I1Open ↗
08/13/2026X00802753-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/09/2020240271530Open ↗
11/02/2017220623859Open ↗
06/17/2015220405728Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/22/2018220637121Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/06/2020220623859Open ↗
10/09/2018220636989Open ↗
09/06/2018220636989Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
08/24/2020220636989Open ↗
06/01/2020240271530Open ↗
05/29/2020240271530Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/24/2020220636989Open ↗
05/20/2020240271530Open ↗
04/09/2020240271530Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/09/2020240271530Open ↗
▸BISNYCECC ANALYSIS1
04/09/2020240271530Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
10/02/2020220636989Open ↗
10/02/2020220636989Open ↗
06/01/2020240271530Open ↗
Showing 3 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
09/06/2018220637121Open ↗
▸BISHYDRO FLOW TEST LETTER1
09/06/2018220637121Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
10/02/2020220636989Open ↗
07/17/2020220637871Open ↗
06/01/2020240271530Open ↗
Showing 3 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/06/2020220401241Open ↗
02/20/2020220401241Open ↗
10/26/2018220637121Open ↗
▸BISSUPERSEDING LETTER1
11/26/2019220636989Open ↗
▸BISB FORM 16A (Certificate of Approval for Oil Burning Installation)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
02/29/2016220426411Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/24/2026X00775535-I1Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT31
10/02/2020220636989Open ↗
07/17/2020220637871Open ↗
06/01/2020240271530Open ↗
Showing 3 of 31 on file for this type
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET14
03/02/2018220637853Open ↗
03/02/2018220637871Open ↗
03/02/2018220637862Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM6
05/07/2020240271530Open ↗
04/29/2020220637121Open ↗
04/09/2020220637121Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
10/26/2018220636989Open ↗
03/25/2016220405728Open ↗
Showing 2 of 3 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/09/2020240271530Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
05/28/2020220637880Open ↗
05/28/2020220637880Open ↗
05/28/2020220637862Open ↗
Showing 3 of 6 on file for this type