← Back
BuildNYC
Three families
3669 WILLETT AVENUE
BRONX · BIN 2057380
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R5AZoning
3,960 sfGross Floor Area
3Units
Rent Stabilized8 Active Violations ▸FDNY Report ↗
Three families · 3,300 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation on residential building2p · 1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect108/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Solar ContractingGeneral Contractor108/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854108/04/2026
Building Lifecycle
09/28/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01439984-I1
08/24/2026
Permit issued — Solar
X01439984-I1-SL
08/04/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01439984-I1
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
18 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSolar Contracting08/24/2026
2 projects · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026CompleteSolar Electric Contractng—
07/31/2026CompleteSolar Electric Contractng—
1 project · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Signed-offSolar Contracting—
Nothing on file for this building.
Nothing on file for this building.