← Back
Five to six families
367 HOWARD AVENUE
BROOKLYN · BIN 3038860
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
R6Zoning
5,589 sfGross Floor Area
6Units
Rent Stabilized23 Open Violations 21 unresolved · 2 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: HOWARD DAVID, LLC · 2,430 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Roof3p · 1 filing · 20 docs
Floor 36p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JACOB1304/09/2026
HOWARD DAVID LLC MD SASS103/22/2026
HOWARD DAVID,LLC C/O MD S103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB906/03/2026
VASILIOS ARTEMIOU PE103/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)903/21/2026
XPDITE GROUP 103103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THB CUSTOM BUILDERS INCGeneral Contractor303/21/2026
BROWN, JAMESElectrical103/21/2026
FIRST QUALITY ELECL LLCElectrical103/22/2026
JAMES BROWNElectrical103/21/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN85241006/03/2026
Building Lifecycle
All (169)Filed (10)Permit Issued (3)Violation (60)Inspection (10)Objection (56)Special Inspection (30)
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
07/30/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
07/30/2026
Special inspection requirement — Metering
Shahrish Shuvo
07/30/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
07/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
07/29/2026
Objection resolved — Addressed
07/23/2026
Objection raised — Other
07/20/2026
Objection resolved — Addressed
07/17/2026
Objection raised — Other
07/06/2026
Objection resolved — Addressed
07/02/2026
Objection raised — Other
06/30/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Other
06/19/2026
Objection resolved — Addressed
06/16/2026
Objection raised — Other
06/03/2026
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B01168135-I1
B01168135-P9
05/27/2026
Violation issued (ECB, open)
Construction
05/27/2026
Violation issued (ECB, open)
Construction
05/05/2026
Violation issued (HPD, closed)
A
05/04/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
05/04/2026
Special inspection requirement — Metering
Shahrish Shuvo
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
05/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/04/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
01/29/2026
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B01168135-I1
B01168135-P8
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
01/26/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
01/26/2026
Special inspection requirement — Permanent certificate
Shahrish Shuvo
01/26/2026
Special inspection requirement — Metering
Shahrish Shuvo
01/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
01/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
01/23/2026
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B01168135-I1
B01168135-P7
01/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
01/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
01/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
01/12/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
01/09/2026
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B01168135-I1
B01168135-P6
01/06/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
01/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
12/25/2025
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B01168135-I1
B01168135-P4
12/22/2025
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B01168135-I1
B01168135-P5
10/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/25/2025
Objection resolved — Addressed
06/24/2025
Objection raised — Cost
06/21/2025
Filed — Alteration CO
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B01168135-I1
B01168135-P1
05/20/2025
Permit issued — Sprinklers
B01168135-S3-EW-SP
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC05/20/2025
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC04/22/2025
DOB NOWGeneral ConstructionPermit IssuedTHB CUSTOM BUILDERS INC03/20/2025
BISBLISSUEDW.G.PLBG & HTNG04/15/2003
BISPLISSUEDW.G.PLBG & HTNG04/15/2003
BIS—ISSUEDLIBERTY PAINTING & WALLPAPER INC02/25/2003
BISPLISSUEDW G PLBG & HTG06/14/2001
BIS—ISSUEDN.Y. PENN. CONSTRUCTION CO.05/22/2001
1 project · most recent 06/03/2026
Sprinkler System
FiledStatusContractorScope
06/03/2026Signed-offARCO PLBG AND HTG INCSprinkler System
1 project · most recent 06/03/2026
Water/Sanitary
FiledStatusContractorScope
06/03/2026Signed-offDOUBLE SOLUTIONS INCWater/Sanitary
2 projects · most recent 01/13/2026
General Wiring
FiledStatusContractorScope
01/13/2026CompleteACCURATE ELEC'L CORP.14 meters, 14 new_meters
08/25/2025CompleteFIRST QUALITY ELECL LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
07/30/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/30/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
07/30/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
07/30/2026Permanent certificateShahrish Shuvoenergy_progress
07/30/2026MeteringShahrish Shuvoenergy_progress
07/30/2026Interior lighting powerShahrish Shuvoenergy_progress
07/30/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
05/04/2026Permanent certificateShahrish Shuvoenergy_progress
05/04/2026MeteringShahrish Shuvoenergy_progress
05/04/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
05/04/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
05/04/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
05/04/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/04/2026Interior lighting powerShahrish Shuvoenergy_progress
01/26/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
01/26/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
01/26/2026Interior lighting powerShahrish Shuvoenergy_progress
01/26/2026Permanent certificateShahrish Shuvoenergy_progress
01/26/2026MeteringShahrish Shuvoenergy_progress
01/26/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
01/26/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
01/12/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
01/12/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
01/12/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
01/12/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
Latest 25 of 56.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/22/2026B01168135-A1Request digital key ↗
08/16/2026B01168135-P7Request digital key ↗
08/16/2026B01168135-S3Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
01/07/2026301413628Open ↗
12/24/2025301413628Open ↗
07/08/2025301152516Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWHouse Number Verification: TOPO Stamp5
08/13/2026B01168135-P4Open ↗
08/13/2026B01168135-I1Open ↗
08/13/2026B01168135-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B01168135-S1Open ↗
09/01/2026B01168135-S1Open ↗
09/01/2026B01168135-P9Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026B01168135-A1Open ↗
08/16/2026B01168135-S1Open ↗
08/16/2026B01168135-P7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01168135-S1Open ↗
09/01/2026B01168135-P9Open ↗
09/01/2026B01168135-P6Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist7
08/22/2026B01168135-A1Open ↗
08/15/2026B01168135-P9Open ↗
08/13/2026B01168135-I1Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/05/2026301413628Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification7
08/22/2026B01168135-A1Open ↗
08/16/2026B01168135-P7Open ↗
08/16/2026B01168135-P8Open ↗
Showing 3 of 7 on file for this type