← Back
Primarily 1 family with 1 store or office
3678 WHITE PLAINS ROAD
BRONX · BIN 2057894
💬 Discuss this project
1915Year Built
2Stories
S1Building Class
R7AZoning
2,100 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: ALKAIFI REALTY LLC · 2,044 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NUGACON BUILDING SERVICES, LLC1007/08/2026
JAY REALTY ENTERPRISES IN603/22/2026
ALKAIFI REALTY LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/14/2022$600K—— → —$286/sf building
12/10/2015$295K—78 WPR LLC → JAY REALTY ENTERPRISES INC.$140/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NS ENGINEERS, P.C.207/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NUGACON BUILDING SERVICES, LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NUGACON BUILDING SERVICESGeneral Contractor404/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing106/28/2026
Building Lifecycle
All (50)Filed (2)Permit Issued (4)Violation (33)Inspection (10)Special Inspection (1)
11/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/18/2025
Permit issued — Plumbing
X01080332-S1-PL
11/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/03/2024
Permit issued — General Construction
X01080332-I1-GC
08/09/2024
Permit issued — Plumbing
X01080332-S1-PL
08/02/2024
Permit issued — General Construction
X01080332-I1-GC
07/29/2024
Filed — Alteration
Replace existing non-residential gas stove , 2 non residential sink and 2 piece bathroom (toilet and lavatory) at 1st floor
X01080332-S1
07/29/2024
Filed — Alteration
Replace existing non-residential gas stove , 2 non residential sink and 2 piece bathroom (toilet and lavatory) at 1st floor
X01080332-I1
07/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
Shamsul Siddique
11/28/2023
Violation issued (HPD, closed)
I
11/17/2022
Violation issued (HPD, closed)
I
02/24/2021
Violation issued (HPD, open)
A
02/24/2021
Violation issued (HPD, open)
A
02/24/2021
Violation issued (HPD, closed)
B
07/29/2020
Violation issued (HPD, closed)
A
11/14/2018
Violation issued (ECB, closed)
Construction
11/14/2018
Violation issued (ECB, closed)
Quality of Life
11/14/2018
Violation issued (ECB, closed)
Quality of Life
11/14/2018
Violation issued (ECB, closed)
Quality of Life
11/14/2018
Violation issued (ECB, closed)
Quality of Life
09/18/2018
Violation issued (HPD, closed)
A
09/18/2018
Violation issued (HPD, closed)
B
09/18/2018
Violation issued (HPD, closed)
B
09/18/2018
Violation issued (HPD, closed)
B
09/18/2018
Violation issued (HPD, closed)
B
09/18/2018
Violation issued (HPD, closed)
B
09/18/2018
Violation issued (HPD, closed)
B
09/18/2018
Violation issued (HPD, closed)
B
01/08/2018
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (ECB, closed)
Construction
02/15/2016
Violation issued (HPD, closed)
C
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/02/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHORBRIDGE PLUMBING & HEAT03/18/2025
DOB NOWGeneral ConstructionPermit IssuedNUGACON BUILDING SERVICES10/03/2024
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC08/09/2024
DOB NOWGeneral ConstructionPermit IssuedNUGACON BUILDING SERVICES08/02/2024
1 project · most recent 07/29/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/29/2024Permit IssuedHORBRIDGE PLUMBING & HEATGas, Water/Sanitary
1 project · most recent 08/22/2024
General Wiring
FiledStatusContractorScope
08/22/2024Permit IssuedV. VASS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/12/2024Fire-Resistance Rated ConstructionShamsul Siddiqueprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026X01080332-I1Request digital key ↗
08/21/2026X01080332-S1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01080332-I1Open ↗
08/13/2026X01080332-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026X01080332-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01080332-S1Open ↗
08/13/2026X01080332-I1Open ↗