← Back
Five to six families
3679 PAULDING AVENUE
BRONX · BIN 2058850
💬 Discuss this project
1928Year Built
3Stories
C2Building Class
R4Zoning
5,840 sfGross Floor Area
6Units
Rent Stabilized9 Open Violations 5 unresolved · 4 paperwork only ▸
Five to six families · Owner of record: PAULDING AVE APTS LLC · 2,904 sf lot · 2.01 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PAULDING AVE APTS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2024$1.1M—— → —$197/sf building
09/14/2023$575K—— → —$98/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHAQ311/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALLSTATE EXPEDITERS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADOR BUILDERS LLCGeneral Contractor207/08/2026
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524311/04/2024
Building Lifecycle
All (75)Filed (3)Permit Issued (3)Signed Off (3)Violation (52)Inspection (5)Special Inspection (9)
04/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2026
Violation issued (ECB, open)
Construction
12/31/2025
Violation issued (HPD, closed)
C
12/25/2025
Violation issued (HPD, closed)
B
12/25/2025
Violation issued (HPD, open)
B
12/25/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2025
Signed off — Alteration
MECHANICAL FILED FOR THE INSTALLATION ELECTRICAL HEATING EQUIPMENT
X01114608-I1
02/13/2025
Signed off — Alteration
MECHANICAL FILED FOR THE INSTALLATION ELECTRICAL HEATING EQUIPMENT
X01114608-S2
02/13/2025
Signed off — Alteration
MECHANICAL FILED FOR THE INSTALLATION ELECTRICAL HEATING EQUIPMENT
X01114608-S1
02/04/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/27/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/16/2024
Permit issued — Mechanical Systems
X01114608-S2-MS
12/06/2024
Permit issued — Plumbing
X01114608-S1-PL
11/25/2024
Violation issued (HPD, closed)
I
11/22/2024
Permit issued — General Construction
X01114608-I1-GC
11/04/2024
Filed — Alteration
MECHANICAL FILED FOR THE INSTALLATION ELECTRICAL HEATING EQUIPMENT
X01114608-S2
10/30/2024
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/30/2024
Special inspection requirement — Lighting controls
Shahrish Shuvo
10/30/2024
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/30/2024
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
09/30/2024
Filed — Alteration
MECHANICAL FILED FOR THE INSTALLATION ELECTRICAL HEATING EQUIPMENT
X01114608-S1
09/26/2024
Filed — Alteration
MECHANICAL FILED FOR THE INSTALLATION ELECTRICAL HEATING EQUIPMENT
X01114608-I1
09/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
09/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
09/20/2024
Special inspection requirement — Final
Shahrish Shuvo
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/03/2024
Violation issued (HPD, closed)
A
03/14/2024
Violation issued (ECB, open)
Construction
04/03/2023
Violation issued (ECB, open)
Construction
04/03/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2023
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/11/2018
Violation issued (HPD, closed)
I
10/31/2016
Violation issued (HPD, closed)
I
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, open)
C
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, closed)
B
08/04/2015
Violation issued (HPD, closed)
B
01/25/2014
Violation issued (HPD, closed)
C
01/25/2014
Violation issued (HPD, closed)
C
01/25/2014
Violation issued (HPD, closed)
C
01/25/2014
Violation issued (HPD, closed)
C
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC12/16/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC12/06/2024
DOB NOWGeneral ConstructionSigned-offADOR BUILDERS LLC11/22/2024
2 projects · most recent 01/16/2026
General Wiring
FiledStatusContractorScope
01/16/2026CompleteDAVRY ELECTRIC INCGeneral Wiring
12/14/2024CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/04/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/02/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/27/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/30/2024Fenestration areasShahrish Shuvoenergy_progress
10/30/2024Lighting controlsShahrish Shuvoenergy_progress
10/30/2024Fenestration air leakageShahrish Shuvoenergy_progress
10/30/2024Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/30/2024Lighting in dwelling unitsShahrish Shuvoenergy_progress
09/20/2024Energy Code Compliance InspectionsShahrish Shuvoprogress
09/20/2024Fire-Resistance Rated ConstructionShahrish Shuvoprogress
09/20/2024FinalShahrish Shuvoprogress
09/20/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026X01114608-S2Request digital key ↗
08/20/2026X01114608-I1Request digital key ↗
08/20/2026X01114608-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026X01114608-S1Open ↗
08/20/2026X01114608-I1Open ↗
08/20/2026X01114608-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X01114608-I1Open ↗
09/01/2026X01114608-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X01114608-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026X01114608-S1Open ↗
08/20/2026X01114608-I1Open ↗
08/20/2026X01114608-S2Open ↗
▸Other Documents3
▸DOB NOWDHCR Document3
08/13/2026X01114608-I1Open ↗
08/13/2026X01114608-S2Open ↗
08/13/2026X01114608-S1Open ↗