← Back
Single or multiple dwelling with stores or offices
368 COURT STREET
💬 Discuss this project
1931Year Built
4Stories
S9Building Class
R6AZoning
4,300 sfGross Floor Area
5Units
Rent Stabilized0 Open Violations
Single or multiple dwelling with stores or offices · Owner of record: SPECTACLE 368 COURT, LLC · 1,300 sf lot · 3.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentLandscapeGeneral
Roof15p · 3 filings · 20 docs
Floor 419p · 3 filings · 20 docs
Floor 315p · 4 filings · 20 docs
Floor 215p · 4 filings · 20 docs
Floor 124p · 5 filings · 20 docs
Cellar10p · 2 filings · 20 docs
Site & exterior14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAVEAN HOLDINGS2707/08/2026
GSR CONTRACTOR INC.703/22/2026
A D GENERAL CONTRACTORS604/09/2026
SPECTACLE 368 COURT, LLC103/22/2026
GULO CONSULTING CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/15/2024$5.2M—368 COURT STREET OWNER LLC → SPECTACLE 368 COURT, LLC$1,206/sf building
10/28/2021$2.9M—274-275 PRESIDENT STREET CORP. → 368 COURT STREET OWNER LLC$674/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
ENKAY DESIGN CONSULTING603/21/2026
JACK JAFFA & ASSOCIATES1003/21/2026
GREEN STUDIO203/21/2026
SAGACITY BUILDING SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GSR CONTRACTOR INCGeneral Contractor603/21/2026
HAIAN HONEST RENOVATIONGeneral Contractor603/21/2026
A & D GENERAL CONTR INCGeneral Contractor404/09/2026
KJK ELECTRIC INCElectrical303/22/2026
ABA INNOVATIVE BUILDERS IGeneral Contractor303/21/2026
NEW YORK STANDARD MECH CORPPlumbing107/08/2026
RAIDEN ELECTRIC, LLCElectrical103/22/2026
DONE RIGHT HOOD & FIRE SAGeneral Contractor104/09/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
CHL ELECT CONTRACTOR INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244102/06/2025
SOHAIL HUMAYUN P E INC8457102/06/2025
ATELIER ARCHITECTURE 64 P4634204/18/2024
BIZ DESIGNS LLC6312502/28/2023
Building Lifecycle
All (119)Filed (11)Permit Issued (10)Signed Off (6)Violation (13)Inspection (5)Objection (44)Special Inspection (30)
11/17/2025
Permit issued — Mechanical Systems
B01162157-I1-MS
09/29/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Other
09/26/2025
Objection raised — Other
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Cost
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOHAIL HUMAYUN
09/16/2025
Objection resolved — Addressed
08/20/2025
Signed off — Alteration
INTER. RENOV.: REMOVAL & DISPOSAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALLAT'N OF NEW GWB, FLR, CLG & WALL FINISHES. INSTALLAT'N OF REPLACEMENT LIGHT FIXTS. REPLACEMENT HVAC SYSTEM. NO CHANGE TO EGRESS OR OCCUP.. NO ENLRGMT NOR DEVELOPMT.
B00746173-I1
07/28/2025
Special inspection requirement — Mechanical Systems
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — Final
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — Energy Code Compliance Inspections
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — Interior lighting power
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — Maintenance information
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — Lighting controls
PHILLIP ANZALONE
07/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PHILLIP ANZALONE
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
06/30/2025
Permit issued — Supported Scaffold
B01248504-I1-SH
06/30/2025
Permit issued — Supported Scaffold
B01248504-I1-SF
06/28/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01248504-I1
03/27/2025
Objection resolved — Addressed
02/07/2025
Objection raised — Fire_Protection
02/07/2025
Objection raised — Scope
02/07/2025
Objection raised — Structural
02/06/2025
Filed — Alteration
Install commercial kitchen hood, exhaust & make up air systems.
B01162157-I1
01/02/2025
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
01/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
01/02/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
SOHAIL HUMAYUN
01/02/2025
Special inspection requirement — Maintenance information
SOHAIL HUMAYUN
01/02/2025
Special inspection requirement — Final
SOHAIL HUMAYUN
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
01/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
SOHAIL HUMAYUN
01/02/2025
Special inspection requirement — Ventilation and air distribution system
SOHAIL HUMAYUN
04/25/2024
Objection raised — Other
04/22/2024
Objection raised — Scope
04/22/2024
Objection raised — Other
04/18/2024
Filed — Alteration
INTER. RENOV.: REMOVAL & DISPOSAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALLAT'N OF NEW GWB, FLR, CLG & WALL FINISHES. INSTALLAT'N OF REPLACEMENT LIGHT FIXTS. REPLACEMENT HVAC SYSTEM. NO CHANGE TO EGRESS OR OCCUP.. NO ENLRGMT NOR DEVELOPMT.
B00746173-P1
04/09/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00869181-I1
06/15/2023
Permit issued — Sidewalk Shed
B00869181-I1-SH
05/09/2023
Signed off — Alteration
Installation, relocation, replacement and removal of plumbing fixtures as shown on plans filed herewith.
B08019544-I1
05/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/05/2023
Permit issued — Sidewalk Shed
B00869181-I1-SH
05/04/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00869181-I1
05/04/2023
Signed off — Alteration
Installation of mechanical units as shown on plans filed herewith.
B08038546-I1
05/04/2023
Signed off — Alteration
Interior renovation as shown on plans filed herewith.
B08019520-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
02/28/2023
Filed — Alteration
Installation, relocation, replacement and removal of plumbing fixtures as shown on plans filed herewith.
B08019544-P1
02/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDONE RIGHT HOOD & FIRE SA11/17/2025
DOB NOWSupported ScaffoldPermit IssuedA & D GENERAL CONTR INC06/30/2025
DOB NOWSupported ScaffoldPermit IssuedA & D GENERAL CONTR INC06/30/2025
DOB NOWSidewalk ShedSigned-offGSR CONTRACTOR INC06/15/2023
DOB NOWSidewalk ShedSigned-offGSR CONTRACTOR INC05/05/2023
DOB NOWMechanical SystemsSigned-offHAIAN HONEST RENOVATION11/22/2022
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP11/02/2022
DOB NOWGeneral ConstructionSigned-offHAIAN HONEST RENOVATION10/31/2022
DOB NOWGeneral ConstructionSigned-offABA INNOVATIVE BUILDERS I10/07/2022
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP08/29/2022
1 project · most recent 02/06/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/06/2025Permit IssuedDONE RIGHT HOOD & FIRE SAVentilation Systems
Ventilation
Dayton 4YC59 3,846 CFM · Makeup Air ×1
800W77 5,138 CFM · Kitchen Exhaust ×1
9 projects · most recent 07/30/2025
General Wiring Lighting
FiledStatusContractorScope
07/30/2025Permit IssuedRICHARD NEU—
03/11/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
05/19/2023CompleteKJK ELECTRIC INCGeneral Wiring
05/19/2023CompleteKJK ELECTRIC INC6 meters, 5 new_meters
05/08/2023CompleteRICHARD NEU—
01/18/2023CompleteKJK ELECTRIC INCGeneral Wiring
09/08/2022CompleteRAIDEN ELECTRIC LLCGeneral Wiring, Lighting
08/15/2022CompleteCHL ELECT CONTRACTOR INC1 meters, 1 new_meters
03/04/2022CompleteCHL ELECT CONTRACTOR INC—
1 project · most recent 06/28/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/28/2025Permit IssuedA & D GENERAL CONTR INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
09/26/2025Fire-Resistant Penetrations and JointsSOHAIL HUMAYUNspecial
07/28/2025Mechanical SystemsPHILLIP ANZALONEspecial
07/28/2025Fire-Resistant Penetrations and JointsPHILLIP ANZALONEspecial
07/28/2025FinalPHILLIP ANZALONEprogress
07/28/2025Energy Code Compliance InspectionsPHILLIP ANZALONEprogress
07/28/2025Interior lighting powerPHILLIP ANZALONEenergy_progress
07/28/2025HVAC-R and service water heating equipmentPHILLIP ANZALONEenergy_progress
07/28/2025Maintenance informationPHILLIP ANZALONEenergy_progress
07/28/2025HVAC-R and service water heating system controlsPHILLIP ANZALONEenergy_progress
07/28/2025Lighting controlsPHILLIP ANZALONEenergy_progress
07/28/2025HVAC-R and service water piping design and insulationPHILLIP ANZALONEenergy_progress
01/02/2025Mechanical SystemsSOHAIL HUMAYUNspecial
01/02/2025Tenant Protection Plan ComplianceNARESH MAHANGUspecial
01/02/2025Exhaust and Vent Systems in Plenums and DuctsSOHAIL HUMAYUNspecial
01/02/2025Maintenance informationSOHAIL HUMAYUNenergy_progress
01/02/2025FinalSOHAIL HUMAYUNprogress
01/02/2025Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
01/02/2025Fire-Resistance Rated ConstructionSOHAIL HUMAYUNprogress
01/02/2025Ventilation and air distribution systemSOHAIL HUMAYUNenergy_progress
03/02/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
02/28/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
01/31/2023HVAC-R and service water heating system controlsPHILLIP ANZALONEenergy_progress
01/31/2023HVAC-R and service water heating equipmentPHILLIP ANZALONEenergy_progress
01/31/2023Maintenance informationPHILLIP ANZALONEenergy_progress
01/31/2023HVAC-R and service water piping design and insulationPHILLIP ANZALONEenergy_progress
Latest 25 of 42.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B08019520-I1Request digital key ↗
08/28/2026B08019520-P1Request digital key ↗
08/28/2026B08038546-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature23
08/29/2026B08038546-I1Open ↗
08/29/2026B08038546-I1Open ↗
08/29/2026B08038546-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B08019544-P1Open ↗
08/29/2026B08038546-I1Open ↗
08/27/2026B00746173-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/29/2026B00746173-P1Open ↗
08/29/2026B00746173-I1Open ↗
08/28/2026B08019520-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B08019520-P1Open ↗
08/28/2026B08019520-I1Open ↗
08/27/2026B08019544-P1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026B00746173-I1Open ↗