Elevator apt, semi-fireproof without stores
368 EAST 152 STREET
BRONX · Melrose · BIN 2823631
💬 Discuss this project
2023Year Built
7Stories
D1Building Class
R7-1Zoning
23,524 sfGross Floor Area
32Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof without stores · Owner of record: 368 E 152 DEVELOPMENT LLC · 6,344 sf lot · 3.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof18p · 2 filings · 16 docs
Floor 721p · 3 filings · 18 docs
Floor 621p · 3 filings · 18 docs
Floor 520p · 3 filings · 18 docs
Floor 420p · 3 filings · 18 docs
Floor 320p · 3 filings · 18 docs
Floor 220p · 3 filings · 18 docs
Floor 123p · 4 filings · 20 docs
Site & exterior13p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
254 MELROSE1707/08/2026
JAKE NATE CONSTRUCTION1007/08/2026
PRECISION OWNERS507/08/2026
INTERNATIONAL CONCRETE307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2022$1.8M—MOTT HAVEN BUILDING PURCHASE LLC → 368 E 152 DEVELOPMENT LLC— not available
01/18/2017$1.1M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA503/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION BUILD USA INCGeneral Contractor807/08/2026
JAKE AND NATE CONSTRUCTGeneral Contractor407/08/2026
TOVIA WERZBERGERElectrical303/21/2026
PRECISION BUILDERS USAGeneral Contractor303/21/2026
BOAZ M GOLANI ARCHITECTGeneral Contractor203/22/2026
CHS CONTRACTING LLCGeneral Contractor203/22/2026
INTERNATIONAL CONCRETE C*General Contractor107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
POWER DIRECT ELECTRIC INC 005103General Contractor103/22/2026
MW CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOMATED DESIGN CONSULTA895103/07/2024
ENGINEERING CONSULTING SE2050102/02/2023
SHAHRISH SHUVO ENGINEERIN8524102/02/2023
Building Lifecycle
All (64)Filed (9)Permit Issued (10)Signed Off (7)Violation (5)Inspection (7)Objection (2)Special Inspection (24)
04/17/2025
Violation issued (ECB, closed)
Construction
01/09/2025
Violation issued (ECB, closed)
Elevators
12/13/2024
Signed off — Alteration
Filing curb cut application in conjunction with NB application #220586168-I1
X01014160-I1
12/12/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/25/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/18/2024
Permit issued — Curb Cut
X01014160-I1-CC
04/04/2024
Objection resolved — Addressed
03/27/2024
Objection raised — Structural
03/19/2024
Signed off — Alteration
Install mechanical systems per the plans filed herewith and in conjunction with NB#220586168. There is no change in use occupancy or egress.
X00801103-I1
03/12/2024
Filed — Alteration
Filing curb cut application in conjunction with NB application #220586168-I1
X01014160-I1
03/11/2024
Special inspection requirement — Shutoff dampers
Shahrish Shuvo
03/11/2024
Special inspection requirement — Ventilation and air distribution system
Shahrish Shuvo
03/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
03/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
03/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
03/11/2024
Special inspection requirement — Maintenance information
Shahrish Shuvo
03/11/2024
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
03/11/2024
Special inspection requirement — Final
Shahrish Shuvo
03/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
03/07/2024
Filed — Alteration
Install mechanical systems per the plans filed herewith and in conjunction with NB#220586168. There is no change in use occupancy or egress.
X00801103-P1
03/04/2024
Signed off — Alteration
X00822093-I1
02/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Mortman
02/01/2024
Special inspection requirement — Final
Gregory Mortman
02/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Mortman
02/01/2024
Special inspection requirement — Shutoff dampers
Gregory Mortman
02/01/2024
Special inspection requirement — Ventilation and air distribution system
Gregory Mortman
02/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Mortman
02/01/2024
Special inspection requirement — Maintenance information
Gregory Mortman
02/01/2024
Special inspection requirement — Mechanical Systems
Gregory Mortman
02/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Gregory Mortman
01/31/2024
Signed off — Alteration
Filing construction fence in conjunction to primary bis job 220586168
X00748526-I1
01/04/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/02/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/27/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00878100-I1
10/27/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00851958-I1
10/18/2023
Permit issued — Mechanical Systems
X00801103-I1-MS
09/14/2023
Violation issued (ECB, closed)
Construction
07/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2023
Permit issued — Plumbing
X00822093-I1-EW-SP
06/12/2023
Signed off — Alteration
X00861211-I1
06/07/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00878100-P1
06/02/2023
Permit issued — Supported Scaffold
X00878100-I1-SF
05/31/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00878100-I1
05/12/2023
Permit issued — Construction Fence
X00748526-I1-FN
04/26/2023
Filed — Alteration
X00861211-I1
04/26/2023
Permit issued — Protection and Mechanical Methods
X00861211-I1-PMM
04/04/2023
Permit issued — Sidewalk Shed
X00851958-I1-SH
04/03/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00851958-I1
03/23/2023
Permit issued — Construction Fence
X00748526-I1-FN
03/14/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2023
Permit issued — Sprinklers
X00822093-I1-PL
02/02/2023
Filed — Alteration
Install mechanical systems per the plans filed herewith and in conjunction with NB#220586168. There is no change in use occupancy or egress.
X00801103-I1
02/02/2023
Filed — Alteration
X00822093-I1
02/02/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
02/01/2023
Special inspection requirement — Maintenance information
PAUL MARINO
02/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
02/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
02/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
02/01/2023
Special inspection requirement — Sprinkler Systems
PAUL MARINO
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPRECISION BUILD USA INC04/18/2024
DOB NOWMechanical SystemsSigned-offPRECISION BUILD USA INC10/18/2023
DOB NOWPlumbingSigned-offA M B MECHANICAL INC06/15/2023
DOB NOWSupported ScaffoldSigned-offJAKE AND NATE CONSTRUCT06/02/2023
DOB NOWConstruction FenceSigned-offPRECISION BUILD USA INC05/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offINTERNATIONAL CONCRETE C*04/26/2023
DOB NOWSidewalk ShedSigned-offJAKE AND NATE CONSTRUCT04/04/2023
DOB NOWConstruction FenceSigned-offMW CONSTRUCTION INC03/23/2023
DOB NOWSprinklersSigned-offYG SERVICES INC02/22/2023
DOB NOWConstruction FenceSigned-offPRECISION BUILDERS USA06/03/2022
BIS—ISSUEDCHS CONTRACTING LLC03/28/2023
BIS—ISSUEDPRECISION BUILDERS USA02/23/2023
BIS—ISSUEDPRECISION BUILDERS USA02/21/2023
BIS—ISSUEDPRECISION BUILDERS USA02/21/2023
BIS—ISSUEDPRECISION BUILDERS USA05/20/2022
BIS—ISSUEDPRECISION BUILDERS USA05/11/2022
BIS—ISSUEDPRECISION BUILDERS USA05/11/2022
BISEQISSUEDPRECISION BUILDERS USA04/08/2022
7 projects · most recent 04/08/2025
General Wiring
FiledStatusContractorScope
04/08/2025CompletePOWER DIRECT ELECTRIC INC—
04/08/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
05/11/2023CompletePOWER DIRECT ELECTRIC INC—
04/25/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
04/10/2023CompleteRICHARD NEU—
02/04/2019CompleteAMIN ELECTRICAL CORP—
07/14/2018CompleteABSOLUTE ADVANCED ELEC IN1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/12/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/25/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
01/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
03/11/2024Shutoff dampersShahrish Shuvoenergy_progress
03/11/2024Ventilation and air distribution systemShahrish Shuvoenergy_progress
03/11/2024HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
03/11/2024HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
03/11/2024HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
03/11/2024Maintenance informationShahrish Shuvoenergy_progress
03/11/2024Mechanical SystemsShahrish Shuvospecial
03/11/2024FinalShahrish Shuvoprogress
03/11/2024Energy Code Compliance InspectionsShahrish Shuvoprogress
02/01/2024HVAC-R and service water heating system controlsGregory Mortmanenergy_progress
02/01/2024FinalGregory Mortmanprogress
02/01/2024HVAC-R and service water piping design and insulationGregory Mortmanenergy_progress
02/01/2024Shutoff dampersGregory Mortmanenergy_progress
02/01/2024Ventilation and air distribution systemGregory Mortmanenergy_progress
02/01/2024HVAC-R and service water heating equipmentGregory Mortmanenergy_progress
02/01/2024Maintenance informationGregory Mortmanenergy_progress
02/01/2024Mechanical SystemsGregory Mortmanspecial
02/01/2024Energy Code Compliance InspectionsGregory Mortmanprogress
02/02/2023Energy Code Compliance InspectionsPAUL MARINOprogress
02/01/2023Maintenance informationPAUL MARINOenergy_progress
02/01/2023HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
02/01/2023HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
02/01/2023HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
02/01/2023Sprinkler SystemsPAUL MARINOspecial
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026X00748526-I1Request digital key ↗
08/23/2026X00822093-I1Request digital key ↗
08/23/2026X00851958-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION46
08/28/2024220586168Open ↗
08/15/2024220586168Open ↗
08/12/2024220586168Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION6
03/30/2023220586168Open ↗
05/23/2022220586168Open ↗
05/13/2022220586168Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
11/16/2023220586177Open ↗
03/02/2017220586177Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM7
08/11/2022220586168Open ↗
08/11/2022220586168Open ↗
09/11/2019220586168Open ↗
Showing 3 of 7 on file for this type
▸BISVERIFY TAX LOT1
11/03/2023220586168Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/07/2018220586168Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/10/2023220586168Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026X00748526-I1Open ↗
08/23/2026X00851958-I1Open ↗
08/23/2026X00861211-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/07/2018220586168Open ↗
05/07/2018220586168Open ↗
05/07/2018220586168Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/14/2026X00822093-I1Open ↗
09/14/2026X00822093-I1Open ↗
08/25/2026X00801103-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/14/2026X00822093-I1Open ↗
08/25/2026X00801103-P1Open ↗
08/23/2026X00801103-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/11/2018220630752Open ↗
12/08/2017220628140Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/11/2018220630752Open ↗
12/08/2017220628140Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/11/2018220630752Open ↗
12/08/2017220628140Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/01/2024220586168Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/06/2024220586168Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE SIGNOFF3
03/28/2024220586177Open ↗
01/31/2024220586168Open ↗
01/31/2024220586168Open ↗
▸BISSTREET TREE CHECKLIST3
11/16/2023220586177Open ↗
03/02/2017220586168Open ↗
03/02/2017220586177Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
04/08/2022220586168Open ↗
03/25/2022220586168Open ↗
▸BISEXACAVATION SHEETING SHORING AND BRACING SHALL BE PROVIDED PRIOR TO PERMIT1
02/02/2024220586168Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
02/01/2024220586168Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/13/2022220586168Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/07/2018220586168Open ↗
01/11/2018220630752Open ↗
12/08/2017220628140Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/05/2022220586168Open ↗
04/01/2022220586168Open ↗
03/25/2022220586168Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
02/01/2024220586168Open ↗
02/01/2024220586168Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/01/2024220586168Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/01/2024220586168Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/01/2024220586168Open ↗
▸BISELECTRIC MOTORS1
02/01/2024220586168Open ↗
▸BISLIGHTING CONTROLS1
02/01/2024220586168Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/01/2024220586168Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
02/01/2024220586168Open ↗
▸BISEXTERIOR LIGHTING POWER1
02/01/2024220586168Open ↗
▸BISFENESTRATION AIR LEAKAGE1
02/01/2024220586168Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/01/2024220586168Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00801103-I1Open ↗
▸Inspections & Test Reports16
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
02/01/2024220586168Open ↗
02/01/2024220586168Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/27/2023220586168Open ↗
04/01/2022220586168Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/17/2024220586168Open ↗
04/01/2022220586168Open ↗
▸BISMASONRY1
02/01/2024220586168Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/01/2024220586168Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/25/2022220586168Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
05/21/2018220586168Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
02/01/2024220586168Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
02/01/2024220586168Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/01/2024220586168Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
10/10/2023220586168Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/01/2024220586168Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/17/2024220586168Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSCHEDULE A - OCCUPANCY / USE23
08/28/2024220586168Open ↗
08/15/2024220586168Open ↗
08/12/2024220586168Open ↗
Showing 3 of 23 on file for this type
▸BISSUPERSEDING LETTER2
03/30/2023220586168Open ↗
05/23/2022220586168Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
02/09/2024220586168Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/08/2022220586168Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT5
01/11/2018220630752Open ↗
01/11/2018220630743Open ↗
12/08/2017220628140Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/30/2023220586168Open ↗
05/23/2022220586168Open ↗
04/08/2022220586168Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION14
03/14/2024220586168Open ↗
03/14/2024220586168Open ↗
11/13/2023220586177Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET6
01/11/2018220630752Open ↗
01/11/2018220630743Open ↗
12/08/2017220628140Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
04/08/2022220586168Open ↗
09/05/2018220586168Open ↗
09/05/2018220586168Open ↗
▸Other Documents7
▸BISBPP - SUPPORTING DOCUMENTATION2
11/13/2023220586177Open ↗
11/13/2023220586177Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
02/01/2024220586168Open ↗
▸BISMAINTENANCE INFORMATION1
02/01/2024220586168Open ↗
▸BISPERMANENT CERTIFICATE1
02/01/2024220586168Open ↗
▸BISVIOLATIONS SEARCH1
02/05/2024220586168Open ↗
▸BISPLOT DIAGRAM1
03/02/2017220586168Open ↗