Walk-up cooperative
368 EAST 8 STREET
MANHATTAN · East Village · BIN 1004506
💬 Discuss this project
1923Year Built
6Stories
C6Building Class
R8BZoning
19,632 sfGross Floor Area
31Units
Rent Stabilized1 Open Violation ▸FISP: SAFEFDNY Report ↗
Walk-up cooperative · Owner of record: TENANTS OF 368 E 8TH ST HDF CORP · 4,680 sf lot · 4.19 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Floor 69p · 1 filing · 7 docs
Floor 59p · 1 filing · 7 docs
Floor 49p · 1 filing · 7 docs
Floor 39p · 1 filing · 7 docs
Floor 29p · 1 filing · 7 docs
Floor 19p · 1 filing · 7 docs
Cellar11p · 1 filing · 18 docs
Site & exterior7p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TENANTS OF 368 EAST 8 STREET HDFC1907/08/2026
368 EAST 8 STREET HDFC403/21/2026
HDFC403/21/2026
TENANTS OF 368 E 8TH STREET HDFC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.310/06/2021
GREEN DESIGN107/17/2020
BEST PROFESSIONALS NY CORP210/31/2019
SCALAR ARCHITECTURE PC103/14/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor907/08/2026
A & C HTG SERVICES, INCPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851310/06/2021
Building Lifecycle
All (67)Filed (7)Permit Issued (15)Signed Off (5)Facade (FISP) (15)Violation (17)Special Inspection (8)
05/09/2023
Cycle 9 facade report signed — SAFE
03/15/2023
Violation issued (HPD, closed)
A
02/19/2023
Cycle 9 facade report submitted
02/13/2023
Cycle 9 facade inspection completed
12/15/2022
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00387405-I1
11/02/2022
Violation issued (HPD, closed)
I
01/27/2022
Permit issued — Plumbing
M00387405-I1-PL
11/02/2021
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00387405-S1
10/28/2021
Signed off — Alteration
M00026867-I1
10/20/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY (59'-78') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00371752-I1
10/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/06/2021
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00387405-P1
10/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
08/31/2021
Cycle 8 facade report signed — SAFE
06/30/2021
Cycle 8 facade report submitted
06/15/2021
Cycle 8 facade inspection completed
04/29/2021
Permit issued — Plumbing
M00387405-I1-PL
04/29/2021
Permit issued — Boiler Equipment
M00387405-S1-BE
03/24/2021
Permit issued — Sidewalk Shed
M00026867-I1-SH
12/17/2020
Permit issued — Plumbing
M00387405-I1-PL
12/03/2020
Permit issued — Boiler Equipment
M00387405-S1-BE
09/15/2020
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00387405-S1
09/15/2020
Permit issued — Boiler Equipment
M00387405-S1-BE
09/03/2020
Permit issued — Plumbing
M00387405-I1-PL
09/03/2020
Special inspection requirement — Maintenance information
LOUIS ARENA
09/03/2020
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
09/03/2020
Special inspection requirement — Heating Systems
LOUIS ARENA
09/03/2020
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
09/02/2020
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00387405-I1
08/18/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY 65' HIGH PIPE SCAFFOLD ORIGINATING (OFF GRADE) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00252688-I1
07/20/2020
Permit issued — Supported Scaffold
M00371752-I1-SF
07/17/2020
Filed — Alteration
INSTALLATION OF TEMPORARY (59'-78') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00371752-I1
07/16/2020
Special inspection requirement — Final
Sunil Saigal
04/01/2020
Permit issued — Sidewalk Shed
M00026867-I1-SH
03/21/2020
Permit issued — Sidewalk Shed
M00026867-I1-SH
10/31/2019
Filed — Alteration
INSTALLATION OF TEMPORARY 65' HIGH PIPE SCAFFOLD ORIGINATING (OFF GRADE) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00252688-P1
10/31/2019
Special inspection requirement — Final
BRIAN T. O'CONNOR
10/28/2019
Permit issued — Supported Scaffold
M00252688-I1-SF
10/25/2019
Filed — Alteration
INSTALLATION OF TEMPORARY 65' HIGH PIPE SCAFFOLD ORIGINATING (OFF GRADE) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00252688-I1
06/19/2019
Violation issued (HPD, open)
A
03/21/2019
Permit issued — Sidewalk Shed
M00026867-I1-SH
07/31/2018
Permit issued — Sidewalk Shed
M00026867-I1-SH
05/30/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2018
Permit issued — Sidewalk Shed
M00026867-I1-SH
03/14/2018
Filed — Alteration
M00026867-I1
02/28/2018
Violation issued (ECB, closed)
Construction
02/28/2018
Violation issued (ECB, closed)
Construction
02/17/2018
Cycle 8 facade report submitted
02/17/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2018
Cycle 8 facade report signed — UNSAFE
01/29/2018
Cycle 8 facade inspection completed
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/21/2012
Cycle 7 facade report submitted
08/21/2012
Cycle 7 facade inspection completed
08/19/2012
Cycle 7 facade report signed — SAFE
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2008
Cycle 6 facade report submitted
03/18/2008
Cycle 6 facade report signed — SWARMP
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP01/27/2022
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP04/29/2021
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC04/29/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/24/2021
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP12/17/2020
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC12/03/2020
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC09/15/2020
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP09/03/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC07/20/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC04/01/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/21/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC10/28/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/21/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/31/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/15/2018
BISOTISSUEDAMERICAN SOLAR PARTNERS,01/02/2021
BISOTISSUEDPLANET CONSTRUCTION & DE*06/11/2020
BISOTISSUEDPLANET CONSTRUCTION & DE*01/26/2020
BISOTISSUEDPLANET CONSTRUCTION & DE*10/05/2015
BISOTISSUEDPLANET CONSTRUCTION & DE*10/21/2011
BISEQISSUEDEVEREST SCAFFOLDING INC10/11/2011
BISPLISSUEDSKINNER PLBG & HTG CORP06/08/2007
BISOTISSUEDKING SHA GROUP INC03/19/2003
BISEQISSUEDKING SHA GROUP INC03/19/2003
BISOTISSUEDG.M. CONSTRUCTION & WATERPROOF01/27/2003
BISOTISSUEDKING SHA GROUP INC12/18/2002
BISEQISSUEDKING SHA GROUP INC12/18/2002
BISOTISSUEDROHER CONSTRUCTION SRV INC10/17/2001
BISEQISSUEDAMERICAN SERVICES CORPCTION10/10/2001
BISOTISSUEDROHER CONSTRUCTION SRV INC08/10/2000
BISEQISSUEDGHOTRA GNRL CONST.01/21/2000
BISEQISSUEDGHOTRA GENERAL CONSTRUCTION01/20/2000
BISBLISSUEDA & C COMBSTN.SERVICES02/12/1999
BISBLISSUEDMARK MECHANICAL09/22/1993
4 projects · most recent 11/02/2023
Boiler Controls
FiledStatusContractorScope
11/02/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
03/11/2022CompleteHAUGLAND ENERGY GROUP LLC—
11/13/2020CompleteROME ELECTRICAL CONTS INCBoiler Controls
03/14/2018CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/08/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
10/01/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
09/03/2020Maintenance informationLOUIS ARENAenergy_progress
09/03/2020HVAC and service water heating equipment LOUIS ARENAenergy_progress
09/03/2020Heating SystemsLOUIS ARENAspecial
09/03/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
07/16/2020FinalSunil Saigalprogress
10/31/2019FinalBRIAN T. O'CONNORprogress
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00252688-I1Request digital key ↗
09/04/2026M00371752-I1Request digital key ↗
08/15/2026M00252688-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00387405-I1Request digital key ↗
08/15/2026M00387405-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/06/2026M00026867-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00387405-S1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
04/05/2023123742904Open ↗
12/24/2020140993370Open ↗
02/14/2020122525437Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
01/02/2021140993370Open ↗
11/08/2019123742904Open ↗
10/20/2015122525437Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/06/2026M00026867-I1Open ↗
09/05/2026M00252688-P1Open ↗
09/05/2026M00252688-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/14/2020122525437Open ↗
11/12/2019123742904Open ↗
02/02/2016122525437Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026M00371752-I1Open ↗
08/31/2026M00387405-S1Open ↗
08/31/2026M00387405-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/24/2020140993370Open ↗
11/12/2019123742904Open ↗
09/23/2015122525437Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M00387405-I1Open ↗
08/31/2026M00387405-S1Open ↗
08/23/2026M00387405-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/12/2019123742904Open ↗
09/23/2015122525437Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/24/2020140993370Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/24/2020140993370Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan6
09/04/2026M00371752-I1Open ↗
09/04/2026M00387405-S1Open ↗
08/13/2026M00387405-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes1
11/12/2019123742904Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/25/2022140993370Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/23/2015122525437Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/12/2019123742904Open ↗
09/23/2015122525437Open ↗
06/20/2011120728187Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/04/2026M00387405-S1Open ↗
09/04/2026M00387405-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/20/2011120728187Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/02/2021140993370Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/20/2022140993370Open ↗
01/02/2021140993370Open ↗
12/24/2020140993370Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/12/2019123742904Open ↗
09/23/2015122525437Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/01/2024123742904Open ↗
09/20/2022140993370Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/24/2020140993370Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/24/2020140993370Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
09/20/2022140993370Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/01/2024123742904Open ↗
▸BISTECHNICAL REPORT: ENERGY1
06/20/2011120728187Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/04/2026M00387405-S1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/20/2022140993370Open ↗
09/20/2022140993370Open ↗
01/02/2021140993370Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/01/2024123742904Open ↗
▸BISMASONRY1
05/01/2024123742904Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/01/2024123742904Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/01/2024123742904Open ↗
10/05/2022140993370Open ↗
▸BISFINAL1
05/01/2024123742904Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/20/2011120728187Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/05/2022140993370Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/04/2026M00371752-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
12/24/2020140993370Open ↗
11/12/2019123742904Open ↗
09/23/2015122525437Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/01/2024123742904Open ↗
09/20/2022140993370Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
11/12/2019123742904Open ↗
09/23/2015122525437Open ↗
06/20/2011120728187Open ↗
▸BISeFiling Job Application Cover Sheet2
08/11/2011120728187Open ↗
12/24/2020140993370Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/05/2022140993370Open ↗