HPD05/08/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD08/20/2024§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHTING FIXTURE AT CEILING IN THE BATHROOM LOCATED AT BSMT-APT 1, 1st BSMT-APT FROM NORTH AT EAST
HPD08/20/2024§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT BSMT-APT 1, 1st BSMT-APT FROM NORTH AT EAST
HPD08/20/2024§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT BSMT-APT 1, 1st BSMT-APT FROM NORTH AT EAST
HPD08/20/2024§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT BSMT-APT 1, 1st BSMT-APT FROM NORTH AT EAST
HPD08/20/2024§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAT 35SQ FT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT BSMT-APT 1, 1st BSMT-APT FROM NORTH AT EAST
HPD06/01/2013SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... 20 SQ.FT AT ALL WALLS AND CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY
HPD06/01/2013SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL / BUZZER / INTERCOM IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY