HPD06/07/2023§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, PRESUMED LEAD PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD06/07/2023§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 3FL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD04/02/2021§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
HPD04/02/2021§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
Three families · 2,000 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.