368 SLEIGHT AVENUE
STATEN ISLAND · BIN 5088080
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R1-2Zoning
2,494 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 8,550 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 1 filing · 20 docs
Attic2p · 1 filing · 4 docs
Floor 27p · 3 filings · 20 docs
Floor 1Construction fence installation8p · 5 filings · 20 docs
Basement5p · 2 filings · 20 docs
Sub-Basement2p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stanley M. Krebushevski, R.A311/01/2022
William Montague Engineering308/30/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Oak DevelopersScaffold907/08/2026
Oak DevelopersGeneral Contractor707/08/2026
JB Buzco PlumbingPlumbing307/08/2026
Quality PlumbingPlumbing107/08/2026
Rightway Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677311/01/2022
Building Lifecycle
05/11/2023
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
S00509020-I1-GC-CX
11/10/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
11/10/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
11/10/2022
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM MONTAGUE
11/10/2022
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
70 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offOak Developers09/28/2022
DOB NOWPlumbingSigned-offJB Buzco Plumbing09/27/2022
DOB NOWSprinklersSigned-offRightway Plumbing & Heating09/06/2022
DOB NOWPlumbingSigned-offJB Buzco Plumbing08/26/2022
DOB NOWConstruction FenceSigned-offOak Developers05/11/2022
DOB NOWMechanical SystemsPermit IssuedOak Developers05/11/2022
DOB NOWPlumbingSigned-offQuality Plumbing10/20/2021
DOB NOWFoundationPermit IssuedOak Developers09/27/2021
DOB NOWConstruction FenceSigned-offOak Developers09/27/2021
DOB NOWPlumbingSigned-offJB Buzco Plumbing09/13/2021
DOB NOWFoundationPermit IssuedOak Developers08/25/2021
DOB NOWConstruction FenceSigned-offOak Developers08/03/2021
DOB NOWConstruction FenceSigned-offOak Developers05/24/2021
DOB NOWConstruction FenceSigned-offOak Developers04/15/2021
BISOTISSUEDSunrun Installation Service08/26/2022
1 project · most recent 11/01/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
11/01/2022Permit IssuedOak DevelopersAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 11/01/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/01/2022Signed-offJB Buzco PlumbingGas, Storm, Water/Sanitary
2 projects · most recent 10/24/2022
General Wiring
FiledStatusContractorScope
10/24/2022CompleteRidge ElectricGeneral Wiring
08/29/2022CompleteSunrun Solar Electl—
1 project · most recent 11/01/2022
Wood
FiledStatusContractorScope
11/01/2022Signed-offJB Buzco PlumbingWood
1 project · most recent 11/01/2022
Earthwork
FiledStatusContractorScope
11/01/2022Signed-offJB Buzco PlumbingEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/31/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
10/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/27/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/25/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/24/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
11/10/2022Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
11/10/2022Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
11/10/2022Structural Steel - High Strength BoltingWILLIAM MONTAGUEspecial
11/10/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
11/10/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
11/10/2022Mechanical SystemsWILLIAM MONTAGUEspecial
11/10/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
11/10/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
11/10/2022FinalWILLIAM MONTAGUEprogress
11/10/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
11/10/2022Footing and FoundationWILLIAM MONTAGUEprogress
11/10/2022Structural Wood FrameWILLIAM MONTAGUEprogress
11/10/2022Permanent certificateWILLIAM MONTAGUEenergy_progress
11/10/2022Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
11/10/2022Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
11/10/2022Fenestration areasWILLIAM MONTAGUEenergy_progress
11/10/2022HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
11/10/2022Interior lighting powerWILLIAM MONTAGUEenergy_progress
11/10/2022Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
11/10/2022HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
11/10/2022Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
11/10/2022MeteringWILLIAM MONTAGUEenergy_progress
11/10/2022HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
11/10/2022Maintenance informationWILLIAM MONTAGUEenergy_progress
11/10/2022Air barrier — testing WILLIAM MONTAGUEenergy_progress
Latest 25 of 57.