368 WEST 23RD STREET
MANHATTAN · BIN 1013375
💬 Discuss this project
1900Year Built
5Stories
D4Building Class
C1-6AZoning
10,426 sfGross Floor Area
9Units
Rent Stabilized0 Active Violations 16 likely answered ▸
Elevator cooperative · Owner of record: 368 West 23rd St Apts · 2,141 sf lot · 4.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof368 West 23rd ST. Apts., INC.Under Construction7p · 3 filings · 20 docs
PenthouseUnit PHUnder Construction6p · 3 filings · 20 docs
Floor 5Unit 5FUnder Construction60p · 4 filings · 20 docs
Floor 4
Floor 3
Floor 2368 West 23rd ST. Apts., INC.1 filing · 2 docs
Floor 1368 West 23rd ST. Apts., INC.1 filing · 2 docs
Cellar368 West 23rd ST. Apts., INC.Under Construction5p · 1 filing · 20 docs
Site & exterior368 West 23rd ST. Apts., INC.63p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
368 West 23rd St Apts8407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bertolini Architectural Works505/18/2026
New York & Company306/27/2025
Rigid Structural Design512/09/2024
Piro Studio106/03/2024
D2A Studio305/31/2024
McSweeney Engineering109/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design803/21/2026
New York & Company603/21/2026
D2A Studio603/21/2026
Bertolini Architectural Works603/21/2026
Tom Ennis Associates403/21/2026
KM Associates of New York103/21/2026
K & M Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nova Construction ServiceScaffold1604/09/2026
Arch ScaffoldScaffold704/09/2026
Cegf & G PlumbingPlumbing410/04/2026
Nova Construction ServiceGeneral Contractor204/09/2026
R&F Park ConstructionGeneral Contractor104/09/2026
L J Electrical ServiceElectrical103/21/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlas ATC Engineering8011405/18/2026
Bertolini Architecutral W6488405/18/2026
New York Engineering Associates851306/27/2025
C.M. Testing Laboratory1352105/31/2024
D2A Studio3190104/07/2023
McSweeney Engineering4451109/23/2019
Building Lifecycle
All (138)Filed (18)Permit Issued (18)Signed Off (5)Violation (45)Inspection (2)Objection (20)Special Inspection (30)
09/11/2026
Signed off — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, LINTEL & SILL REPLACEMENT, BALCONY RESTORATION, NEW ALUMINIUM RAILING INSTALLATION, ROOF RECOVERY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00928179-I1
06/02/2026
Special inspection requirement — Final
OSVALDO BERTOLINI
06/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
OSVALDO BERTOLINI
06/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jorge Santos
06/02/2026
Special inspection requirement — Masonry
OSVALDO BERTOLINI
06/02/2026
Special inspection requirement — Structural Steel - Details
Jorge Santos
06/02/2026
Special inspection requirement — Post-installed Anchors
OSVALDO BERTOLINI
06/02/2026
Special inspection requirement — Structural Steel - Welding
Jorge Santos
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
OSVALDO BERTOLINI
05/18/2026
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, LINTEL & SILL REPLACEMENT, BALCONY RESTORATION, NEW ALUMINIUM RAILING INSTALLATION, ROOF RECOVERY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00928179-P3
04/22/2026
Objection resolved — Open
04/22/2026
Objection resolved — Open
04/22/2026
Objection resolved — Resolved
04/22/2026
Objection resolved — Addressed
04/14/2026
Permit issued — Plumbing
M01163243-S1-PL
03/23/2026
Objection raised — Scope
03/23/2026
Objection raised — Scope
03/23/2026
Objection raised — Structural
03/21/2026
Objection raised — Scope
03/20/2026
Signed off — Alteration
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01058956-I1
03/20/2026
Signed off — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01150000-I1
03/20/2026
Signed off — Alteration
M01053239-I1
03/20/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01053220-I1
03/16/2026
Violation issued (ECB, closed)
Construction
03/16/2026
Violation issued (ECB, closed)
Construction
02/20/2026
Filed — Alteration
M01351777-I1
02/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/27/2026
Special inspection requirement — Final
12/01/2025
Permit issued — Structural
M00928179-I1-GC-CX
11/28/2025
Permit issued — Protection and Mechanical Methods
M01150000-I1-PMM
11/19/2025
Permit issued — Plumbing
M00850551-S2-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2025
Objection raised — Other
11/10/2025
Objection resolved — Addressed
10/31/2025
Permit issued — General Construction
M00850551-I1-GC
10/27/2025
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, LINTEL & SILL REPLACEMENT, BALCONY RESTORATION, NEW ALUMINIUM RAILING INSTALLATION, ROOF RECOVERY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00928179-P2
07/14/2025
Permit issued — Sidewalk Shed
M01053220-I1-SH
07/14/2025
Permit issued — Protection and Mechanical Methods
M01058956-I1-PMM
07/14/2025
Permit issued — Supported Scaffold
M01053239-I1-SF
07/02/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/27/2025
Filed — Alteration
REFILING OF APPLICATION 120157766 TO REGISTER THE DOMESTIC HOT WATER BOILER AND STORAGE TANK.
M01163243-S1
06/27/2025
Permit issued — Boiler Equipment
M01163243-I1-BE
06/24/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/09/2025
Permit issued — Boiler Equipment
M01163243-S2-BE
04/11/2025
Filed — Alteration
REFILING OF APPLICATION 120157766 TO REGISTER THE DOMESTIC HOT WATER BOILER AND STORAGE TANK.
M01163243-I1
04/11/2025
Filed — Alteration
REFILING OF APPLICATION 120157766 TO REGISTER THE DOMESTIC HOT WATER BOILER AND STORAGE TANK.
M01163243-S2
03/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/28/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
03/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
03/28/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
03/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/17/2025
Violation issued (ECB, closed)
Construction
01/07/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
01/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
01/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
01/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/06/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCegf & G Plumbing04/14/2026
DOB NOWStructuralSigned-offNova Construction Service12/01/2025
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service11/28/2025
DOB NOWPlumbingPermit IssuedAMC Plumbing, Heating & CLNG11/19/2025
DOB NOWGeneral ConstructionPermit IssuedR&F Park Construction10/31/2025
DOB NOWSidewalk ShedSigned-offNova Construction Service07/14/2025
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service07/14/2025
DOB NOWSupported ScaffoldSigned-offNova Construction Service07/14/2025
DOB NOWBoiler EquipmentSigned-offBell Construction Service06/27/2025
DOB NOWBoiler EquipmentSigned-offBell Construction Service06/09/2025
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service12/09/2024
DOB NOWGeneral ConstructionSigned-offNova Construction Service11/07/2024
DOB NOWSupported ScaffoldSigned-offNova Construction Service07/31/2024
DOB NOWProtection and Mechanical MethodsSigned-offNova Construction Service07/31/2024
DOB NOWSidewalk ShedSigned-offNova Construction Service07/31/2024
DOB NOWSupported ScaffoldSigned-offArch Scaffold06/13/2024
DOB NOWSidewalk ShedSigned-offArch Scaffold06/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offArch Scaffold06/13/2024
BISPLISSUEDAbr Plumbing & Heating Contracting11/06/2025
BISPLISSUEDCegf & G Plumbing08/08/2024
BISPLISSUEDCegf & G Plumbing12/07/2019
BISPLISSUEDCegf & G Plumbing12/07/2019
BISBLISSUEDCegf & G Plumbing12/07/2019
BISBLISSUEDCegf & G Plumbing12/08/2018
BISPLISSUEDCegf & G Plumbing12/08/2018
BISPLISSUEDCegf & G Plumbing12/06/2018
BISOTISSUEDGim Construction09/10/2018
BISPLISSUEDCegf & G Plumbing12/02/2017
BISPLISSUEDCegf & G Plumbing12/02/2017
BISBLISSUEDCegf & G Plumbing12/02/2017
BISPLISSUEDCegf & G Plumbing12/02/2017
BISBLISSUEDCegf & G Plumbing12/06/2016
BISPLISSUEDCegf & G Plumbing11/28/2016
BISPLISSUEDCegf & G Plumbing05/12/2016
BISPLISSUEDOrion Plumbing & Heating03/24/2016
BISOTISSUEDGim Construction03/16/2016
BISBLISSUEDCegf & G Plumbing02/26/2016
BISPLISSUEDCegf & G Plumbing02/26/2016
BISBLISSUEDCegf & G Plumbing03/14/2015
BISBLISSUEDCegf & G Plumbing10/10/2014
+ 21 more permits on file
3 projects · most recent 06/27/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/27/2025Permit IssuedBell Construction ServiceGas, Water/Sanitary
06/03/2024Permit IssuedAction & A1 Plumbing and Heating CoWater/Sanitary
09/23/2019——Gas, Storm, Water/Sanitary
2 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedL J Electrical ServiceGeneral Wiring
07/31/2024CompleteTop Shelf Electric—
1 project · most recent 05/18/2026
Steel Wood
FiledStatusContractorScope
05/18/2026Signed-offNova Construction ServiceSteel, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/02/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
06/02/2026FinalOSVALDO BERTOLINIprogress
06/02/2026Tenant Protection Plan ComplianceOSVALDO BERTOLINIspecial
06/02/2026Structural Stability – Alterations of existing buildingsJorge Santosspecial
06/02/2026MasonryOSVALDO BERTOLINIspecial
06/02/2026Structural Steel - DetailsJorge Santosspecial
06/02/2026Post-installed AnchorsOSVALDO BERTOLINIspecial
06/02/2026Structural Steel - WeldingJorge Santosspecial
06/02/2026Energy Code Compliance InspectionsOSVALDO BERTOLINIprogress
02/11/2026Tenant Protection Plan Compliance—special
01/27/2026Final—progress
03/28/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/28/2025Heating SystemsLOUIS ARENAspecial
03/28/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
03/28/2025Maintenance informationLOUIS ARENAenergy_progress
03/28/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
03/28/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/07/2025Maintenance informationLOUIS ARENAenergy_progress
01/07/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
01/07/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/07/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/07/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/06/2025Heating SystemsLOUIS ARENAspecial
01/06/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
01/06/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/06/2025Maintenance informationLOUIS ARENAenergy_progress
Latest 25 of 47.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch16
08/27/2026M00850551-S1Request digital key ↗
08/27/2026M00850551-I1Request digital key ↗
08/27/2026M00850551-S2Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00231740-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00231743-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION23
03/05/2026103730973Open ↗
02/26/2026103730973Open ↗
10/28/2025103730973Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION16
11/06/2025103730973Open ↗
08/08/2024122944350Open ↗
07/09/2024122944350Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
09/16/2019140858588Open ↗
09/16/2019140858588Open ↗
▸Seals & Professional Certifications66
▸DOB NOWProgress Inspector Seal & Signature18
09/29/2026M01163243-S1Open ↗
09/29/2026M01163243-S1Open ↗
09/29/2026M01163243-S1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/27/2026M00850551-S1Open ↗
08/27/2026M00850551-I1Open ↗
08/27/2026M00850551-S2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/29/2026M01163243-S1Open ↗
09/27/2026M00928179-P1Open ↗
09/27/2026M00928179-P1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
09/19/2018123478058Open ↗
08/21/2018123478058Open ↗
07/30/2018123478058Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
11/25/2019140858588Open ↗
10/30/2019140858588Open ↗
07/16/2019140858588Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/17/2009120157766Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/17/2009120157766Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING5
03/05/2026103730973Open ↗
07/16/2019140858588Open ↗
12/23/2010120084988Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
11/14/2016122944350Open ↗
06/02/2016122692041Open ↗
06/02/2016122692041Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
02/15/2011120084988Open ↗
02/02/2011120084988Open ↗
11/26/2010120084988Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/17/2009120157766Open ↗
▸Safety & Tenant Protection25
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist14
08/17/2026M00928179-P3Open ↗
08/13/2026M01053239-I1Open ↗
08/13/2026M01150000-I1Open ↗
Showing 3 of 14 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST5
07/16/2019140858588Open ↗
08/21/2018123478058Open ↗
11/14/2016122944350Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes4
07/16/2019140858588Open ↗
08/21/2018123478058Open ↗
07/30/2018123478058Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
08/05/2009120084988Open ↗
06/26/2009120084988Open ↗
▸Environmental & Asbestos9
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
09/17/2009120157766Open ↗
06/26/2009120084988Open ↗
06/26/2009120084988Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M00850551-I1Open ↗
08/27/2026M00850551-S1Open ↗
08/27/2026M00850551-S2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/14/2016122944350Open ↗
02/29/2016122692041Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026M00928179-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/19/2018123478058Open ↗
08/21/2018123478058Open ↗
11/14/2016122944350Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
09/19/2018123478058Open ↗
10/12/2016122692041Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/16/2019140858588Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
02/25/2026103730973Open ↗
02/13/2026103730973Open ↗
07/31/2025101155795Open ↗
Showing 3 of 5 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/31/2025101155795Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/01/2025101155795Open ↗
07/31/2025100292390Open ↗
09/19/2018123478058Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
09/17/2009120157766Open ↗
06/26/2009120084988Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/28/2025100292390Open ↗
▸BISSUPERSEDING LETTER1
11/06/2025103730973Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
11/25/2019140858588Open ↗
07/16/2019140858588Open ↗
08/31/2018123478058Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION12
06/02/2021140858588Open ↗
05/25/2021140858588Open ↗
12/03/2019140858588Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET5
07/30/2018123478058Open ↗
11/14/2016122944350Open ↗
02/29/2016122692041Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
11/06/2025103730973Open ↗
09/19/2018123478058Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/16/2019140858588Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/31/2018123478058Open ↗