← Back
BuildNYC
Primarily 5-6 family with 1 store or office
369 14TH STREET
BROOKLYN · Park Slope · BIN 3023536
💬 Discuss this project
1885Year Built
4Stories
S5Building Class
R6AZoning
6,334 sfGross Floor Area
6Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · 1,936 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMiolin Bakery7p · 1 filing · 20 docs
Floor 1Miolin Bakery22p · 1 filing · 20 docs
CellarMiolin Bakery12p · 1 filing · 20 docs
Site & exteriorMiolin Bakery16p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yorkos Engineering Design Consulting212/21/2023
Alexallen Studio Architects112/12/2023
Royal T&E206/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Danico Services403/21/2026
Anzalone Architecture603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rennon ConstructionScaffold403/21/2026
RYL GroupGeneral Contractor207/08/2026
Go Greener PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544312/21/2023
Yorkos Engineering, Desig6991212/21/2023
Building Lifecycle
All (89)Filed (5)Permit Issued (5)Signed Off (5)Violation (16)Inspection (3)Objection (32)Special Inspection (23)
04/30/2026
Violation issued (HPD, closed)
A
07/17/2025
Signed off — Alteration
B00049797-I1
07/17/2025
Signed off — Alteration
B00046074-I1
06/05/2025
Violation issued (HPD, closed)
A
03/07/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 1ST FL COMMERCIAL TENANT SPACE FOR SMALL BAKERY. INSTALL NEW SPLIT A/C SYSTEM. EXHAUST FANS, KITCHEN HOOD, GREASE DUCTWORK. INSTALL ROOFTOP KITCHEN EXHAUST FAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00955848-I1
11/06/2024
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 1ST FL COMMERCIAL TENANT SPACE FOR SMALL BAKERY. INSTALL NEW SPLIT A/C SYSTEM. EXHAUST FANS, KITCHEN HOOD, GREASE DUCTWORK. INSTALL ROOFTOP KITCHEN EXHAUST FAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00955848-S1
09/24/2024
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 1ST FL COMMERCIAL TENANT SPACE FOR SMALL BAKERY. INSTALL NEW SPLIT A/C SYSTEM. EXHAUST FANS, KITCHEN HOOD, GREASE DUCTWORK. INSTALL ROOFTOP KITCHEN EXHAUST FAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00955848-S2
08/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/03/2024
Violation issued (HPD, closed)
A
03/19/2024
Permit issued — Plumbing
B00955848-S2-PL
03/08/2024
Permit issued — Mechanical Systems
B00955848-S1-MS
03/08/2024
Permit issued — General Construction
B00955848-I1-GC
02/20/2024
Objection raised — Energy
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection raised — Energy
02/20/2024
Objection resolved — Addressed
02/20/2024
Objection raised — Energy
02/20/2024
Objection resolved — Addressed
02/12/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Addressed
01/25/2024
Objection raised — Scope
01/18/2024
Objection resolved — Addressed
01/12/2024
Objection resolved — Addressed
01/12/2024
Objection resolved — Addressed
01/08/2024
Objection resolved — Addressed
01/05/2024
Objection resolved — Addressed
01/02/2024
Objection raised — Inspections
01/02/2024
Objection raised — Scope
01/02/2024
Objection raised — Fire_Protection
01/02/2024
Objection raised — Scope
12/27/2023
Objection resolved — Addressed
12/27/2023
Objection resolved — Addressed
12/21/2023
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 1ST FL COMMERCIAL TENANT SPACE FOR SMALL BAKERY. INSTALL NEW SPLIT A/C SYSTEM. EXHAUST FANS, KITCHEN HOOD, GREASE DUCTWORK. INSTALL ROOFTOP KITCHEN EXHAUST FAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00955848-S1
12/20/2023
Objection raised — Inspections
12/20/2023
Objection resolved — Addressed
12/20/2023
Objection raised — Scope
12/20/2023
Objection resolved — Addressed
12/20/2023
Objection raised — Scope
12/20/2023
Objection raised — Admin
12/19/2023
Objection raised — Accessibility
12/19/2023
Objection raised — Structural
12/19/2023
Objection raised — Scope
12/19/2023
Objection raised — Scope
12/13/2023
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 1ST FL COMMERCIAL TENANT SPACE FOR SMALL BAKERY. INSTALL NEW SPLIT A/C SYSTEM. EXHAUST FANS, KITCHEN HOOD, GREASE DUCTWORK. INSTALL ROOFTOP KITCHEN EXHAUST FAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00955848-S2
12/12/2023
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF 1ST FL COMMERCIAL TENANT SPACE FOR SMALL BAKERY. INSTALL NEW SPLIT A/C SYSTEM. EXHAUST FANS, KITCHEN HOOD, GREASE DUCTWORK. INSTALL ROOFTOP KITCHEN EXHAUST FAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B00955848-I1
11/20/2023
Violation issued (HPD, closed)
I
11/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BALTU YORKOS
11/17/2023
Special inspection requirement — Maintenance information
BALTU YORKOS
11/17/2023
Special inspection requirement — Shutoff dampers
BALTU YORKOS
11/02/2023
Special inspection requirement — Exterior lighting power
Alexandra Burr
11/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
BALTU YORKOS
11/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
11/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
Alexandra Burr
11/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
11/02/2023
Special inspection requirement — Maintenance information
BALTU YORKOS
11/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
BALTU YORKOS
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGo Greener Plumbing03/19/2024
DOB NOWMechanical SystemsSigned-offRYL Group03/08/2024
DOB NOWGeneral ConstructionSigned-offRYL Group03/08/2024
DOB NOWSupported ScaffoldSigned-offRennon Construction06/12/2018
DOB NOWSidewalk ShedSigned-offRennon Construction05/24/2018
BISOTISSUEDBrian Holtan11/04/2020
BISMHISSUEDRoyal Air Conditioning09/18/2008
BISFPISSUEDMaster Fire Systems04/25/2007
BISOTISSUEDCentury General Contracting05/14/2001
2 projects · most recent 03/15/2024
General Wiring
FiledStatusContractorScope
03/15/2024CompleteSupreme ElectricGeneral Wiring
05/23/2018CompleteMeo Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/17/2023HVAC-R and service water piping design and insulationBALTU YORKOSenergy_progress
11/17/2023Maintenance informationBALTU YORKOSenergy_progress
11/17/2023Shutoff dampersBALTU YORKOSenergy_progress
11/02/2023Exterior lighting powerAlexandra Burrenergy_progress
11/02/2023HVAC-R and service water heating equipmentBALTU YORKOSenergy_progress
11/02/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
11/02/2023Fire-Resistance Rated ConstructionAlexandra Burrprogress
11/02/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
11/02/2023Maintenance informationBALTU YORKOSenergy_progress
11/02/2023HVAC-R and service water heating system controlsBALTU YORKOSenergy_progress
11/02/2023HVAC-R and service water piping design and insulationBALTU YORKOSenergy_progress
11/02/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
11/01/2023Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
11/01/2023Energy Code Compliance InspectionsBALTU YORKOSprogress
11/01/2023Energy Code Compliance InspectionsBALTU YORKOSprogress
11/01/2023Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
10/31/2023Mechanical SystemsBALTU YORKOSspecial
10/31/2023Interior lighting powerAlexandra Burrenergy_progress
10/31/2023FinalBALTU YORKOSprogress
10/31/2023Lighting controlsAlexandra Burrenergy_progress
10/31/2023Energy Code Compliance InspectionsAlexandra Burrprogress
10/31/2023FinalAlexandra Burrprogress
10/31/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Miolin BakeryRestaurant / Food ServiceCellar, Floor 1, Roof
Project B00955848 Alteration · LOC Issued · 12/12/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026B00046074-I1Request digital key ↗
09/03/2026B00049797-I1Request digital key ↗
08/26/2026B00955848-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION4
06/29/2023340775254Open ↗
10/29/2020340775254Open ↗
02/06/2009310125922Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026B00955848-I1Open ↗
08/13/2026B00955848-S2Open ↗
08/13/2026B00955848-S1Open ↗
▸BISWORK PERMIT APPLICATION2
11/04/2020340775254Open ↗
09/18/2008310125922Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026B00955848-I1Open ↗
09/02/2026B00955848-I1Open ↗
09/01/2026B00955848-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00955848-I1Open ↗
09/01/2026B00955848-S2Open ↗
09/01/2026B00955848-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026B00046074-I1Open ↗
09/03/2026B00049797-I1Open ↗
08/13/2026B00955848-S2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/27/2009310125922Open ↗
08/15/2008310125922Open ↗
08/06/2008310125922Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/29/2020340775254Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/29/2020340775254Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/29/2020340775254Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026B00049797-I1Open ↗
08/13/2026B00955848-I1Open ↗
08/13/2026B00955848-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/29/2020340775254Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/06/2008310125922Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/13/2023340775254Open ↗
10/29/2020340775254Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/13/2023340775254Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/13/2023340775254Open ↗
▸BISNYCECC ANALYSIS1
10/29/2020340775254Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/14/2023340775254Open ↗
▸BISFENESTRATION AIR LEAKAGE1
06/13/2023340775254Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/29/2020340775254Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/27/2023340775254Open ↗
06/13/2023340775254Open ↗
10/29/2020340775254Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
06/14/2023340775254Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
06/13/2023340775254Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
06/16/2023340775254Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/28/2023340775254Open ↗
02/27/2009310125922Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/30/2008310125922Open ↗
▸BISLANDMARKS SIGNOFF1
06/13/2023340775254Open ↗
▸BISFINAL1
06/14/2023340775254Open ↗
▸BISLANDMARKS APPROVAL1
10/29/2020340775254Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
10/29/2020340775254Open ↗
08/15/2008310125922Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/10/2023340775254Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/29/2020340775254Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
06/28/2023340775254Open ↗
10/29/2020340775254Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00046074-I1Open ↗