← Back
BuildNYC
Three families
37-02 FRANCIS LEWIS BOULEVARD
QUEENS · BIN 4618634
💬 Discuss this project
2022Year Built
—Stories
C0Building Class
R4Zoning
3,194 sfGross Floor Area
3Units
0 Active Violations
Three families · Owner of record: Construction Arts JTB · 2,405 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof15p · 2 filings · 12 docs
Penthouse17p · 2 filings · 12 docs
Floor 3Francis Lewis2p · 3 filings · 9 docs
Floor 2Francis Lewis15p · 4 filings · 16 docs
Floor 1Francis Lewis20p · 6 filings · 20 docs
CellarFrancis Lewis15p · 5 filings · 19 docs
Basement1p · 1 filing · 7 docs
Sub-BasementFrancis Lewis15p · 4 filings · 16 docs
Site & exteriorNew 2 story, 2 family dwelling units14p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Construction Arts WP5110/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNY Engineering309/18/2026
Gerald Caliendo109/20/2021
Edward C. Hicks RA205/12/2021
Sung Ho Shin Architect312/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY Engineering403/21/2026
Kataria Builders403/21/2026
Gerald J. Caliendo R.A103/21/2026
Speedy International203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
210 ConstructionGeneral Contractor1207/08/2026
210 ConstructionScaffold607/08/2026
Horbridge Plumbing & HeatingPlumbing507/08/2026
Kishan PlumbingPlumbing210/09/2026
KJK ElectricElectrical103/22/2026
BT's Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rohan Engineering2600409/18/2026
Building Lifecycle
11/04/2026
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW STRUCTURAL FRAMING FOR THE 3 FLOOR BUILDING, FILED IN CONJUNCTION WITH NB: 421672755
Q00515798-I1
10/08/2026
Permit renewed — Plumbing
Renewed without changes
Q00594856-I1-PL
09/18/2026
Filed — Alteration
INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421672755. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00594856-P1
07/28/2026
Signed off — Alteration
Q00596732-I1
02/15/2025
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
Q00813552-I1-MS
69 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKishan Plumbing10/08/2026
DOB NOWMechanical SystemsPermit Issued210 Construction09/12/2024
DOB NOWCurb CutSigned-off210 Construction09/05/2024
DOB NOWPlumbingPermit IssuedN and S Plumbing08/01/2024
DOB NOWPlumbingPermit IssuedHorbridge Plumbing & Heating10/24/2023
DOB NOWConstruction FenceSigned-off210 Construction02/08/2023
DOB NOWPlumbingPermit IssuedHorbridge Plumbing & Heating12/13/2022
DOB NOWPlumbingPermit IssuedBT's Plumbing and Heating06/10/2022
DOB NOWStructuralSigned-off210 Construction03/24/2022
DOB NOWConstruction FenceSigned-off210 Construction03/24/2022
DOB NOWStructuralSigned-off210 Construction07/30/2021
DOB NOWStructuralPermit Issued210 Construction03/03/2021
DOB NOWConstruction FenceSigned-off210 Construction03/03/2021
DOB NOWStructuralPermit Issued210 Construction12/18/2019
DOB NOWConstruction FenceSigned-off210 Construction12/11/2019
BIS—ISSUED210 Construction04/09/2024
BIS—ISSUED210 Construction04/03/2023
BIS—RE-ISSUED210 Construction03/29/2022
BIS—ISSUED210 Construction11/16/2021
BIS—ISSUEDGolden Gate Bapaz Construction07/26/2021
BIS—ISSUED210 Construction04/14/2021
1 project · most recent 03/02/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScope
03/02/2023Permit Issued210 ConstructionAir Conditioning Systems, Associated Ducts and Piping, Heating Systems
1 project · most recent 09/18/2026
FiledStatusContractorScope
09/18/2026———
1 project · most recent 09/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/18/2026Permit IssuedKishan PlumbingGas, Storm, Water/Sanitary
2 projects · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022Permit IssuedKJK ElectricGeneral Wiring
12/09/2020CompleteAtn Electric—
2 projects · most recent 05/12/2021
Steel Concrete Masonry
FiledStatusContractorScope
05/12/2021Signed-off210 ConstructionSteel, Concrete, Masonry
07/23/2019Permit Issued210 ConstructionSteel
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/01/2023Shutoff dampersBRIAN ROHANenergy_progress
01/18/2023HVAC-R and service water heating equipmentBRIAN ROHANenergy_progress
01/18/2023HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
01/18/2023Maintenance informationBRIAN ROHANenergy_progress
01/18/2023HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
01/17/2023Fire-Resistance Rated ConstructionBRIAN ROHANprogress
01/17/2023Energy Code Compliance InspectionsBRIAN ROHANprogress
01/17/2023Mechanical SystemsBRIAN ROHANspecial
01/17/2023Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
01/17/2023FinalBRIAN ROHANprogress
09/21/2021HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
09/21/2021Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
09/21/2021Energy Code Compliance InspectionsBRIAN ROHANprogress
09/21/2021HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
09/21/2021HVAC-R and service water heating equipmentBRIAN ROHANenergy_progress
09/16/2021Sprinkler SystemsBRIAN ROHANspecial
05/10/2021Structural Cold-Formed SteelBRIAN ROHANspecial
05/04/2021Concrete - Cast-In-PlaceBRIAN ROHANspecial
05/04/2021Subgrade InspectionsBRIAN ROHANspecial
05/04/2021MasonryBRIAN ROHANspecial
05/04/2021Structural Steel - DetailsBRIAN ROHANspecial
05/04/2021FinalBRIAN ROHANprogress
124 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account