Three families
37-06 FRANCIS LEWIS BOULEVARD
QUEENS · Auburndale · BIN 4618636
💬 Discuss this project
2021Year Built
3Stories
C0Building Class
R4Zoning
3,194 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: CONSTRUCTION ARTS JTB, LLC · 1,918 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof15p · 2 filings · 13 docs
Penthouse15p · 2 filings · 13 docs
Floor 37p · 1 filing · 6 docs
Floor 221p · 3 filings · 19 docs
Floor 126p · 4 filings · 20 docs
Cellar23p · 4 filings · 20 docs
Sub-Basement21p · 3 filings · 19 docs
Site & exterior15p · 2 filings · 13 docs
Filed — no permit issued3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSTRUCTION ARTS WP3507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/13/2017$1.6M—Private party → CONSTRUCTION ARTS JTB, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNY ENGINEERING P.C306/12/2025
GERALD CALIENDO ARCHITECTS109/20/2021
EDWARD C. HICKS RA205/12/2021
SUNG HO SHIN ARCHITECT, PC212/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY ENGINEERING PC603/21/2026
KATARIA BUILDERS403/21/2026
GERALD J. CALIENDO R.A., P.C.103/21/2026
SPEEDY INTERNATIONAL203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
210 CONSTRUCTION CORPGeneral Contractor1407/08/2026
KISHAN PLUMBING INCPlumbing607/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing507/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection207/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
DYNAMIC PLBNG SPRKR CORPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROHAN ENGINEERING, PC2600506/12/2025
TRIANGLE INSPECTION & TES7495105/12/2021
Building Lifecycle
All (82)Filed (8)Permit Issued (15)Signed Off (6)Violation (4)Inspection (11)Objection (17)Special Inspection (21)
04/28/2026
Signed off — Alteration
HEREWITH FILED PROPOSED 10 FEET CURB CUT INCLUDING SPLAYS ON THE WEST SIDE OF FRANCIS LEWIS BLVD. IN CONJUNCTION WITH DOB APPLICATION #421681772
Q00596917-I1
04/20/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/07/2026
Signed off — Alteration
TEMPORARY SHORING AND BRACING FOR NEW BUILDING
Q00196732-I1
04/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2026
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW STRUCTURAL FRAMING FOR THE NEW 3 FLOOR BUILDING. FILED IN CONJUNCTION WITH NB: 421681772
Q00515783-I1
03/12/2026
Signed off — Alteration
INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421681772. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00594858-I1
03/02/2026
Signed off — Alteration
INSTALL NEW HVAC SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421681772. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00813553-I1
12/19/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/01/2025
Permit issued — Sprinklers
Q00594858-I1-EW-SP
09/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/03/2025
Permit issued — Sprinklers
Q00594858-I1-PL
07/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ROHAN
06/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ROHAN
06/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ROHAN
06/24/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
06/24/2025
Special inspection requirement — Sprinkler Systems
BRIAN ROHAN
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ROHAN
06/12/2025
Filed — Alteration
INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421681772. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00594858-P1
06/10/2025
Violation issued (ECB, closed)
Zoning
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ROHAN
06/10/2025
Special inspection requirement — Sprinkler Systems
BRIAN ROHAN
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ROHAN
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ROHAN
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ROHAN
05/08/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/27/2025
Signed off — Alteration
temporary construction fence
Q00260972-I1
09/12/2024
Permit issued — Mechanical Systems
Q00813553-I1-MS
09/05/2024
Permit issued — Curb Cut
Q00596917-I1-CC
08/01/2024
Permit issued — Plumbing
Q00594858-I1-PL
08/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2023
Permit issued — Plumbing
Q00594858-I1-PL
03/02/2023
Filed — Alteration
INSTALL NEW HVAC SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421681772. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00813553-I1
03/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/18/2023
Permit issued — Plumbing
Q00594858-I1-EW-SP
12/13/2022
Permit issued — Sprinklers
Q00594858-I1-PL
07/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2022
Permit issued — Structural
Q00515783-I1-ST
06/10/2022
Permit issued — Sprinklers
Q00594858-I1-PL
09/27/2021
Objection raised — Scope
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection raised — Structural
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection raised — Inspections
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection raised — Zoning
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection raised — Admin
09/27/2021
Objection resolved — Addressed
09/27/2021
Objection raised — Inspections
09/27/2021
Objection resolved — Addressed
09/22/2021
Filed — Alteration
INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421681772. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00594858-I1
09/20/2021
Filed — Alteration
HEREWITH FILED PROPOSED 10 FEET CURB CUT INCLUDING SPLAYS ON THE WEST SIDE OF FRANCIS LEWIS BLVD. IN CONJUNCTION WITH DOB APPLICATION #421681772
Q00596917-I1
07/08/2021
Permit issued — Structural
Q00515783-I1-ST
05/26/2021
Violation issued (ECB, closed)
Construction
05/26/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL10/01/2025
DOB NOWSprinklersSigned-offN AND S PLUMBING INC09/03/2025
DOB NOWMechanical SystemsSigned-off210 CONSTRUCTION CORP09/12/2024
DOB NOWCurb CutSigned-off210 CONSTRUCTION CORP09/05/2024
DOB NOWPlumbingSigned-offN AND S PLUMBING INC08/01/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT10/24/2023
DOB NOWPlumbingSigned-offCITYWIDE PLBG, HTG &SPRKL01/18/2023
DOB NOWSprinklersSigned-offHORBRIDGE PLUMBING & HEAT12/13/2022
DOB NOWStructuralSigned-off210 CONSTRUCTION CORP06/29/2022
DOB NOWSprinklersSigned-offBT'S PLUMBING AND HEATING06/10/2022
DOB NOWStructuralSigned-off210 CONSTRUCTION CORP07/08/2021
DOB NOWConstruction FenceSigned-off210 CONSTRUCTION CORP03/03/2021
DOB NOWStructuralSigned-off210 CONSTRUCTION CORP03/02/2021
DOB NOWStructuralSigned-off210 CONSTRUCTION CORP12/18/2019
DOB NOWConstruction FenceSigned-off210 CONSTRUCTION CORP12/11/2019
BIS—ISSUED210 CONSTRUCTION CORP04/09/2024
BIS—ISSUED210 CONSTRUCTION CORP04/03/2023
BIS—RE-ISSUED210 CONSTRUCTION CORP03/29/2022
BIS—ISSUED210 CONSTRUCTION CORP11/16/2021
BIS—ISSUEDGOLDEN GATE BAPAZ CONSTRU07/26/2021
BIS—ISSUED210 CONSTRUCTION CORP04/14/2021
1 project · most recent 03/04/2021
FiledStatusContractorScope
03/04/2021———
1 project · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/20/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/24/2025HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
06/24/2025HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
06/24/2025HVAC-R and service water heating equipmentBRIAN ROHANenergy_progress
06/24/2025Energy Code Compliance InspectionsBRIAN ROHANprogress
06/24/2025Sprinkler SystemsBRIAN ROHANspecial
06/24/2025Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
06/10/2025Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
06/10/2025Sprinkler SystemsBRIAN ROHANspecial
06/10/2025Energy Code Compliance InspectionsBRIAN ROHANprogress
06/10/2025HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
06/10/2025HVAC-R and service water heating equipmentBRIAN ROHANenergy_progress
06/10/2025HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
05/04/2021Concrete - Cast-In-PlaceBRIAN ROHANspecial
05/04/2021FinalBRIAN ROHANprogress
05/04/2021Structural Steel - DetailsBRIAN ROHANspecial
05/04/2021Subsurface Conditions – Fill Placement & In-Place DensityBRIAN ROHANspecial
05/04/2021Subgrade InspectionsBRIAN ROHANspecial
05/04/2021Structural Steel - WeldingRajasekhar Sakhamurispecial
05/04/2021Structural Steel - High Strength BoltingBRIAN ROHANspecial
05/04/2021MasonryBRIAN ROHANspecial
09/24/2020Sprinkler Systems—special
▾Documents — 170 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
08/27/2026Q00515783-I1Request digital key ↗
08/27/2026Q00594858-I1Request digital key ↗
08/27/2026Q00594858-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/28/2026Q00196732-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00260972-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026Q00403906-I1Request digital key ↗
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION26
04/22/2025421681772Open ↗
01/27/2023421681772Open ↗
12/25/2022421681772Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION10
06/17/2025421681772Open ↗
07/14/2023421681772Open ↗
06/27/2023421681772Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/14/2021421681772Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/02/2020421891983Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISRESTRICTION: RESTRICTIVE DECLARATION3
11/01/2019421681772Open ↗
11/01/2019421681772Open ↗
11/01/2019421681772Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
09/30/2021440689042Open ↗
10/15/2020421681772Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
03/02/2020421891983Open ↗
11/01/2019421681772Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/28/2020421681772Open ↗
▸BISZONING DIAGRAM1
10/28/2020421681772Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/28/2020421681772Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026Q00196732-I1Open ↗
08/28/2026Q00260972-I1Open ↗
08/27/2026Q00403906-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026Q00594858-P1Open ↗
08/31/2026Q00594858-P1Open ↗
08/28/2026Q00515783-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q00594858-P1Open ↗
08/28/2026Q00515783-I1Open ↗
08/28/2026Q00515783-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/01/2019421681772Open ↗
11/01/2019421681772Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/30/2021440689042Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2021440689042Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING4
10/15/2020421681772Open ↗
10/08/2020421681772Open ↗
10/01/2020421681772Open ↗
Showing 3 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/31/2025421681772Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/31/2025421681772Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/14/2019421681772Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/31/2025421681772Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/31/2025421681772Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST3
09/30/2021440689042Open ↗
03/02/2020421681772Open ↗
11/01/2019421681772Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/01/2022421681772Open ↗
04/14/2021421681772Open ↗
01/12/2021421681772Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
10/31/2025421681772Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/31/2025421681772Open ↗
▸BISFENESTRATION AREAS1
10/31/2025421681772Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/31/2025421681772Open ↗
▸BISLIGHTING IN DWELLING UNITS1
10/31/2025421681772Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/31/2025421681772Open ↗
▸BISLIGHTING CONTROLS1
10/31/2025421681772Open ↗
▸BIS* HVAC INSULATION AND SEALING1
10/31/2025421681772Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/10/2019421681772Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/31/2025421681772Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
10/31/2025421681772Open ↗
▸BISEXTERIOR LIGHTING POWER1
10/31/2025421681772Open ↗
▸BISFENESTRATION AIR LEAKAGE1
10/31/2025421681772Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00594858-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/02/2022421681772Open ↗
08/01/2022421681772Open ↗
04/14/2021421681772Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/31/2025421681772Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/31/2025421681772Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/31/2025421681772Open ↗
▸BISMASONRY1
10/31/2025421681772Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
10/31/2025421681772Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/01/2019421681772Open ↗
▸BISMECHANICAL SYSTEMS1
10/31/2025421681772Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSCHEDULE A - OCCUPANCY / USE9
10/22/2020421681772Open ↗
10/09/2020421681772Open ↗
10/01/2020421681772Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/27/2021421681772Open ↗
04/14/2021421681772Open ↗
10/28/2020421681772Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/18/2025421681772Open ↗
06/27/2023421681772Open ↗
05/24/2022421681772Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
04/14/2021421681772Open ↗
▸Filing & Intake Forms16
▸BISBOROUGH INTAKE FORM6
09/24/2025421681772Open ↗
07/14/2023421681772Open ↗
06/27/2023421681772Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
05/08/2025421681772Open ↗
08/30/2022421681772Open ↗
01/21/2022421681772Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
09/30/2021440689042Open ↗
03/02/2020421891983Open ↗
▸BISEFILING COVER SHEET1
07/29/2019421891983Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/30/2021440689042Open ↗
▸Other Documents11
▸BISPLOT DIAGRAM3
10/15/2020421681772Open ↗
10/08/2020421681772Open ↗
09/09/2019421681772Open ↗
▸BISSHUTOFF DAMPERS1
10/31/2025421681772Open ↗
▸BISMAINTENANCE INFORMATION1
10/31/2025421681772Open ↗
▸BISPERMANENT CERTIFICATE1
10/31/2025421681772Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
10/31/2025421681772Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/30/2021440689042Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
10/31/2025421681772Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
11/01/2019421681772Open ↗
▸BISPRELIMINARY1
10/31/2025421681772Open ↗