← Back
BuildNYC
Three families
37-06 FRANCIS LEWIS BOULEVARD
QUEENS · BIN 4618636
💬 Discuss this project
2021Year Built
3Stories
C0Building Class
R4Zoning
3,194 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Three families · Owner of record: Construction Arts JTB · 1,918 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew 3 floor building structural framing16p · 3 filings · 19 docs
Penthouse15p · 2 filings · 13 docs
Floor 3New 3 floor building structural framing4p · 1 filing · 6 docs
Floor 2New 3 floor building structural framing18p · 3 filings · 19 docs
Floor 1New 3 floor building structural framing23p · 4 filings · 20 docs
CellarNew 3 floor building structural framing20p · 4 filings · 20 docs
BasementNew 3 floor building structural framing2p · 2 filings · 17 docs
Sub-BasementNew 3 floor building structural framing18p · 3 filings · 19 docs
Site & exteriorNew 2 Story, 2 Family Building15p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Construction Arts WP5307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/13/2017$1.6M—Private party → CONSTRUCTION ARTS JTB, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNY Engineering306/12/2025
Gerald Caliendo Architects109/20/2021
Edward C. Hicks RA205/12/2021
Sung Ho Shin Architect212/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY Engineering603/21/2026
Kataria Builders403/21/2026
Gerald J. Caliendo R.A103/21/2026
Speedy International203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
210 ConstructionGeneral Contractor1004/09/2026
Kishan PlumbingPlumbing607/08/2026
Horbridge Plumbing & HeatingPlumbing507/08/2026
210 ConstructionScaffold407/08/2026
Dynamic Plumbing & SprinklerFire Protection207/08/2026
BT's Plumbing and HeatingPlumbing107/08/2026
Dynamic Plumbing SprinklerPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rohan Engineering2600506/12/2025
Triangle Inspection & Tes7495105/12/2021
Building Lifecycle
04/28/2026
Signed off — Alteration
HEREWITH FILED PROPOSED 10 FEET CURB CUT INCLUDING SPLAYS ON THE WEST SIDE OF FRANCIS LEWIS BLVD. IN CONJUNCTION WITH DOB APPLICATION #421681772
Q00596917-I1
04/20/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/07/2026
Signed off — Alteration
TEMPORARY SHORING AND BRACING FOR NEW BUILDING
Q00196732-I1
03/17/2026
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW STRUCTURAL FRAMING FOR THE NEW 3 FLOOR BUILDING. FILED IN CONJUNCTION WITH NB: 421681772
Q00515783-I1
03/12/2026
Signed off — Alteration
INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW BUILDING IN CONJUNCTION WITH NB JOB#421681772. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00594858-I1
74 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler10/01/2025
DOB NOWPlumbingSigned-offN and S Plumbing09/03/2025
DOB NOWMechanical SystemsSigned-off210 Construction09/12/2024
DOB NOWCurb CutSigned-off210 Construction09/05/2024
DOB NOWPlumbingSigned-offN and S Plumbing08/01/2024
DOB NOWPlumbingSigned-offHorbridge Plumbing & Heating10/24/2023
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler01/18/2023
DOB NOWPlumbingSigned-offHorbridge Plumbing & Heating12/13/2022
DOB NOWStructuralSigned-off210 Construction06/29/2022
DOB NOWPlumbingSigned-offBT's Plumbing and Heating06/10/2022
DOB NOWStructuralSigned-off210 Construction07/08/2021
DOB NOWConstruction FenceSigned-off210 Construction03/03/2021
DOB NOWStructuralSigned-off210 Construction03/02/2021
DOB NOWStructuralSigned-off210 Construction12/18/2019
DOB NOWConstruction FenceSigned-off210 Construction12/11/2019
BIS—ISSUED210 Construction04/09/2024
BIS—ISSUED210 Construction04/03/2023
BIS—RE-ISSUED210 Construction03/29/2022
BIS—ISSUED210 Construction11/16/2021
BIS—ISSUEDGolden Gate Bapaz Construction07/26/2021
BIS—ISSUED210 Construction04/14/2021
BIS—ISSUEDSano Wrecking03/14/2018
BIS—ISSUEDSano Wrecking03/14/2018
1 project · most recent 03/04/2021
FiledStatusContractorScope
03/04/2021———
1 project · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/20/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/19/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/24/2025Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
06/24/2025HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
06/24/2025HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
06/24/2025HVAC-R and service water heating equipmentBRIAN ROHANenergy_progress
06/24/2025Energy Code Compliance InspectionsBRIAN ROHANprogress
06/24/2025Sprinkler SystemsBRIAN ROHANspecial
06/10/2025HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
06/10/2025Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
06/10/2025Sprinkler SystemsBRIAN ROHANspecial
06/10/2025Energy Code Compliance InspectionsBRIAN ROHANprogress
06/10/2025HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
06/10/2025HVAC-R and service water heating equipmentBRIAN ROHANenergy_progress
05/04/2021Structural Steel - WeldingRajasekhar Sakhamurispecial
05/04/2021MasonryBRIAN ROHANspecial
05/04/2021Concrete - Cast-In-PlaceBRIAN ROHANspecial
05/04/2021Structural Steel - High Strength BoltingBRIAN ROHANspecial
05/04/2021Structural Steel - DetailsBRIAN ROHANspecial
05/04/2021FinalBRIAN ROHANprogress
05/04/2021Subsurface Conditions – Fill Placement & In-Place DensityBRIAN ROHANspecial
05/04/2021Subgrade InspectionsBRIAN ROHANspecial
09/24/2020Sprinkler Systems—special
196 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account