← Back
BuildNYC
Three families
37-08 FRANCIS LEWIS BOULEVARD
QUEENS · BIN 4618843
💬 Discuss this project
2021Year Built
3Stories
C0Building Class
R4Zoning
3,194 sfGross Floor Area
3Units
1 Active Violation ▸
Three families · Owner of record: Construction Arts JTB · 1,991 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew sprinkler and plumbing system15p · 3 filings · 19 docs
PenthouseNew sprinkler and plumbing system15p · 2 filings · 12 docs
Floor 3New structural framing for building4p · 2 filings · 9 docs
Floor 2New sprinkler and plumbing system17p · 4 filings · 20 docs
Floor 1New sprinkler and plumbing system22p · 5 filings · 20 docs
CellarNew sprinkler and plumbing system20p · 5 filings · 20 docs
BasementNew structural framing for building1p · 1 filing · 7 docs
Sub-BasementNew sprinkler and plumbing system17p · 4 filings · 20 docs
Site & exteriorNew sprinkler and plumbing system14p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Construction Arts WP5507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2017$1.1M—Private party → CONSTRUCTION ARTS JTB LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNY Engineering203/02/2023
Gerald Caliendo Architects109/20/2021
Edward C. Hicks RA205/12/2021
Sung Ho Shin Architect212/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY Engineering403/21/2026
Kataria Builders403/21/2026
Gerald J. Caliendo R.A103/21/2026
Speedy International203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
210 ConstructionGeneral Contractor1607/08/2026
210 ConstructionScaffold603/21/2026
Horbridge Plumbing & HeatingPlumbing607/08/2026
Dynamic Plumbing & SprinklerFire Protection107/08/2026
KJK ElectricElectrical103/21/2026
Kishan PlumbingPlumbing107/08/2026
KJK ElectricElectrical103/21/2026
BT's Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rohan Engineering2600403/02/2023
Triangle Inspection & Tes7495105/12/2021
Building Lifecycle
07/28/2026
Signed off — Alteration
HEREWITH FILED PROPOSED 10 FEET CURB CUT INCLUDING SPLAYS ON THE WEST SIDE OF FRANCIS LEWIS BLVD. IN CONJUNCTION WITH DOB APPLICATION #421680997
Q00596969-I1
08/02/2025
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
Q00594859-I1-PL
06/10/2025
Observed at exposure #1 planting area has been removed and replaced with newly installed impervious concrete surface. Property is located on R4…
ECB violation · closed
02/27/2025
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE
Q00260981-I1
02/15/2025
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
Q00814288-I1-MS
65 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit Issued210 Construction09/12/2024
DOB NOWCurb CutSigned-off210 Construction09/05/2024
DOB NOWPlumbingPermit IssuedN and S Plumbing08/02/2024
DOB NOWPlumbingPermit IssuedHorbridge Plumbing & Heating10/24/2023
DOB NOWSprinklersPermit IssuedCitywide Plumbing, Heating & Sprinkler01/19/2023
DOB NOWPlumbingPermit IssuedHorbridge Plumbing & Heating12/13/2022
DOB NOWStructuralPermit Issued210 Construction06/29/2022
DOB NOWPlumbingPermit IssuedBT's Plumbing and Heating06/10/2022
DOB NOWStructuralPermit Issued210 Construction07/08/2021
DOB NOWConstruction FenceSigned-off210 Construction03/03/2021
DOB NOWStructuralPermit Issued210 Construction03/03/2021
DOB NOWStructuralPermit Issued210 Construction12/18/2019
DOB NOWConstruction FenceSigned-off210 Construction12/11/2019
BIS—ISSUED210 Construction04/09/2024
BIS—ISSUED210 Construction04/19/2023
BIS—ISSUED210 Construction04/03/2023
BIS—RE-ISSUED210 Construction03/29/2022
BIS—ISSUED210 Construction11/16/2021
BIS—ISSUEDGolden Gate Bapaz Construction06/21/2021
BIS—ISSUED210 Construction04/14/2021
BISEQISSUED210 Construction08/14/2018
BIS—ISSUEDSano Wrecking03/14/2018
BISEQISSUED210 Construction08/09/2017
BISEQISSUED210 Construction08/09/2017
1 project · most recent 03/02/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScope
03/02/2023Permit Issued210 ConstructionAir Conditioning Systems, Associated Ducts and Piping, Heating Systems
2 projects · most recent 09/22/2021
FiledStatusContractorScope
09/22/2021Permit IssuedDynamic Plumbing & Sprinkler—
03/04/2021———
1 project · most recent 09/22/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/22/2021Permit IssuedKishan PlumbingGas, Storm, Water/Sanitary
1 project · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022Permit IssuedKJK ElectricGeneral Wiring
2 projects · most recent 05/12/2021
Steel Concrete
FiledStatusContractorScope
05/12/2021Permit Issued210 ConstructionSteel, Concrete
07/23/2019Permit Issued210 ConstructionSteel
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
03/01/2023Shutoff dampersBRIAN ROHANenergy_progress
01/18/2023Mechanical SystemsBRIAN ROHANspecial
01/18/2023Fire-Resistant Penetrations and JointsBRIAN ROHANspecial
01/18/2023FinalBRIAN ROHANprogress
01/18/2023Energy Code Compliance InspectionsBRIAN ROHANprogress
01/18/2023Maintenance informationBRIAN ROHANenergy_progress
01/18/2023HVAC-R and service water heating equipmentBRIAN ROHANenergy_progress
01/18/2023HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
01/18/2023HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
01/18/2023Fire-Resistance Rated ConstructionBRIAN ROHANprogress
05/04/2021FinalBRIAN ROHANprogress
05/04/2021Concrete - Cast-In-PlaceBRIAN ROHANspecial
05/04/2021MasonryBRIAN ROHANspecial
05/04/2021Structural Steel - High Strength BoltingBRIAN ROHANspecial
05/04/2021Structural Steel - WeldingRajasekhar Sakhamurispecial
05/04/2021Subgrade InspectionsBRIAN ROHANspecial
05/04/2021Subsurface Conditions – Fill Placement & In-Place DensityBRIAN ROHANspecial
05/04/2021Structural Steel - DetailsBRIAN ROHANspecial
09/24/2020Sprinkler Systems—special
07/19/2019Structural Steel - DetailsBRIAN ROHANspecial
07/19/2019FinalSUNG HO SHINprogress
200 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account