← Back
BuildNYC
Limited service hotel, often national chain
37-10 10TH STREET
QUEENS · BIN 4004370
💬 Discuss this project
2019Year Built
15Stories
H3Building Class
M1-3Zoning
113,418 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Active Violations
Limited service hotel, often national chain · Owner of record: BR 10th Street Partners · 20,000 sf lot · 5.67 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRegister two Laars boilers and gas piping3p · 1 filing · 4 docs
BulkheadRegister two Laars boilers and gas piping1p · 1 filing · 4 docs
Floor 1Sidewalk shed installation26p · 5 filings · 20 docs
Site & exteriorTsgl 8th Avenue LLC18p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dun 37-10 10th Street6207/08/2026
BR 10th Street Partners603/22/2026
10th St Realty Associates503/21/2026
Renaissance Contractors403/21/2026
9th Street Lic303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2023$76.5M—— → —$674/sf building
07/18/2018$11.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Andrew Katz Engineers211/26/2024
Gene Kaufman Architect509/22/2021
Green Design307/20/2020
Haider Engineering, P.E308/14/2019
Alpha Home Design105/17/2019
Royal T&E203/06/2019
Urban Foundation109/11/2018
Platonic Solids Architecture105/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gene Kaufman Architect503/21/2026
Haider Engineering, P.E203/21/2026
Billy Enterprises403/21/2026
Indesign Studio203/21/2026
SNR Expediting Design203/21/2026
Atlantic Building Supply203/21/2026
Outsource Consultants103/21/2026
Kna Consulting203/21/2026
Haider Engineering P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Billy EnterprisesScaffold2507/08/2026
Pacific RimScaffold2207/08/2026
Pacific RimGeneral Contractor507/08/2026
Sano WreckingScaffold107/08/2026
Triera ContractingScaffold107/08/2026
B&B Mechanical Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
All (130)Filed (18)Permit Issued (29)Signed Off (13)Violation (60)Inspection (4)Special Inspection (6)
02/06/2026
Violation issued (ECB, closed)
Elevators
02/06/2026
Violation issued (ECB, closed)
Elevators
02/03/2026
Violation issued (ECB, closed)
Elevators
02/03/2026
Violation issued (ECB, closed)
Elevators
01/27/2026
Violation issued (ECB, closed)
Elevators
01/27/2026
Violation issued (ECB, closed)
Elevators
12/19/2025
Violation issued (ECB, closed)
Elevators
10/01/2025
Violation issued (ECB, closed)
Elevators
09/03/2025
Violation issued (ECB, closed)
Construction
09/03/2025
Violation issued (ECB, closed)
Construction
12/02/2024
Signed off — Alteration
FILING TO REGISTER (2) LAARS BOILERS MODEL #RHCV2000. BOILERS INCORRECTLY FILED AS HWH UNDER 421643920. ALL GAS PIPING AND EQUIPMENT FILED AND SIGNED OFF UNDER 421643920-02. COMPLY WITH ECB VIOLATIONS 39125080L AND 39125079Y.
Q01141854-I1
11/26/2024
Filed — Alteration
FILING TO REGISTER (2) LAARS BOILERS MODEL #RHCV2000. BOILERS INCORRECTLY FILED AS HWH UNDER 421643920. ALL GAS PIPING AND EQUIPMENT FILED AND SIGNED OFF UNDER 421643920-02. COMPLY WITH ECB VIOLATIONS 39125080L AND 39125079Y.
Q01141854-P1
11/26/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/18/2024
Permit issued — Boiler Equipment
Q01141854-I1-BE
11/15/2024
Filed — Alteration
FILING TO REGISTER (2) LAARS BOILERS MODEL #RHCV2000. BOILERS INCORRECTLY FILED AS HWH UNDER 421643920. ALL GAS PIPING AND EQUIPMENT FILED AND SIGNED OFF UNDER 421643920-02. COMPLY WITH ECB VIOLATIONS 39125080L AND 39125079Y.
Q01141854-I1
09/24/2024
Violation issued (ECB, closed)
Unknown
09/24/2024
Violation issued (ECB, closed)
Construction
09/24/2024
Violation issued (ECB, closed)
Construction
09/24/2024
Violation issued (ECB, closed)
Construction
09/24/2024
Violation issued (ECB, closed)
Construction
09/24/2024
Violation issued (ECB, closed)
Construction
09/20/2024
Violation issued (ECB, closed)
Construction
09/17/2024
Violation issued (ECB, closed)
Boilers
09/17/2024
Violation issued (ECB, closed)
Boilers
04/17/2024
Violation issued (HPD, closed)
A
09/21/2023
Violation issued (ECB, closed)
Construction
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/15/2022
Signed off — Alteration
Q00186706-I1
06/09/2022
Signed off — Alteration
Q00202280-I1
06/06/2022
Signed off — Alteration
HEREBY FILING FOR NEW CURB CUT ON 10 STREET (15'-0")
Q00181772-I1
06/02/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00138316-I1
05/31/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00160999-I1
04/29/2022
Signed off — Alteration
Filing herewith for installation of Temporary Construction Fence in conjunction with NB 421643920
Q00077213-I1
04/27/2022
Signed off — Alteration
HEREBY FILING FOR NEW CURB CUT ON 37TH STREET
Q00181761-I1
04/26/2022
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/25/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/12/2022
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH NB #421643920.
Q00166657-I1
09/24/2021
Special inspection requirement — Public Assembly Emergency Lighting
Gene Kaufman
09/22/2021
Filed — No Work
Q00475765-P1
09/01/2021
Filed — No Work
Q00475765-I1
07/08/2021
Permit issued — Sidewalk Shed
Q00202280-I1-SH
06/16/2021
Permit issued — Curb Cut
Q00181761-I1-CC
06/15/2021
Permit issued — Curb Cut
Q00181772-I1-CC
06/15/2021
Permit issued — Curb Cut
Q00186706-I1-CC
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2021
Violation issued (ECB, closed)
Construction
05/18/2021
Violation issued (ECB, closed)
Unknown
05/18/2021
Violation issued (ECB, closed)
Construction
05/11/2021
Permit issued — Construction Fence
Q00166657-I1-FN
05/03/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00321351-I1
04/26/2021
Permit issued — Sidewalk Shed
Q00321351-I1-SH
04/05/2021
Signed off — Alteration
Q00321350-I1
03/31/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/07/2021
Violation issued (ECB, closed)
Construction
03/07/2021
Violation issued (ECB, closed)
Construction
03/07/2021
Violation issued (ECB, closed)
Construction
03/07/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offTarget Piping NY11/18/2024
DOB NOWSidewalk ShedSigned-offBilly Enterprises07/08/2021
DOB NOWCurb CutSigned-offChun Lin Chiang06/16/2021
DOB NOWCurb CutSigned-offChun Lin Chiang06/15/2021
DOB NOWCurb CutSigned-offChun Lin Chiang06/15/2021
DOB NOWConstruction FenceSigned-offChun Lin Chiang05/11/2021
DOB NOWSidewalk ShedSigned-offBilly Enterprises04/26/2021
DOB NOWSupported ScaffoldSigned-offBilly Enterprises03/04/2021
DOB NOWSupported ScaffoldSigned-offBilly Enterprises01/19/2021
DOB NOWConstruction FenceSigned-offChun Lin Chiang11/30/2020
DOB NOWConstruction FenceSigned-offChun Lin Chiang09/24/2020
DOB NOWSidewalk ShedSigned-offBilly Enterprises07/16/2020
DOB NOWConstruction FenceSigned-offChun Lin Chiang05/06/2020
DOB NOWSupported ScaffoldSigned-offBilly Enterprises02/25/2020
DOB NOWSidewalk ShedSigned-offBilly Enterprises02/25/2020
DOB NOWConstruction FenceSigned-offChun Lin Chiang01/10/2020
DOB NOWConstruction FenceSigned-offChun Lin Chiang12/17/2019
DOB NOWConstruction FenceSigned-offChun Lin Chiang10/03/2019
DOB NOWSupported ScaffoldSigned-offBilly Enterprises09/20/2019
DOB NOWSidewalk ShedSigned-offBilly Enterprises08/14/2019
DOB NOWConstruction FenceSigned-offChun Lin Chiang05/20/2019
DOB NOWSupported ScaffoldSigned-offBilly Enterprises05/13/2019
DOB NOWConstruction FenceSigned-offChun Lin Chiang04/05/2019
DOB NOWSidewalk ShedSigned-offBilly Enterprises03/07/2019
DOB NOWConstruction FenceSigned-offChun Lin Chiang12/28/2018
DOB NOWConstruction FenceSigned-offChun Lin Chiang12/19/2018
DOB NOWConstruction FenceSigned-offChun Lin Chiang09/11/2018
DOB NOWConstruction FenceSigned-offSano Wrecking05/24/2018
DOB NOWSidewalk ShedSigned-offTriera Contracting05/22/2018
BISOTISSUEDMetro Builders Group05/02/2024
BISOTISSUEDMetro Builders Group01/09/2024
BISOTISSUEDPacific Rim11/30/2022
BISFSISSUEDJack Piccini10/26/2021
BISSDISSUEDMPS Plumbing & Heating08/24/2021
BISPLISSUEDMPS Plumbing & Heating01/05/2021
BIS—ISSUEDPacific Rim12/03/2020
BISSDISSUEDRRP Plumbing08/27/2020
BIS—ISSUEDPacific Rim08/07/2020
BISEQISSUEDHKS Construction06/05/2020
BIS—ISSUEDPacific Rim03/05/2020
+ 18 more permits on file
8 projects · most recent 08/27/2022
General Wiring
FiledStatusContractorScope
08/27/2022CompleteWCK Electric—
10/20/2021CompleteJun Safety ElectricalGeneral Wiring
10/15/2021CompleteJun Safety ElectricalGeneral Wiring
09/21/2019CompleteKwong Ming Electric—
04/05/2019CompleteRichard Neu—
03/06/2019CompleteMeo Electric—
01/10/2019CompleteW 8 Electric1 meters, 1 new_meters
05/22/2018CompleteMeo Electric—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
06/02/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
04/26/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
04/25/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/24/2021Public Assembly Emergency LightingGene Kaufmanprogress
07/23/2020FinalBRIAN T. O'CONNORprogress
06/03/2019FinalSunil Saigalprogress
03/06/2019FinalSunil Saigalprogress
09/06/2018FinalDAVID VAN LEEUWENprogress
05/23/2018FinalBELAL SALIMprogress
▾Documents — 538 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch4
08/29/2026Q00046567-I1Request digital key ↗
08/28/2026Q00077213-I1Request digital key ↗
08/21/2026Q01141854-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
08/28/2026Q00160999-P1Request digital key ↗
08/28/2026Q00160999-I1Request digital key ↗
08/28/2026Q00321350-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut3
08/28/2026Q00186706-I1Request digital key ↗
08/28/2026Q00181772-I1Request digital key ↗
08/28/2026Q00181761-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/28/2026Q00138316-I1Request digital key ↗
08/28/2026Q00202280-I1Request digital key ↗
08/28/2026Q00321351-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/27/2026Q00475765-P1Request digital key ↗
08/27/2026Q00475765-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00166657-I1Request digital key ↗
▸Applications & Permits111
▸BISPLAN / WORK APPROVAL APPLICATION70
07/22/2024440810366Open ↗
11/16/2022440756521Open ↗
12/08/2021421643920Open ↗
Showing 3 of 70 on file for this type
▸BISWORK PERMIT APPLICATION32
01/09/2024440810366Open ↗
11/30/2022440756521Open ↗
10/12/2021440510350Open ↗
Showing 3 of 32 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION4
06/14/2021421643920Open ↗
Showing 1 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
09/08/2021440489188Open ↗
Showing 1 of 3 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING RESOLUTION DETERMINATION2
07/11/2020421643920Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications88
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
04/04/2022421643920Open ↗
12/10/2021421643920Open ↗
12/10/2021421643920Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/28/2026Q00160999-P1Open ↗
08/28/2026Q00160999-I1Open ↗
08/28/2026Q00166657-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
08/11/2021421643920Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026Q00138316-I1Open ↗
08/27/2026Q00046947-I1Open ↗
08/24/2026Q00475765-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/16/2022440756521Open ↗
Showing 1 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/16/2022440756521Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/16/2022440756521Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment39
▸BISSCHEDULE B - PLUMBING25
12/02/2021421643920Open ↗
11/30/2021421643920Open ↗
11/30/2021421643920Open ↗
Showing 3 of 25 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
10/22/2021440538884Open ↗
04/16/2021440538884Open ↗
Showing 2 of 3 on file for this type
▸BISSEWER CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRIC CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE SYSTEMS1
10/19/2021440489204Open ↗
▸Safety & Tenant Protection20
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN2
12/19/2023440810366Open ↗
11/30/2022440756521Open ↗
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN2
11/19/2021421643920Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
08/24/2022421643920Open ↗
08/23/2022440489188Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRODENT CONTROL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
12/10/2021421643920Open ↗
12/10/2021421643920Open ↗
12/10/2021421643920Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
11/23/2021421643920Open ↗
11/23/2021421643920Open ↗
11/23/2021421643920Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/17/2023440756521Open ↗
08/24/2022421643920Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY20
11/22/2024440810366Open ↗
12/19/2023440810366Open ↗
11/23/2021421643920Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
05/17/2022440538884Open ↗
▸Approvals, Objections & Sign-offs60
▸BISSCHEDULE A - OCCUPANCY / USE18
10/06/2021421643920Open ↗
09/30/2021421643920Open ↗
09/23/2021421643920Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
11/25/2024440810366Open ↗
05/18/2023440756521Open ↗
08/16/2022440510350Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
12/03/2020421643920Open ↗
11/26/2019440489188Open ↗
11/26/2019440489188Open ↗
Showing 3 of 12 on file for this type
▸BISSUPERSEDING LETTER5
10/12/2021440510350Open ↗
10/12/2021440510350Open ↗
07/22/2021421643920Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
07/31/2024440810366Open ↗
07/31/2024440810366Open ↗
▸BISFINAL2
05/17/2023440756521Open ↗
05/17/2022440538884Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT17
10/27/2023440810366Open ↗
11/16/2022440756521Open ↗
Showing 2 of 17 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
07/22/2021421643920Open ↗
03/14/2020421643920Open ↗
01/21/2020421643920Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
11/21/2024440810366Open ↗
05/17/2022440538884Open ↗
04/26/2022440510350Open ↗
Showing 3 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
12/03/2020421643920Open ↗
10/01/2020421643920Open ↗
▸Filing & Intake Forms65
▸BISADDITIONAL INFORMATION38
10/14/2022421643920Open ↗
08/15/2022440510350Open ↗
12/08/2021421643920Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING COVER SHEET16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
11/16/2022440756521Open ↗
Showing 1 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
12/03/2020421643920Open ↗
10/01/2020421643920Open ↗
Showing 2 of 5 on file for this type
▸Other Documents9
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
03/14/2020421643920Open ↗
01/21/2020421643920Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
08/13/2026Q00046567-I1Open ↗
08/13/2026Q00138316-I1Open ↗
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT1
05/17/2022440510350Open ↗