← Back
BuildNYC
Training school
37-11 47TH AVENUE
QUEENS · Sunnyside · BIN 4003171
💬 Discuss this project
1949Year Built
1Stories
W4Building Class
M1-4Zoning
40,000 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Training school · Owner of record: Plumbers Local Union No. 1, Trade Educat Ion Fund · 20,017 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPLUMBERS LOCAL UNION NO.1Under Construction13p · 5 filings · 20 docs
Floor 1PLUMBERS LOCAL UNION NO.1Under Construction13p · 9 filings · 20 docs
CellarPLUMBERS LOCAL UNION NO.1Under Construction13p · 6 filings · 20 docs
Site & exteriorPLUMBERS LOCAL UNION NO.113p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Plumbers Local1 Trade Education707/15/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering705/14/2026
MG Engineering201/08/2026
A/R Environetics Architects506/16/2022
Tohfaz Uddin PE310/06/2021
Environetics Design107/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants403/21/2026
Rcga Architects2403/21/2026
Eurocelt Expediting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Benchmark BuildersGeneral Contractor1207/08/2026
Starr IndustriesScaffold707/08/2026
Tristate Plumbing ServicesPlumbing307/15/2026
Tower Fire ProtectionFire Protection207/08/2026
B.R. Fries & AssociatesGeneral Contractor104/09/2026
Rockmor Electric EnterprisesElectrical103/22/2026
Mac FelderPlumbing107/08/2026
J.A. Lee Electric ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827305/14/2026
Milrose Consultants2003802/13/2024
Special Inspection Services1200206/16/2022
Building Lifecycle
All (176)Filed (18)Permit Issued (17)Signed Off (8)Violation (60)Inspection (9)Objection (34)Special Inspection (30)
07/14/2026
Permit issued — Plumbing
Q01392793-I1-PL
05/14/2026
Filed — Alteration
Q01392793-I1
05/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
04/07/2026
Permit issued — Plumbing
Q01314952-I1-PL
02/10/2026
Permit issued — Mechanical Systems
Q01314952-S2-MS
01/08/2026
Filed — Alteration
Herewith Filing Modifications to Existing Mechanical systems, work is limited to Ductwork and Fans as per plans. No change in Use, Egress or Occupancy is proposed.
Q01314952-S2
01/08/2026
Filed — Alteration
Herewith Filing Modifications to Existing Mechanical systems, work is limited to Ductwork and Fans as per plans. No change in Use, Egress or Occupancy is proposed.
Q01314952-I1
12/18/2025
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Electrical motors and elevators
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Final
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
11/06/2025
Special inspection requirement — Maintenance information
JONAR MADRIAGA
03/03/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/16/2025
Signed off — Alteration
Installation of Plumbing fixtures as shown on the plans to facilitate the renovation work filed separately.
Q00539239-I1
11/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2024
Signed off — Alteration
Installation of HVAC systems as shown on the plans
Q00547055-I1
02/19/2024
Objection resolved — Addressed
02/15/2024
Objection raised — Other
02/13/2024
Filed — Alteration
Installation of Plumbing fixtures as shown on the plans to facilitate the renovation work filed separately.
Q00539239-P3
02/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
02/13/2024
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
02/13/2024
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
Christopher Drutjons
02/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
01/11/2024
Filed — Alteration
Installation of Plumbing fixtures as shown on the plans to facilitate the renovation work filed separately.
Q00539239-P2
11/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
11/21/2023
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
Christopher Drutjons
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
11/21/2023
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
01/12/2023
Signed off — Alteration
Rearrange and Install additional sprinkler heads.
Q00547058-I1
01/03/2023
Signed off — Alteration
Filing a PAA to obtain an approval for the Revised plans.
Q00595721-I1
12/08/2022
Signed off — Alteration
Q00539225-I1
11/10/2022
Permit issued — General Construction
Q00539182-I1-GC
11/01/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/31/2022
Permit issued — Plumbing
Q00539239-I1-PL
10/27/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/26/2022
Permit issued — Sprinklers
Q00547058-I1-EW-SP
07/18/2022
Signed off — Alteration
Q00605882-I1
07/18/2022
Signed off — Alteration
INSTALLATION OF A PLYWOOD FENCE ENCLOSURE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE ENCLOSURE TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
Q00605909-I1
06/17/2022
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
06/17/2022
Special inspection requirement — Final
Christopher Drutjons
06/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
06/17/2022
Special inspection requirement — Sprayed fire-resistant materials
Christopher Drutjons
06/17/2022
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
06/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
06/17/2022
Special inspection requirement — Vestibules
Christopher Drutjons
06/17/2022
Special inspection requirement — Permanent certificate
Christopher Drutjons
06/16/2022
Filed — Alteration
Filing a PAA to obtain an approval for the Revised plans.
Q00595721-P1
05/26/2022
Objection resolved — Addressed
05/17/2022
Objection resolved — Addressed
05/17/2022
Objection resolved — Addressed
04/25/2022
Objection raised — Scope
Latest 60 of 176 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTristate Plumbing Services07/14/2026
DOB NOWPlumbingPermit IssuedMac Felder04/07/2026
DOB NOWMechanical SystemsPermit IssuedB.R. Fries & Associates02/10/2026
DOB NOWGeneral ConstructionPermit IssuedBenchmark Builders11/10/2022
DOB NOWPlumbingSigned-offTristate Plumbing Services10/31/2022
DOB NOWSprinklersSigned-offTPC Third Party Consulting10/26/2022
DOB NOWStructuralSigned-offBenchmark Builders01/04/2022
DOB NOWGeneral ConstructionSigned-offBenchmark Builders01/04/2022
DOB NOWMechanical SystemsSigned-offBenchmark Builders01/04/2022
DOB NOWStructuralSigned-offBenchmark Builders11/23/2021
DOB NOWMechanical SystemsSigned-offBenchmark Builders10/28/2021
DOB NOWSprinklersSigned-offTPC Third Party Consulting10/22/2021
DOB NOWPlumbingSigned-offTristate Plumbing Services10/22/2021
DOB NOWGeneral ConstructionSigned-offBenchmark Builders10/18/2021
DOB NOWProtection and Mechanical MethodsSigned-offStarr Industries10/07/2021
DOB NOWSupported ScaffoldSigned-offStarr Industries10/05/2021
DOB NOWSidewalk ShedSigned-offStarr Industries09/27/2021
BISPLISSUEDPinnacle Plumbing & Heating11/05/2001
BISOTISSUEDJRC Archicon10/15/2001
BISOTISSUEDTJM Construction03/17/2000
BIS—ISSUEDTJM Construction02/01/2000
BISPLISSUEDF & V Metro Contracting08/25/1999
BISEQISSUEDTJM Construction07/09/1999
BISOTISSUEDF and V Metro Contracting02/26/1999
BISOTISSUEDF and V Metro Contracting07/10/1998
BISOTISSUEDSolutions02/13/1998
BISPLISSUEDPLG Solution08/08/1997
BISOTISSUEDPlumbing Solutions06/27/1997
BISEQISSUEDPlumbing Solutions06/27/1997
BISOTISSUEDMajestic Midtown04/03/1995
1 project · most recent 01/08/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2026Permit IssuedB.R. Fries & AssociatesVentilation Systems
Ventilation
Greenheck FJC-306 100 CFM · Exhaust Fan ×2
1 project · most recent 01/08/2026
Water/Sanitary
FiledStatusContractorScope
01/08/2026Permit IssuedMac FelderWater/Sanitary
2 projects · most recent 10/14/2021
General Wiring
FiledStatusContractorScope
10/14/2021CompleteJ.A. Lee Electric Services—
10/13/2021CompleteRockmor Electric EnterprisesGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/03/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/27/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
04/24/2026Post-installed AnchorsJONAR MADRIAGAspecial
12/18/2025Shutoff dampersJONAR MADRIAGAenergy_progress
11/06/2025Maintenance informationJONAR MADRIAGAenergy_progress
11/06/2025Post-installed AnchorsJONAR MADRIAGAspecial
11/06/2025Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
11/06/2025Electrical motors and elevatorsJONAR MADRIAGAenergy_progress
11/06/2025Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
11/06/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
11/06/2025Mechanical SystemsJONAR MADRIAGAspecial
11/06/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
11/06/2025Post-installed AnchorsJONAR MADRIAGAspecial
11/06/2025Exhaust and Vent Systems in Plenums and DuctsJONAR MADRIAGAspecial
11/06/2025FinalJONAR MADRIAGAprogress
11/06/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/13/2024High-Pressure Fuel-Gas Piping (Welding)Christopher Drutjonsspecial
02/13/2024Post-installed AnchorsChristopher Drutjonsspecial
02/13/2024HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
02/13/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
11/21/2023High-Pressure Fuel-Gas Piping (Welding)Christopher Drutjonsspecial
11/21/2023HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
11/21/2023Post-installed AnchorsChristopher Drutjonsspecial
11/21/2023Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
06/17/2022Permanent certificateChristopher Drutjonsenergy_progress
06/17/2022Luminous Exit Path MarkingsChristopher Drutjonsspecial
06/17/2022Sprayed fire-resistant materialsChristopher Drutjonsspecial
Latest 25 of 71.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
PLUMBERS LOCAL UNION NO.1OfficeEntire building
Project Q01392793 Alteration · Permit Entire · 05/14/2026
Project Q00595721 Alteration · LOC Issued · 09/29/2021
Project Q00539225 Alteration · LOC Issued · 07/08/2021
Project Q00539239 Alteration · LOC Issued · 07/06/2021
Project Q00547055 Alteration · LOC Issued · 07/06/2021
Project Q00547058 Alteration · LOC Issued · 07/06/2021
Project Q00539182 Alteration CO · Permit Entire · 06/23/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch15
08/27/2026Q00539225-I1Request digital key ↗
08/27/2026Q00600060-I1Request digital key ↗
08/27/2026Q00595721-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/26/2026Q00672153-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00539182-I1Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature36
10/07/2026Q00539239-P2Open ↗
09/26/2026Q00595721-P1Open ↗
09/26/2026Q00595721-P1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
10/07/2026Q00539239-P2Open ↗
10/07/2026Q00539239-P2Open ↗
10/07/2026Q00539239-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026Q00547055-I1Open ↗
08/27/2026Q00595721-P1Open ↗
08/27/2026Q00595721-I1Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00539182-I1Open ↗
08/13/2026Q00539182-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00539182-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00539182-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/26/2026Q00539239-I1Open ↗
08/15/2026Q00547055-I1Open ↗
08/13/2026Q00547058-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00595721-I1Open ↗
08/27/2026Q00595721-P1Open ↗
08/16/2026Q01392793-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026Q00547055-I1Open ↗
08/13/2026Q00539182-I1Open ↗
08/13/2026Q00539239-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/26/2026Q00672153-I1Open ↗
08/16/2026Q01392793-I1Open ↗
08/13/2026Q00595721-I1Open ↗
Showing 3 of 16 on file for this type
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00595721-I1Open ↗
08/13/2026Q00595721-P1Open ↗
▸DOB NOWPD1 Document2
08/13/2026Q00539182-P1Open ↗
08/13/2026Q00539182-I1Open ↗