BuildNYC
Office with commercial, 1-6 stories
37-12 108TH STREET
QUEENS · BIN 4437230
💬 Discuss this project
1960Year Built
2Stories
O5Building Class
R6BZoning
25,000 sfGross Floor Area
2Units
14 Active Violations 0 unresolved · 14 paperwork only 4 likely answered 2 old, status unconfirmed ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: Blans Development · 13,027 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofUrban Health Plan68p · 1 filing · 20 docs
Floor 2Urban Health Plan, Urbanhealth90p · 2 filings · 20 docs
Floor 1
CellarUrban Health Plan20p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installation6p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Urban Health Plan6307/08/2026
Blans Development1403/22/2026
Enn Jay Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sandeep Kaur103/21/2026
Richard Montana, Architect2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sentinel BuildersGeneral Contractor607/08/2026
Advanced PlumbingPlumbing307/08/2026
Advanced PlumbingFire Protection207/08/2026
J.k.construction New YorkScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Quality Control Laborator406708/22/2025
Building Lifecycle
All (156)Filed (12)Permit Issued (10)Signed Off (2)Violation (44)Inspection (10)Objection (48)Special Inspection (30)
10/08/2026
Signed off — Alteration
Furnish and Install mechnical system
Q00875742-S3
10/07/2026
Signed off — Alteration
Furnish and Install mechnical system
Q00875742-S4
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN DEGUZMAN
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN DEGUZMAN
05/12/2026
Special inspection requirement — Maintenance information
EDWIN DEGUZMAN
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN DEGUZMAN
04/07/2026
Permit issued — Structural
Q00875742-S3-ST
04/03/2026
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P6
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN DEGUZMAN
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN DEGUZMAN
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN DEGUZMAN
03/31/2026
Special inspection requirement — Maintenance information
EDWIN DEGUZMAN
03/05/2026
Permit issued — Plumbing
Q00875742-S5-PL
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — Maintenance information
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — Mechanical Systems
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — Shutoff dampers
EDWIN DEGUZMAN
03/02/2026
Special inspection requirement — Final
EDWIN DEGUZMAN
02/20/2026
Permit issued — Mechanical Systems
Q00875742-S2-MS
01/30/2026
Objection resolved — Addressed
01/23/2026
Objection resolved — Addressed
12/05/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2025
Special inspection requirement — Sprinkler Systems
EDWIN DEGUZMAN
10/15/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Scope
09/05/2025
Objection raised — Scope
09/04/2025
Special inspection requirement — Insulation placement and R values
EDWIN DEGUZMAN
09/04/2025
Special inspection requirement — Sprayed fire-resistant materials
SAMUEL BAUTISTA
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMUEL BAUTISTA
09/04/2025
Special inspection requirement — Energy Code Compliance Inspections
EDWIN DEGUZMAN
09/04/2025
Special inspection requirement — Final
EDWIN DEGUZMAN
09/04/2025
Special inspection requirement — Interior lighting power
EDWIN DEGUZMAN
09/04/2025
Special inspection requirement — Lighting controls
EDWIN DEGUZMAN
08/22/2025
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P2
08/22/2025
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P5
08/22/2025
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P4
08/22/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Admin
08/05/2025
Filed — Alteration
Furnish and Install mechnical system
Q00875742-P3
07/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Final
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Mechanical Systems
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Lighting controls
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Final
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
EDWIN DEGUZMAN
07/18/2025
Special inspection requirement — Sprayed fire-resistant materials
SAMUEL BAUTISTA
06/12/2025
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
06/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/05/2025
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
01/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/22/2025
Permit issued — Plumbing
Q00875742-S5-PL
01/22/2025
Permit issued — Sprinklers
Q00875742-S4-EW-SP
12/10/2024
Permit issued — General Construction
Q00875742-I1-GC
10/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
Q01083374-I1
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSentinel Builders04/07/2026
DOB NOWPlumbingSigned-offAdvanced Plumbing03/05/2026
DOB NOWMechanical SystemsPermit IssuedSentinel Builders02/20/2026
DOB NOWPlumbingSigned-offAdvanced Plumbing01/22/2025
DOB NOWSprinklersSigned-offAdvanced Plumbing01/22/2025
DOB NOWGeneral ConstructionPermit IssuedSentinel Builders12/10/2024
DOB NOWSidewalk ShedPermit IssuedJ.k.construction New York07/23/2024
DOB NOWPlumbingSigned-offAdvanced Plumbing01/16/2024
DOB NOWSprinklersSigned-offAdvanced Plumbing01/16/2024
DOB NOWGeneral ConstructionPermit IssuedSentinel Builders11/28/2023
BISSPISSUEDAura Plumbing04/11/2013
BISOTISSUEDGalcon Enterprises08/31/2011
BISPLISSUEDAura Plumbing10/29/2010
BISOTISSUEDAtlas Construction of NY10/22/2010
BISPLISSUEDThe Plumbing Company06/15/2010
BISPLISSUEDQueens Maintenance Co03/06/2009
BISBLISSUEDQueens Maintenance Co03/05/2009
BISPLISSUEDThe Plumbing Company03/04/2009
BIS—ISSUEDBlans Development02/12/2009
BISPLISSUEDThe Plumbing Company01/28/2009
BISSPISSUEDThe Plumbing Company01/28/2009
BISMHISSUEDAir Docs12/04/2008
BISPLISSUEDBenniati Plumbing & Heating08/08/2008
BISOTISSUEDHilltop Construction Management04/08/2008
BISOTISSUEDHilltop Construction Management04/08/2008
BISOTISSUEDHilltop Construction Management04/08/2008
BISEQISSUEDColgate Scaffolding & Equipment03/25/2008
BISOTISSUEDHilltop Construction Management11/15/2007
BISOTISSUEDHilltop Construction Management11/15/2007
BISSPISSUEDThe Plumbing Company10/30/2007
BISPLISSUEDThe Plumbbing Company10/30/2007
BISEQISSUEDColgate Scaffolding & Equipment09/10/2007
BIS—ISSUEDBlans Development09/04/2007
BISOTISSUEDHilltop Construction Management07/26/2007
BISOTISSUEDBlans Development12/06/2006
BISBLISSUEDSeickel & Sons Plumbing04/14/1995
BISPLISSUEDSeickel & Sons Plumbing04/14/1995
1 project · most recent 04/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/03/2026Permit IssuedSentinel BuildersHeating and Air Conditioning Systems
Heat / Cool
Carrier 48GDCK05 4 tons · Rooftop Unit ×12
1 project · most recent 04/03/2026
Sprinkler System
FiledStatusContractorScope
04/03/2026Signed-offAdvanced PlumbingSprinkler System
1 project · most recent 04/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/03/2026Signed-offAdvanced PlumbingGas, Water/Sanitary
2 projects · most recent 02/26/2025
General Wiring
FiledStatusContractorScope
02/26/2025Permit IssuedA.S.K. ElectricalGeneral Wiring
07/29/2024Permit IssuedHigh Quality Electric of—
1 project · most recent 04/03/2026
Steel
FiledStatusContractorScope
04/03/2026Permit IssuedSentinel BuildersSteel
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/05/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/12/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
06/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
01/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/12/2026HVAC-R and service water heating equipmentEDWIN DEGUZMANenergy_progress
05/12/2026HVAC-R and service water piping design and insulationEDWIN DEGUZMANenergy_progress
05/12/2026Maintenance informationEDWIN DEGUZMANenergy_progress
05/12/2026HVAC-R and service water heating system controlsEDWIN DEGUZMANenergy_progress
03/31/2026HVAC-R and service water heating system controlsEDWIN DEGUZMANenergy_progress
03/31/2026HVAC-R and service water piping design and insulationEDWIN DEGUZMANenergy_progress
03/31/2026HVAC-R and service water heating equipmentEDWIN DEGUZMANenergy_progress
03/31/2026Maintenance informationEDWIN DEGUZMANenergy_progress
03/02/2026HVAC-R and service water heating system controlsEDWIN DEGUZMANenergy_progress
03/02/2026HVAC-R and service water heating equipmentEDWIN DEGUZMANenergy_progress
03/02/2026Maintenance informationEDWIN DEGUZMANenergy_progress
03/02/2026HVAC-R and service water piping design and insulationEDWIN DEGUZMANenergy_progress
03/02/2026Mechanical SystemsEDWIN DEGUZMANspecial
03/02/2026Shutoff dampersEDWIN DEGUZMANenergy_progress
03/02/2026FinalEDWIN DEGUZMANprogress
11/10/2025Sprinkler SystemsEDWIN DEGUZMANspecial
09/04/2025Insulation placement and R valuesEDWIN DEGUZMANenergy_progress
09/04/2025Sprayed fire-resistant materialsSAMUEL BAUTISTAspecial
09/04/2025Fire-Resistant Penetrations and JointsSAMUEL BAUTISTAspecial
09/04/2025Energy Code Compliance InspectionsEDWIN DEGUZMANprogress
09/04/2025FinalEDWIN DEGUZMANprogress
09/04/2025Interior lighting powerEDWIN DEGUZMANenergy_progress
09/04/2025Lighting controlsEDWIN DEGUZMANenergy_progress
07/18/2025HVAC-R and service water heating system controlsEDWIN DEGUZMANenergy_progress
07/18/2025FinalEDWIN DEGUZMANprogress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Urban Health PlanMedical / HealthcareCellar, Floor 2, Roof
Project Q00875742 Alteration · Permit Entire · 08/30/2023
UrbanhealthMedical / HealthcareFloor 2
Project Q00900728 Alteration · QA Failed · 08/24/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/24/2026Q00900728-I1Request digital key ↗
08/21/2026Q01083374-I1Request digital key ↗
08/17/2026Q00875742-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION14
10/04/2021401008636Open ↗
06/17/2021401008636Open ↗
09/27/2019401008636Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION6
04/17/2013420252069Open ↗
09/01/2011420476470Open ↗
10/29/2010420252069Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
06/19/2013420252069Open ↗
05/26/2011420250579Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
10/19/2010420252069Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature24
09/01/2026Q00875742-S2Open ↗
09/01/2026Q00875742-I1Open ↗
09/01/2026Q00875742-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/24/2026Q00900728-I1Open ↗
08/17/2026Q00875742-I1Open ↗
08/17/2026Q00875742-P6Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
08/16/2016421358284Open ↗
05/29/2013420252069Open ↗
05/07/2013420252069Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00875742-S2Open ↗
09/01/2026Q00875742-I1Open ↗
09/01/2026Q00875742-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/30/2011420476470Open ↗
10/19/2010420250579Open ↗
10/19/2010420252069Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/30/2011420476470Open ↗
10/19/2010420250579Open ↗
10/19/2010420252069Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE7
08/26/2013420252069Open ↗
06/20/2011420252069Open ↗
05/23/2011420252069Open ↗
Showing 3 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
08/26/2013420252069Open ↗
06/20/2011420252069Open ↗
05/23/2011420252069Open ↗
▸BISSCHEDULE B - PLUMBING2
03/23/2011420252069Open ↗
10/19/2010420252069Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/19/2019421885776Open ↗
08/16/2016421358284Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
10/19/2010420252069Open ↗
10/19/2010420250579Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00900728-I1Open ↗
08/17/2026Q00875742-I1Open ↗
08/17/2026Q00875742-S5Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
08/30/2011420476470Open ↗
10/19/2010420250579Open ↗
11/28/2008410197451Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/19/2019421885776Open ↗
04/19/2019421885776Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
08/30/2011420476470Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION5
01/18/2022401008636Open ↗
08/06/2021401008636Open ↗
03/04/2021401008636Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
08/30/2011420476470Open ↗
10/19/2010420250579Open ↗
10/19/2010420252069Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/19/2013420252069Open ↗
06/10/2011420250579Open ↗
11/06/2009410197451Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
10/04/2021401008636Open ↗
09/27/2019401008636Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q00900728-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
08/16/2016421358284Open ↗
06/19/2013420252069Open ↗
08/30/2011420476470Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET7
04/19/2019421885776Open ↗
04/19/2019421885776Open ↗
08/16/2016421358284Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION1
01/18/2022401008636Open ↗