← Back
BuildNYC
Two family brick
37-14 59TH STREET
QUEENS · Woodside · BIN 4027709
💬 Discuss this project
1935Year Built
2Stories
B1Building Class
R5BZoning
1,880 sfGross Floor Area
2Units
3 Active Violations ▸
Two family brick · 2,442 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPartial removal and shoring25p · 2 filings · 20 docs
Floor 2Partial removal and shoring32p · 2 filings · 20 docs
Floor 1Partial removal and shoring32p · 2 filings · 20 docs
Cellar29p · 1 filing · 20 docs
BasementPartial removal and shoring1p · 1 filing · 3 docs
Sub-BasementPartial removal and shoring1p · 1 filing · 3 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gerald J. Caliendo R.A703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sound MaintenanceScaffold1007/08/2026
Sound MaintenanceGeneral Contractor704/09/2026
Aura PlumbingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616501/21/2026
Shahrish Shuvo Engineering8524104/14/2023
Building Lifecycle
All (77)Filed (7)Permit Issued (16)Signed Off (4)Violation (8)Inspection (4)Objection (8)Special Inspection (30)
03/09/2026
Signed off — Alteration
HEREWITH FILING FOR PROPOSED INSTALLATION OF NEW PLUMBING & GAS FIXTURES ON CELLAR, FIRST & SECOND FLOOR , FILED IN CONJUNCTION WITH ALT 2 JOB NUMBER # Q00848841-I1
Q00848841-I1
03/03/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/10/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
02/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/10/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
02/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
02/10/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
02/10/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/10/2026
Special inspection requirement — Metering
FAHAD FATEH
02/10/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
02/10/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
02/10/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/10/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/10/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/27/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/25/2026
Objection raised — Plumbing
01/25/2026
Objection raised — Structural
01/21/2026
Filed — Alteration
HEREWITH FILING FOR PROPOSED INSTALLATION OF NEW PLUMBING & GAS FIXTURES ON CELLAR, FIRST & SECOND FLOOR , FILED IN CONJUNCTION WITH ALT 2 JOB NUMBER # Q00848841-I1
Q00848841-P2
01/21/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
01/21/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/21/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/21/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/21/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/21/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/21/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/21/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/21/2026
Special inspection requirement — Metering
FAHAD FATEH
01/21/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
12/31/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/29/2025
Signed off — Alteration
HEREWITH FILING FOR PROPOSED INSTALLATION OF NEW PLUMBING & GAS FIXTURES ON CELLAR, FIRST & SECOND FLOOR , FILED IN CONJUNCTION WITH ALT 2 JOB NUMBER # Q00848841-I1
Q00848841-S1
10/22/2025
Signed off — Alteration
Q00859675-I1
09/17/2025
Permit issued — General Construction
Q00848841-I1-GC
09/17/2025
Permit issued — Construction Fence
Q00859675-I1-FN
08/14/2025
Permit issued — Plumbing
Q00848841-S1-PL
06/06/2025
Permit issued — Structural
Q00848841-S2-ST
04/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/14/2025
Permit issued — Structural
Q00848841-S2-ST
12/06/2024
Permit issued — General Construction
Q00848841-I1-GC
11/05/2024
Filed — Alteration
HEREWITH FILING FOR PROPOSED INSTALLATION OF NEW PLUMBING & GAS FIXTURES ON CELLAR, FIRST & SECOND FLOOR , FILED IN CONJUNCTION WITH ALT 2 JOB NUMBER # Q00848841-I1
Q00848841-P1
09/03/2024
Permit issued — Construction Fence
Q00859675-I1-FN
08/21/2024
Permit issued — Plumbing
Q00848841-S1-PL
02/14/2024
Permit issued — Structural
Q00848841-S2-ST
01/10/2024
Filed — Alteration
HEREWITH FILING FOR PROPOSED INSTALLATION OF NEW PLUMBING & GAS FIXTURES ON CELLAR, FIRST & SECOND FLOOR , FILED IN CONJUNCTION WITH ALT 2 JOB NUMBER # Q00848841-I1
Q00848841-S2
12/05/2023
Permit issued — General Construction
Q00848841-I1-GC
11/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/12/2023
Signed off — Alteration
Q00855962-I1
09/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/31/2023
Permit issued — Protection and Mechanical Methods
Q00855962-I1-PMM
08/31/2023
Permit issued — Construction Fence
Q00859675-I1-FN
08/30/2023
Filed — Alteration
HEREWITH FILING FOR PROPOSED INSTALLATION OF NEW PLUMBING & GAS FIXTURES ON CELLAR, FIRST & SECOND FLOOR , FILED IN CONJUNCTION WITH ALT 2 JOB NUMBER # Q00848841-I1
Q00848841-S1
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSound Maintenance09/17/2025
DOB NOWConstruction FenceSigned-offSound Maintenance09/17/2025
DOB NOWPlumbingSigned-offAura Plumbing08/14/2025
DOB NOWStructuralSigned-offSound Maintenance06/06/2025
DOB NOWStructuralSigned-offSound Maintenance02/14/2025
DOB NOWGeneral ConstructionSigned-offSound Maintenance12/06/2024
DOB NOWConstruction FenceSigned-offSound Maintenance09/03/2024
DOB NOWPlumbingSigned-offAura Plumbing08/21/2024
DOB NOWStructuralSigned-offSound Maintenance02/14/2024
DOB NOWGeneral ConstructionSigned-offSound Maintenance12/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offSound Maintenance08/31/2023
DOB NOWConstruction FenceSigned-offSound Maintenance08/31/2023
DOB NOWProtection and Mechanical MethodsSigned-offSound Maintenance08/09/2023
DOB NOWConstruction FenceSigned-offSound Maintenance08/02/2023
DOB NOWConstruction FenceSigned-offSound Maintenance04/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offSound Maintenance04/18/2023
1 project · most recent 01/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/21/2026Signed-offAura PlumbingGas, Water/Sanitary
2 projects · most recent 05/29/2024
General Wiring
FiledStatusContractorScope
05/29/2024CompleteValentis ElectricGeneral Wiring
03/21/2023CompleteValentis Electric—
1 project · most recent 01/21/2026
Masonry Wood
FiledStatusContractorScope
01/21/2026Signed-offSound MaintenanceMasonry, Wood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/03/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/31/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
02/10/2026Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
02/10/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
02/10/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/10/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
02/10/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/10/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
02/10/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/10/2026Lighting controlsFAHAD FATEHenergy_progress
02/10/2026Fenestration air leakageFAHAD FATEHenergy_progress
02/10/2026MeteringFAHAD FATEHenergy_progress
02/10/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
02/10/2026Permanent certificateFAHAD FATEHenergy_progress
02/10/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
02/10/2026Fenestration areasFAHAD FATEHenergy_progress
02/10/2026Interior lighting powerFAHAD FATEHenergy_progress
01/21/2026Lighting controlsFAHAD FATEHenergy_progress
01/21/2026Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
01/21/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/21/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/21/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/21/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/21/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/21/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/21/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/21/2026Interior lighting powerFAHAD FATEHenergy_progress
Latest 25 of 44.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026Q00855962-I1Request digital key ↗
08/24/2026Q00859675-I1Request digital key ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature9
10/05/2026Q00848841-I1Open ↗
10/05/2026Q00848841-I1Open ↗
09/01/2026Q00848841-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/05/2026Q00848841-I1Open ↗
09/01/2026Q00848841-S1Open ↗
09/01/2026Q00855962-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026Q00859675-I1Open ↗
08/13/2026Q00855962-I1Open ↗
08/13/2026Q00848841-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form3
08/13/2026Q00848841-S2Open ↗
08/13/2026Q00848841-S1Open ↗
08/13/2026Q00848841-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00848841-P2Open ↗