← Back
One story - permanent living quarter
37-16 255 STREET
QUEENS · Douglaston-Little Neck · BIN 4169706
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R2AZoning
962 sfGross Floor Area
1Units
One story - permanent living quarter · 5,309 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
CellarUnder Construction1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
255TH STREET PROPERTY208/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/07/2025$1.1M—— → —$1,091/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC405/09/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STREAM ROCK CONTSRUCTION*General Contractor106/28/2026
Building Lifecycle
All (51)Filed (4)Permit Issued (1)Objection (16)Special Inspection (30)
07/10/2026
Objection resolved — Resolved
07/09/2026
Objection resolved — Resolved
06/26/2026
Permit issued — Construction Fence
Q01348588-S2-FN
06/26/2026
Objection resolved — Resolved
06/25/2026
Special inspection requirement — Subgrade Inspections
06/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
06/25/2026
Special inspection requirement — Structural Steel - Welding
06/25/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/25/2026
Special inspection requirement — Concrete - Cast-In-Place
06/25/2026
Special inspection requirement — Heating Systems
06/25/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
06/22/2026
Objection resolved — Resolved
06/22/2026
Objection resolved — Resolved
06/22/2026
Objection resolved — Resolved
06/19/2026
Objection resolved — Resolved
06/18/2026
Objection resolved — Resolved
06/18/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Zoning
05/22/2026
Objection raised — Structural
05/22/2026
Objection raised — Energy
05/22/2026
Objection raised — Zoning
05/22/2026
Objection raised — Admin
05/22/2026
Objection raised — Structural
05/22/2026
Objection raised — Admin
05/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/22/2026
Special inspection requirement — Electric vehicle service equipment requirements
05/22/2026
Special inspection requirement — Metering
05/22/2026
Special inspection requirement — Maintenance information
05/22/2026
Special inspection requirement — Interior lighting power
05/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01348588-S3
05/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01348588-S1
05/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01348588-I1
05/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01348588-S2
05/09/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/09/2026
Special inspection requirement — Maintenance information
05/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/09/2026
Special inspection requirement — Energy Code Compliance Inspections
05/09/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/09/2026
Special inspection requirement — Sprinkler Systems
05/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/04/2026
Special inspection requirement — Air barrier - visual inspection
05/04/2026
Special inspection requirement — Structural Steel - Details
05/04/2026
Special inspection requirement — Ventilation and air distribution system
05/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSTREAM ROCK CONTSRUCTION*06/26/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/25/2026Subgrade Inspections—special
06/25/2026Fire-Resistance Rated Construction—progress
06/25/2026Energy Code Compliance Inspections—progress
06/25/2026Structural Steel - Welding—special
06/25/2026Structural Steel - High Strength Bolting—special
06/25/2026Fire-Resistant Penetrations and Joints—special
06/25/2026Excavations - Sheeting, Shoring, and Bracing—special
06/25/2026Concrete - Cast-In-Place—special
06/25/2026Heating Systems—special
06/25/2026Construction Operations Influencing Adjacent Structures—special
06/18/2026Subsurface Investigations (Borings/Test Pits)—special
05/22/2026Duct leakage testing, insulation and design—energy_progress
05/22/2026Electric vehicle service equipment requirements—energy_progress
05/22/2026Metering—energy_progress
05/22/2026Maintenance information—energy_progress
05/22/2026Interior lighting power—energy_progress
05/09/2026Excavations - Sheeting, Shoring, and Bracing—special
05/09/2026HVAC-R and service water heating system controls—energy_progress
05/09/2026HVAC-R and service water piping design and insulation—energy_progress
05/09/2026Maintenance information—energy_progress
05/09/2026HVAC-R and service water heating equipment—energy_progress
05/09/2026Energy Code Compliance Inspections—progress
05/09/2026Subsurface Investigations (Borings/Test Pits)—special
05/09/2026Fire-Resistant Penetrations and Joints—special
05/09/2026Sprinkler Systems—special
Latest 25 of 43.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026Q01348588-S3Request digital key ↗
08/16/2026Q01348588-S2Request digital key ↗
08/16/2026Q01348588-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01348588-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01348588-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026Q01348588-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026Q01348588-S3Open ↗
08/16/2026Q01348588-S2Open ↗
08/16/2026Q01348588-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/29/2026Q01348588-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/16/2026Q01348588-S1Open ↗
08/16/2026Q01348588-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/16/2026Q01348588-S1Open ↗
08/16/2026Q01348588-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/16/2026Q01348588-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01348588-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01348588-I1Open ↗