Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF MINI/SPYDER CRANE AS PER PLANS SUBMITTED. MINI/SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
On file for this project
14 documents · 1 drawing sheet
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 141 filing · 4 docs
ArchitecturePlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF MINI/SPYDER CRANE AS PER PLANS SUBMITTED. MINI/SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents
Floor 131p · 2 filings · 4 docs
ArchitectureElectricalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF MINI/SPYDER CRANE AS PER PLANS SUBMITTED. MINI/SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents
INSTALLATION AND USE OF MINI CRANE AS PER PLANS SUBMITTED. MINI CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE INOCCUPANCY, USE OR EGRESS.
On file for this project
6 documents · 1 drawing sheet
Floor 123p · 4 filings · 4 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF MINI/SPYDER CRANE AS PER PLANS SUBMITTED. MINI/SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 114p · 4 filings · 4 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF MINI/SPYDER CRANE AS PER PLANS SUBMITTED. MINI/SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 104p · 4 filings · 4 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF MINI/SPYDER CRANE AS PER PLANS SUBMITTED. MINI/SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 43p · 3 filings
Fire ProtectionMechanicalPlumbingStructural
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 1 drawing sheet
FILING OF FUEL OIL STORAGE SYSTEM AND PIPING FOR PROPOSED 14-STORY, OFFICE BUILDING. REFER TO NB # 421767993 FOR ALL ZONING & ARCHITECTURAL ASPECTS OF THE PROJECT.
On file for this project
3 documents · 1 drawing sheet
Floor 34p · 5 filings
Fire ProtectionMechanicalPlumbingStructural
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 1 drawing sheet
FILING OF FUEL OIL STORAGE SYSTEM AND PIPING FOR PROPOSED 14-STORY, OFFICE BUILDING. REFER TO NB # 421767993 FOR ALL ZONING & ARCHITECTURAL ASPECTS OF THE PROJECT.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 23p · 3 filings
Fire ProtectionMechanicalPlumbingStructural
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 1 drawing sheet
FILING OF FUEL OIL STORAGE SYSTEM AND PIPING FOR PROPOSED 14-STORY, OFFICE BUILDING. REFER TO NB # 421767993 FOR ALL ZONING & ARCHITECTURAL ASPECTS OF THE PROJECT.
On file for this project
3 documents · 1 drawing sheet
Floor 14p · 5 filings · 14 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
On file for this project
14 documents
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Cellar3p · 3 filings
Fire ProtectionMechanicalPlumbingStructural
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 1 drawing sheet
FILING OF FUEL OIL STORAGE SYSTEM AND PIPING FOR PROPOSED 14-STORY, OFFICE BUILDING. REFER TO NB # 421767993 FOR ALL ZONING & ARCHITECTURAL ASPECTS OF THE PROJECT.
On file for this project
3 documents · 1 drawing sheet
Basement3p · 3 filings
Fire ProtectionMechanicalPlumbingStructural
INSTALLATION OF COMBINATION STANDPIPE AND SPRINKLER SYSTEM WITH SPECIAL SERVICE FIRE PUMP FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB# 421767993
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PRESSURIZED DRY STANDPIPE SYSTEM WITH ALARM FOR PROPOSED 14 STORY OFFICE BUILDING, IN CONJUNCTION TO NB # 421767993
On file for this project
3 documents · 1 drawing sheet
FILING OF FUEL OIL STORAGE SYSTEM AND PIPING FOR PROPOSED 14-STORY, OFFICE BUILDING. REFER TO NB # 421767993 FOR ALL ZONING & ARCHITECTURAL ASPECTS OF THE PROJECT.
On file for this project
3 documents · 1 drawing sheet
Site & exterior2 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · Supported Scaffold
installation of construction fence, to protect site during full demolition of structure.
On file for this project
9 documents · 5 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
On file for this project
14 documents · 12 drawing sheets