← Back
Three families
37-21 GREENPOINT AVENUE
QUEENS · BIN 4535366
💬 Discuss this project
1996Year Built
3Stories
C0Building Class
R5Zoning
2,902 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,300 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingLandscape
Floor 32p · 2 filings · 20 docs
Floor 2
Floor 1
Cellar4p · 2 filings · 20 docs
1 job · most recent 12/09/2021
General Wiring Lighting
FiledStatusContractorScope
12/09/2021CompleteBDS ELECTRIC CORP.General Wiring, Lighting
Building Lifecycle
All (60)Filed (8)Permit Issued (5)Signed Off (2)Violation (4)Inspection (7)Objection (4)Special Inspection (30)
10/26/2023
Signed off — Alteration
2 N. GAS WHT, 2 N.GAS BOILERS, N. DRYER, N. WASHING N. 1 FD. REP. UTILITY SINK, & LAV ON EX. ROUGH @ CELL LEVEL.1 N. FD., REP. RESIDENTIAL SINK, TOILET, BATHTUB,LAV & DISHWASHER ON EX. ROUGH @ 1ST. N. FD. REP. BU TTUB,TOILET & LAV. @2FL. 2 N. FD. @3RD FL
Q00513455-I1
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
09/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/26/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
09/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/20/2023
Filed — Alteration
2 N. GAS WHT, 2 N.GAS BOILERS, N. DRYER, N. WASHING N. 1 FD. REP. UTILITY SINK, & LAV ON EX. ROUGH @ CELL LEVEL.1 N. FD., REP. RESIDENTIAL SINK, TOILET, BATHTUB,LAV & DISHWASHER ON EX. ROUGH @ 1ST. N. FD. REP. BU TTUB,TOILET & LAV. @2FL. 2 N. FD. @3RD FL
Q00513455-P5
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/20/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
09/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/24/2023
Filed — Alteration
2 N. GAS WHT, 2 N.GAS BOILERS, N. DRYER, N. WASHING N. 1 FD. REP. UTILITY SINK, & LAV ON EX. ROUGH @ CELL LEVEL.1 N. FD., REP. RESIDENTIAL SINK, TOILET, BATHTUB,LAV & DISHWASHER ON EX. ROUGH @ 1ST. N. FD. REP. BU TTUB,TOILET & LAV. @2FL. 2 N. FD. @3RD FL
Q00513455-P4
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
08/21/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
08/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
08/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
10/17/2022
Filed — Alteration
2 N. GAS WHT, 2 N.GAS BOILERS, N. DRYER, N. WASHING N. 1 FD. REP. UTILITY SINK, & LAV ON EX. ROUGH @ CELL LEVEL.1 N. FD., REP. RESIDENTIAL SINK, TOILET, BATHTUB,LAV & DISHWASHER ON EX. ROUGH @ 1ST. N. FD. REP. BU TTUB,TOILET & LAV. @2FL. 2 N. FD. @3RD FL
Q00513455-P3
08/03/2022
Signed off — Alteration
CREATE PARTITIONS TO ENCLOSE BOILER & LAUNDRY ROOM, REPAIR EX. WALLS & PAINT AT CEL. CREATE SMALL CLOSET, REPAIR WALLS & PAINT AT 1ST FL.REMOVE NON-LOAD BEARINGS PARTITIONS &REPAIR EXISTING WALLS AT 2,3 FL NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION
Q00513053-I1
04/08/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/29/2022
Objection resolved — Addressed
03/23/2022
Objection raised — Scope
03/22/2022
Objection resolved — Addressed
03/10/2022
Violation issued (HPD, closed)
A
03/02/2022
Objection raised — Scope
03/01/2022
Filed — Alteration
CREATE PARTITIONS TO ENCLOSE BOILER & LAUNDRY ROOM, REPAIR EX. WALLS & PAINT AT CEL. CREATE SMALL CLOSET, REPAIR WALLS & PAINT AT 1ST FL.REMOVE NON-LOAD BEARINGS PARTITIONS &REPAIR EXISTING WALLS AT 2,3 FL NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION
Q00513053-P2
02/25/2022
Special inspection requirement — Interior lighting power
Roxana Escobar
02/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
02/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
02/25/2022
Special inspection requirement — Final
Roxana Escobar
02/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
Roxana Escobar
02/08/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/07/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/26/2022
Filed — Alteration
CREATE PARTITIONS TO ENCLOSE BOILER & LAUNDRY ROOM, REPAIR EX. WALLS & PAINT AT CEL. CREATE SMALL CLOSET, REPAIR WALLS & PAINT AT 1ST FL.REMOVE NON-LOAD BEARINGS PARTITIONS &REPAIR EXISTING WALLS AT 2,3 FL NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION
Q00513053-P1
01/20/2022
Permit issued — Plumbing
Q00513455-I1-PL
10/18/2021
Permit issued — General Construction
Q00513053-I1-GC
07/15/2021
Filed — Alteration
2 N. GAS WHT, 2 N.GAS BOILERS, N. DRYER, N. WASHING N. 1 FD. REP. UTILITY SINK, & LAV ON EX. ROUGH @ CELL LEVEL.1 N. FD., REP. RESIDENTIAL SINK, TOILET, BATHTUB,LAV & DISHWASHER ON EX. ROUGH @ 1ST. N. FD. REP. BU TTUB,TOILET & LAV. @2FL. 2 N. FD. @3RD FL
Q00513455-P2
06/25/2021
Permit issued — General Construction
Q00513053-I1-GC
06/24/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/24/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/22/2021
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
06/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/22/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
06/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/04/2021
Permit issued — General Construction
Q00513053-I1-GC
05/27/2021
Permit issued — Plumbing
Q00513455-I1-PL
05/08/2021
Filed — Alteration
2 N. GAS WHT, 2 N.GAS BOILERS, N. DRYER, N. WASHING N. 1 FD. REP. UTILITY SINK, & LAV ON EX. ROUGH @ CELL LEVEL.1 N. FD., REP. RESIDENTIAL SINK, TOILET, BATHTUB,LAV & DISHWASHER ON EX. ROUGH @ 1ST. N. FD. REP. BU TTUB,TOILET & LAV. @2FL. 2 N. FD. @3RD FL
Q00513455-I1
05/08/2021
Filed — Alteration
CREATE PARTITIONS TO ENCLOSE BOILER & LAUNDRY ROOM, REPAIR EX. WALLS & PAINT AT CEL. CREATE SMALL CLOSET, REPAIR WALLS & PAINT AT 1ST FL.REMOVE NON-LOAD BEARINGS PARTITIONS &REPAIR EXISTING WALLS AT 2,3 FL NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION
Q00513053-I1
04/20/2021
Violation issued (HPD, closed)
A
11/06/2019
Violation issued (HPD, closed)
I
11/29/2016
Violation issued (HPD, closed)
I
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEPT OF HOUSING PRES DEV103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSTSCAPE809/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPEEDWAY CONSTRUCTION CORGeneral Contractor207/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing207/08/2026
CHRISTIAN G'NRL CONST CORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519809/20/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP01/20/2022
DOB NOWGeneral ConstructionSigned-offCHRISTIAN G'NRL CONST COR10/18/2021
DOB NOWGeneral ConstructionSigned-offSPEEDWAY CONSTRUCTION COR06/25/2021
DOB NOWGeneral ConstructionSigned-offSPEEDWAY CONSTRUCTION COR06/04/2021
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP05/27/2021
BIS—ISSUEDCIAMPA MANAGEMENT CORP.01/24/1997
BISPLISSUEDD & G PLUMBING CO. INC10/03/1996
BIS—ISSUEDCIAMPA MANAGEMENT CORP.07/19/1996
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/08/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/08/2022Fail-Final General Construction Non-Directive 14FailView ↗
02/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/26/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/26/2023Energy Code Compliance InspectionsRoxana Escobarprogress
09/26/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/26/2023Maintenance informationYounes Abouyaalaenergy_progress
09/26/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/26/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/20/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/20/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/20/2023Energy Code Compliance InspectionsRoxana Escobarprogress
09/20/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/20/2023Maintenance informationYounes Abouyaalaenergy_progress
09/20/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/21/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/21/2023Energy Code Compliance InspectionsRoxana Escobarprogress
08/21/2023Maintenance informationYounes Abouyaalaenergy_progress
08/21/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
08/21/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/21/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
02/25/2022Interior lighting powerRoxana Escobarenergy_progress
02/25/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/25/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
02/25/2022Energy Code Compliance InspectionsRoxana Escobarprogress
02/25/2022FinalRoxana Escobarprogress
02/25/2022Fire-Resistance Rated ConstructionRoxana Escobarprogress
06/22/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 30.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00513455-P5Request digital key ↗
08/27/2026Q00513455-P4Request digital key ↗
08/27/2026Q00513455-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026Q00513455-P2Open ↗
09/02/2026Q00513455-P2Open ↗
08/25/2026Q00513455-P5Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00513455-I1Open ↗
08/27/2026Q00513455-P5Open ↗
08/27/2026Q00513455-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q00513455-P2Open ↗
08/25/2026Q00513455-P5Open ↗
08/25/2026Q00513455-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00513455-I1Open ↗
08/13/2026Q00513053-I1Open ↗