0 Active Violations
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofParksite Constr. CORP35p · 3 filings · 20 docs
BulkheadParksite Constr. CORP5p · 3 filings · 20 docs
Floor 7Parksite Constr. CORP56p · 4 filings · 20 docs
Floor 6Parksite Constr. CORP50p · 4 filings · 20 docs
Floor 5Parksite Constr. CORP54p · 4 filings · 20 docs
Floor 4Parksite Constr. CORP49p · 4 filings · 20 docs
Floor 3Parksite Constr. CORP54p · 4 filings · 20 docs
Floor 2Parksite Constr. CORP49p · 4 filings · 20 docs
Floor 1Parksite Constr. CORP55p · 6 filings · 20 docs
CellarParksite Constr. CORP41p · 4 filings · 20 docs
Site & exteriorSidewalk shed22p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Wilbee503/21/2026
Crescent Street Realty Associate403/21/2026
37-26 30th Street203/21/2026
Enterprise Cleaners103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Structural Engineering Technologies201/30/2025
Costa Arch & Engineering802/24/2023
Paul Perdek, Prof. Engineering512/09/2021
Royal T&E102/15/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1003/21/2026
Costa1803/21/2026
Meltzer/Costa & Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Park ConstructionScaffold1007/08/2026
Park ConstructionGeneral Contractor807/08/2026
Pal-Mar Plumbing & HeatingPlumbing407/08/2026
Core Scaffold SystemsScaffold307/08/2026
Triera ContractingScaffold303/21/2026
Rael Automatic Sprinkler CoFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks317601/30/2025
Macia Inspection & Testin402201/19/2023
Building Lifecycle
All (168)Filed (16)Permit Issued (21)Signed Off (8)Violation (60)Inspection (7)Objection (32)Special Inspection (24)
11/21/2025
Violation issued (HPD, closed)
I
05/15/2025
Signed off — Alteration
APPLICATION HEREWITH FILING FOR THE STRUCTURAL COMPONENTS FOR THE PROPOSE NEW BUILDINGS FOR DOB APPLICATION NO 420666014.
Q00188891-I1
02/14/2025
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
02/14/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
01/30/2025
Filed — Alteration
APPLICATION HEREWITH FILING FOR THE STRUCTURAL COMPONENTS FOR THE PROPOSE NEW BUILDINGS FOR DOB APPLICATION NO 420666014.
Q00188891-P1
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2023
Signed off — Alteration
Q00106443-I1
08/08/2023
Signed off — Alteration
Q00264564-I1
08/03/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/28/2023
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEM FOR NB APPLICATION NO.420666014
Q00192937-I1
07/26/2023
Signed off — Alteration
INSTALLATION OF NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR A NEW RESIDENTIAL CONSTRUCTION.
Q00198453-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/04/2023
Permit issued — Curb Cut
Q00264564-I1-CC
04/04/2023
Permit issued — Structural
Q00188891-I1-ST
03/23/2023
Permit issued — Standpipe
Q00198453-I1-PL
02/28/2023
Special inspection requirement — Sprinkler Systems
MIKHAIL ZEYGMAN
02/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
02/28/2023
Special inspection requirement — Standpipe Systems
MIKHAIL ZEYGMAN
02/24/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR A NEW RESIDENTIAL CONSTRUCTION.
Q00198453-P3
01/31/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
01/27/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
01/19/2023
Filed — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEM FOR NB APPLICATION NO.420666014
Q00192937-P1
01/13/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR A NEW RESIDENTIAL CONSTRUCTION.
Q00198453-P2
12/29/2022
Special inspection requirement — Standpipe Systems
MIKHAIL ZEYGMAN
12/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
12/29/2022
Special inspection requirement — Sprinkler Systems
MIKHAIL ZEYGMAN
11/29/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/29/2022
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
11/29/2022
Special inspection requirement — Final
MIKHAIL ZEYGMAN
11/29/2022
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
11/28/2022
Permit issued — Sprinklers
Q00198453-I1-PL
11/23/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/23/2022
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
11/22/2022
Objection resolved — Addressed
11/18/2022
Objection raised — Other
11/09/2022
Filed — Alteration
INSTALLATION OF NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEMS FOR A NEW RESIDENTIAL CONSTRUCTION.
Q00198453-P1
11/07/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00131534-I1
10/28/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00530538-I1
10/27/2022
Signed off — Alteration
Q00495272-I1
10/19/2022
Permit issued — Sprinklers
Q00198453-I1-EW-SP
10/19/2022
Permit issued — Sprinklers
Q00198453-I1-EW-SD
07/27/2022
Special inspection requirement — Permanent certificate
Jeffrey Stones
07/27/2022
Special inspection requirement — Electrical motors
Jeffrey Stones
07/27/2022
Special inspection requirement — Duct leakage testing
Jeffrey Stones
07/27/2022
Special inspection requirement — Heating Systems
Jeffrey Stones
07/27/2022
Special inspection requirement — Mechanical Systems
Jeffrey Stones
07/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
07/27/2022
Special inspection requirement — Final
Jeffrey Stones
07/27/2022
Special inspection requirement — HVAC and service water heating equipment
Jeffrey Stones
07/27/2022
Special inspection requirement — HVAC insulation and sealing
Jeffrey Stones
07/27/2022
Special inspection requirement — HVAC and service water heating system controls
Jeffrey Stones
07/27/2022
Special inspection requirement — Maintenance information
Jeffrey Stones
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPark Construction04/04/2023
DOB NOWStructuralSigned-offPark Construction04/04/2023
DOB NOWPlumbingSigned-offPal-Mar Plumbing & Heating03/23/2023
DOB NOWPlumbingSigned-offPal-Mar Plumbing & Heating11/28/2022
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co10/19/2022
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co10/19/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/07/2022
DOB NOWConstruction FenceSigned-offPark Construction12/20/2021
DOB NOWMechanical SystemsSigned-offPark Construction12/20/2021
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems06/14/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/14/2021
DOB NOWPlumbingSigned-offPal-Mar Plumbing & Heating03/18/2021
DOB NOWMechanical SystemsSigned-offPark Construction12/22/2020
DOB NOWConstruction FenceSigned-offPark Construction12/21/2020
DOB NOWPlumbingSigned-offPal-Mar Plumbing & Heating12/07/2020
DOB NOWMechanical SystemsSigned-offPark Construction09/23/2020
DOB NOWConstruction FenceSigned-offPark Construction09/22/2020
DOB NOWConstruction FenceSigned-offPark Construction12/11/2019
DOB NOWConstruction FenceSigned-offPark Construction09/13/2019
DOB NOWConstruction FenceSigned-offPark Construction02/26/2019
DOB NOWSidewalk ShedSigned-offTriera Contracting02/21/2019
BIS—ISSUEDPark Construction09/14/2022
BIS—ISSUEDPark Construction09/24/2021
BIS—ISSUEDPark Construction09/24/2020
BIS—ISSUEDPark Construction08/26/2020
BIS—ISSUEDSano Wrecking03/25/2019
BISOTISSUEDHercules Machinery05/02/2017
BISEQISSUEDRockledge Scaffold01/07/2008
BISMHISSUEDNorthern BLVD . Glass & Interior05/18/1999
BISFSISSUEDAmbassador Fuel and Oil06/11/1998
BISBLISSUEDDual Fuel Plumbing & Heating08/22/1997
BISPLISSUEDPlumbing & Heating Doctor04/16/1996
BISOTISSUEDLaundercenter D/B/A/ Fed Machine03/22/1996
5 projects · most recent 11/07/2022
General Wiring
FiledStatusContractorScope
11/07/2022CompleteG. G. ElectricGeneral Wiring
09/27/2021CompleteTuxedo Electrical Contracting—
03/31/2021CompleteV. Vass Electric—
10/01/2019CompleteG. G. Electric1 meters, 1 new_meters
02/20/2019CompleteMeo Electric—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/03/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
01/31/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/27/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/29/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/23/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/23/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
02/14/2025Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
02/14/2025FinalMIKHAIL ZEYGMANprogress
02/28/2023Sprinkler SystemsMIKHAIL ZEYGMANspecial
02/28/2023Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
02/28/2023Standpipe SystemsMIKHAIL ZEYGMANspecial
12/29/2022Standpipe SystemsMIKHAIL ZEYGMANspecial
12/29/2022Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
12/29/2022Sprinkler SystemsMIKHAIL ZEYGMANspecial
11/29/2022FinalMIKHAIL ZEYGMANprogress
11/29/2022Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
07/27/2022Permanent certificateJeffrey Stonesenergy_progress
07/27/2022Electrical motorsJeffrey Stonesenergy_progress
07/27/2022Duct leakage testing Jeffrey Stonesenergy_progress
07/27/2022Heating SystemsJeffrey Stonesspecial
07/27/2022Mechanical SystemsJeffrey Stonesspecial
07/27/2022Energy Code Compliance InspectionsJeffrey Stonesprogress
07/27/2022FinalJeffrey Stonesprogress
07/27/2022HVAC and service water heating equipment Jeffrey Stonesenergy_progress
07/27/2022HVAC insulation and sealing Jeffrey Stonesenergy_progress
07/27/2022HVAC and service water heating system controls Jeffrey Stonesenergy_progress
07/27/2022Maintenance informationJeffrey Stonesenergy_progress
07/27/2022Shutoff dampersJeffrey Stonesenergy_progress
12/11/2021FinalPaul Perdekprogress
06/09/2021FinalPaul Perdekprogress
▾Documents — 311 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch6
08/28/2026Q00106443-I1Request digital key ↗
08/27/2026Q00495272-I1Request digital key ↗
08/27/2026Q00495272-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/25/2026Q00198453-P3Request digital key ↗
08/25/2026Q00198453-P1Request digital key ↗
08/15/2026Q00198453-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026Q00198453-P2Request digital key ↗
08/25/2026Q00198453-P1Request digital key ↗
08/25/2026Q00198453-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
08/25/2026Q00198453-P3Request digital key ↗
08/25/2026Q00198453-P1Request digital key ↗
08/15/2026Q00198453-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/28/2026Q00188891-I1Request digital key ↗
08/15/2026Q00188891-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00192937-I1Request digital key ↗
08/28/2026Q00192937-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00131534-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/28/2026Q00264564-I1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION39
04/11/2025440574399Open ↗
02/05/2025420666014Open ↗
01/15/2025420666014Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION7
10/12/2021420666014Open ↗
11/04/2020420666014Open ↗
11/04/2020420666014Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
07/01/2022440698924Open ↗
12/14/2021440698924Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
04/10/2023420666014Open ↗
12/31/2019420666014Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
09/17/2022421811374Open ↗
12/31/2019420666014Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/10/2023420666014Open ↗
▸BISRESTRICTION: EASEMENT AGREEMENT1
04/14/2025420666014Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/25/2020420666014Open ↗
▸BISVERIFY TAX LOT1
04/10/2023420666014Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
06/03/2020420666014Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00106443-I1Open ↗
08/28/2026Q00264564-I1Open ↗
08/28/2026Q00188891-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/29/2026Q00530538-I1Open ↗
09/01/2026Q00495272-I1Open ↗
08/28/2026Q00192937-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/28/2026Q00192937-P1Open ↗
08/28/2026Q00192937-P1Open ↗
08/27/2026Q00198453-P2Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
08/10/2020420666014Open ↗
08/10/2020420666014Open ↗
08/10/2020420666014Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/14/2021440698924Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/14/2021440698924Open ↗
▸Trade Schedules & Equipment6
▸BISELECTRIC CUT-OFF1
03/28/2019421682003Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
04/10/2023420666014Open ↗
▸BISSEWER CUT-OFF1
03/28/2019421682003Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/10/2023420666014Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
04/10/2023420666014Open ↗
▸Safety & Tenant Protection16
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
08/10/2020420666014Open ↗
07/28/2020420666014Open ↗
04/02/2019421682003Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST4
07/01/2022440698924Open ↗
07/01/2022440698924Open ↗
03/29/2022440698924Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN2
08/04/2025440698924Open ↗
04/10/2025420666014Open ↗
▸BISSTREET TREE SIGNOFF2
06/05/2025440698924Open ↗
04/22/2025420666014Open ↗
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/10/2020420666014Open ↗
▸Environmental & Asbestos17
▸DOB NOWOER: Notice to Proceed9
08/28/2026Q00188891-I1Open ↗
08/25/2026Q00198453-P2Open ↗
08/25/2026Q00198453-P1Open ↗
Showing 3 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
12/14/2021440698924Open ↗
12/31/2019420666014Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
06/05/2025440698924Open ↗
05/02/2023420666014Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/02/2019421682003Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q00188891-I1Open ↗
08/13/2026Q00198453-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/10/2020420666014Open ↗
08/03/2020420666014Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/23/2023420666014Open ↗
04/02/2020420666014Open ↗
▸BISINTERIOR LIGHTING POWER1
04/10/2023420666014Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/01/2023420666014Open ↗
▸BISFENESTRATION AREAS1
02/01/2023420666014Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/10/2023420666014Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY6
03/23/2023420666014Open ↗
07/08/2020420666014Open ↗
04/02/2020420666014Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION4
08/10/2020420666014Open ↗
04/02/2020420666014Open ↗
12/31/2019420666014Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHydrant Flow Test Letter4
08/25/2026Q00198453-P3Open ↗
08/25/2026Q00198453-P2Open ↗
08/25/2026Q00198453-P1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: FIELD INSPECTION1
08/04/2025440698924Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/01/2023420666014Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/01/2023420666014Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/01/2023420666014Open ↗
▸BISMASONRY1
04/12/2023420666014Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q00188891-I1Open ↗
▸Approvals, Objections & Sign-offs29
▸BISSCHEDULE A - OCCUPANCY / USE20
02/05/2025420666014Open ↗
01/15/2025420666014Open ↗
12/27/2024420666014Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
10/05/2022421811374Open ↗
10/05/2022421811374Open ↗
09/27/2022421811374Open ↗
Showing 3 of 8 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
03/28/2019421682003Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/10/2020420666014Open ↗
07/10/2020420666014Open ↗
03/28/2019421682003Open ↗
▸BISCOST AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
08/04/2025440698924Open ↗
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION14
05/17/2023420666014Open ↗
04/10/2023440698924Open ↗
04/10/2023440698924Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET5
10/05/2022421811374Open ↗
09/17/2019420666014Open ↗
07/01/2019420666014Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
10/05/2022421811374Open ↗
11/04/2020420666014Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/14/2021440698924Open ↗
▸Other Documents10
▸DOB NOWHydraulic Calculations4
08/25/2026Q00198453-P2Open ↗
08/25/2026Q00198453-P1Open ↗
08/14/2026Q00198453-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
09/27/2022421811374Open ↗
03/25/2020420666014Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
08/04/2025440698924Open ↗
▸BISVESTIBULES1
02/01/2023420666014Open ↗
▸BISMAINTENANCE INFORMATION1
04/10/2023420666014Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026Q00131534-I1Open ↗