← Back
BuildNYC
Two stories - detached, small or mid-size
37-35 LITTLE NECK PARKWAY
QUEENS · BIN 4169696
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2AZoning
1,068 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 9,420 sf lot · 0.11 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 11 docs
Attic1 filing · 11 docs
Floor 21 filing · 11 docs
Floor 11 filing · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2022$980K—Private party → Private party$918/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Fang Architect209/08/2026
Building Lifecycle
09/08/2026
Filed — Alteration
HORIZONTAL EXTENSION TO EXISTING 1-FAMILY BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
Q01311961-S1
08/04/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/29/2026
Objection resolved — Addressed
07/13/2026
Objection raised — Scope
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDMRM Development03/08/2012
BIS—ISSUEDD G Construction08/12/1997
1 project · most recent 09/08/2026
Steel Wood
FiledStatusContractorScope
09/08/2026——Steel, Wood
1 project · most recent 09/08/2026
Fence
FiledStatusContractorScope
09/08/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/04/2026Structural Steel - High Strength Bolting—special
10/31/2025Concrete - Cast-In-Place—special
10/31/2025Excavations - Sheeting, Shoring, and Bracing—special
10/31/2025Fire-Resistant Penetrations and Joints—special
10/31/2025Masonry—special
10/31/2025Structural Stability – Alterations of existing buildings—special
10/31/2025Structural Steel - Details—special
10/31/2025Energy Code Compliance Inspections—progress
10/31/2025Fire-Resistance Rated Construction—progress
10/31/2025Structural Wood Frame—progress
10/31/2025Final—progress
10/31/2025Footing and Foundation—progress
10/31/2025Fenestration air leakage—energy_progress
10/31/2025Air barrier - visual inspection—energy_progress
10/31/2025Fenestration and door U-factor and product ratings—energy_progress
10/31/2025Insulation placement and R values—energy_progress
10/31/2025Interior lighting power—energy_progress
10/31/2025Maintenance information—energy_progress
10/31/2025Fenestration areas—energy_progress
30 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account