← Back
Two family brick
37-39 77 STREET
QUEENS · BIN 4029911
💬 Discuss this project
1930Year Built
2.75Stories
B1Building Class
R5Zoning
3,385 sfGross Floor Area
2Units
Rent Stabilized12 Open Violations ▸
Two family brick · Owner of record: 37-39 77TH STREET LLC · 2,758 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 11 docs
Floor 33p · 2 filings · 20 docs
Floor 21p · 1 filing · 18 docs
Floor 1
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THIND BUILDERS NY1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2022$1.6M—— → —$458/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.604/04/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HARRY'S DESIGN INCGeneral Contractor203/21/2026
CYCLURA PLBG & HTG INCPlumbing207/08/2026
PAC ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177404/04/2024
BUTTERFIELD & O'CONNOR4189211/08/2023
Building Lifecycle
All (61)Filed (6)Permit Issued (3)Signed Off (2)Violation (18)Inspection (6)Objection (2)Special Inspection (24)
11/25/2025
Violation issued (HPD, closed)
I
12/04/2024
Violation issued (HPD, closed)
I
08/13/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00802965
Q00802981-I1
06/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2024
Permit issued — Plumbing
Q00802981-I1-PL
04/04/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00802965
Q00802981-P3
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
04/04/2024
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
04/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
04/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
04/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
01/24/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00802965
Q00802981-P2
12/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/11/2023
Signed off — Alteration
PROP. INTERIOR RENOVATION OF EXIST. 3 STORY WITH CELLAR, 2 FAMILY BUILDING, CONSISTING OF REPAIR AND REPLACEMENT OF INTERIOR PARTITIONS, WINDOWS, DOORS, WOOD FLOORING, BATHROOM FIXTURES AND KITCHEN CABINETS. NO CHANGE IN BULK, USE EGRESS OR OCCUPANCY
Q00802965-I1
12/08/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
11/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
11/27/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN T. O'CONNOR
11/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
11/27/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
BRIAN T. O'CONNOR
11/27/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
11/27/2023
Special inspection requirement — Preliminary
BRIAN T. O'CONNOR
11/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN T. O'CONNOR
11/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
11/08/2023
Filed — Alteration
PROP. INTERIOR RENOVATION OF EXIST. 3 STORY WITH CELLAR, 2 FAMILY BUILDING, CONSISTING OF REPAIR AND REPLACEMENT OF INTERIOR PARTITIONS, WINDOWS, DOORS, WOOD FLOORING, BATHROOM FIXTURES AND KITCHEN CABINETS. NO CHANGE IN BULK, USE EGRESS OR OCCUPANCY
Q00802965-P1
11/08/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00802965
Q00802981-P1
11/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
BRIAN T. O'CONNOR
11/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
11/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN T. O'CONNOR
11/08/2023
Special inspection requirement — Preliminary
BRIAN T. O'CONNOR
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
11/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
09/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/17/2023
Permit issued — Plumbing
Q00802981-I1-PL
03/20/2023
Permit issued — General Construction
Q00802965-I1-GC
02/15/2023
Objection raised — Scope
02/15/2023
Objection resolved — Addressed
02/07/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH ALTERATION APPLICATION # Q00802965
Q00802981-I1
02/07/2023
Filed — Alteration
PROP. INTERIOR RENOVATION OF EXIST. 3 STORY WITH CELLAR, 2 FAMILY BUILDING, CONSISTING OF REPAIR AND REPLACEMENT OF INTERIOR PARTITIONS, WINDOWS, DOORS, WOOD FLOORING, BATHROOM FIXTURES AND KITCHEN CABINETS. NO CHANGE IN BULK, USE EGRESS OR OCCUPANCY
Q00802965-I1
07/08/2022
Violation issued (HPD, closed)
I
07/06/2022
Violation issued (HPD, closed)
C
07/06/2022
Violation issued (HPD, open)
C
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, open)
C
07/06/2022
Violation issued (HPD, open)
B
07/06/2022
Violation issued (HPD, closed)
C
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCYCLURA PLBG & HTG INC05/21/2024
DOB NOWPlumbingSigned-offCYCLURA PLBG & HTG INC05/17/2023
DOB NOWGeneral ConstructionSigned-offHARRY'S DESIGN INC03/20/2023
1 project · most recent 09/12/2023
General Wiring
FiledStatusContractorScope
09/12/2023CompletePAC ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/08/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/04/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
04/04/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
04/04/2024HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
04/04/2024HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
04/04/2024HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
11/27/2023HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
11/27/2023HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
11/27/2023Fenestration and door U-factor and product ratingsBRIAN T. O'CONNORenergy_progress
11/27/2023Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
11/27/2023Construction Operations Influencing Adjacent StructuresBRIAN T. O'CONNORspecial
11/27/2023Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
11/27/2023PreliminaryBRIAN T. O'CONNORprogress
11/27/2023Fire-Resistance Rated ConstructionBRIAN T. O'CONNORprogress
11/27/2023HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
11/08/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
11/08/2023Construction Operations Influencing Adjacent StructuresBRIAN T. O'CONNORspecial
11/08/2023Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
11/08/2023Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
11/08/2023Fire-Resistance Rated ConstructionBRIAN T. O'CONNORprogress
11/08/2023PreliminaryBRIAN T. O'CONNORprogress
11/08/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
11/08/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
11/08/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
11/08/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026Q00802965-P1Request digital key ↗
08/23/2026Q00802981-P2Request digital key ↗
08/23/2026Q00802981-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
08/30/2026Q00802965-I1Open ↗
08/30/2026Q00802965-I1Open ↗
08/28/2026Q00802965-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q00802965-I1Open ↗
08/23/2026Q00802981-P2Open ↗
08/23/2026Q00802981-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026Q00802965-I1Open ↗
08/28/2026Q00802965-P1Open ↗
08/27/2026Q00802981-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026Q00802981-P2Open ↗
08/23/2026Q00802981-P1Open ↗
08/23/2026Q00802981-I1Open ↗
Showing 3 of 6 on file for this type