← Back
Parsonage, rectory
37-57 104 STREET
QUEENS · BIN 4044547
💬 Discuss this project
1931Year Built
2Stories
M3Building Class
R5AZoning
2,016 sfGross Floor Area
0Units
2 Open Violations ▸
Parsonage, rectory · 3,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALAN YANG ARCHITECTURE DPC110/01/2025
HWL ENGINEERING PC709/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HCNY MANAGEMENT1403/21/2026
LEADING GREEN ENERGY CONSTRUCTION103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJK BUILDING CONSULTINGGeneral Contractor307/08/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
LEADING GREEN ENERGY CONGeneral Contractor104/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN YANG ARCHITECTURE9490110/01/2025
HWL ENGINEERING PC3894609/12/2024
Building Lifecycle
All (59)Filed (8)Permit Issued (4)Signed Off (3)Violation (15)Inspection (6)Special Inspection (23)
07/07/2026
Signed off — Alteration
Solar panel installation on roof.
Q01279393-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2025
Permit issued — Solar
Q01279393-I1-SL
10/01/2025
Filed — Alteration
Solar panel installation on roof.
Q01279393-I1
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
08/28/2025
Special inspection requirement — Air barrier - visual inspection
Alan Yang
08/28/2025
Special inspection requirement — Final
Alan Yang
08/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
08/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alan Yang
01/24/2025
Violation issued (ECB, closed)
Unknown
01/06/2025
Signed off — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-S1
01/06/2025
Signed off — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-I1
11/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/24/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2024
Filed — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-P4
09/11/2024
Special inspection requirement — Maintenance information
WANLONG HE
09/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
09/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WANLONG HE
09/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
WANLONG HE
08/07/2024
Filed — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-P3
07/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WANLONG HE
07/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
07/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
WANLONG HE
07/26/2024
Special inspection requirement — Maintenance information
WANLONG HE
07/15/2024
Filed — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-P2
07/15/2024
Special inspection requirement — Maintenance information
WANLONG HE
07/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
WANLONG HE
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
07/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WANLONG HE
06/28/2024
Filed — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-P1
06/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
WANLONG HE
06/24/2024
Special inspection requirement — Maintenance information
WANLONG HE
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
06/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WANLONG HE
06/05/2024
Permit issued — General Construction
Q01027633-I1-GC
05/29/2024
Permit issued — Curb Cut
Q01027633-S2-CC
05/20/2024
Permit issued — Plumbing
Q01027633-S1-PL
04/26/2024
Filed — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-S1
04/26/2024
Filed — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-I1
04/26/2024
Filed — Alteration
Interior renovation of cellar, 1st floor, and 2nd floor.
Q01027633-S2
03/30/2024
Special inspection requirement — Final
WANLONG HE
03/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/14/2006
Violation issued (ECB, closed)
Quality of Life
01/14/2006
Violation issued (ECB, closed)
Quality of Life
07/28/1999
Violation issued (ECB, closed)
Construction
01/26/1999
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offLEADING GREEN ENERGY CON10/21/2025
DOB NOWGeneral ConstructionSigned-offJJK BUILDING CONSULTING06/05/2024
DOB NOWCurb CutPermit IssuedJJK BUILDING CONSULTING05/29/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC05/20/2024
1 project · most recent 09/12/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/12/2024Signed-offROCK E SMALL PLBG&HTG INCGas, Water/Sanitary
4 projects · most recent 06/23/2026
FiledStatusContractorScope
06/23/2026CompleteKWONG MING ELECTRIC INC—
12/31/2025CompleteKWONG MING ELECTRIC INC1 meters
09/18/2025CancelledKWONG MING ELECTRIC INC—
11/14/2023CompleteA.C. MORGAN ELECTRIC1 meters, 1 new_meters
1 project · most recent 10/01/2025
FiledStatusContractorScope
10/01/2025Signed-offLEADING GREEN ENERGY CON44 panels, 18.92 kw, 1,008 roof_area_sqft
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
09/24/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/28/2025Fire-Resistant Penetrations and JointsAlan Yangspecial
08/28/2025Air barrier - visual inspectionAlan Yangenergy_progress
08/28/2025FinalAlan Yangprogress
08/28/2025Energy Code Compliance InspectionsAlan Yangprogress
08/28/2025Structural Stability – Alterations of existing buildingsAlan Yangspecial
09/11/2024Maintenance informationWANLONG HEenergy_progress
09/11/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
09/11/2024HVAC-R and service water piping design and insulationWANLONG HEenergy_progress
09/11/2024HVAC-R and service water heating equipmentWANLONG HEenergy_progress
07/26/2024HVAC-R and service water piping design and insulationWANLONG HEenergy_progress
07/26/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
07/26/2024HVAC-R and service water heating equipmentWANLONG HEenergy_progress
07/26/2024Maintenance informationWANLONG HEenergy_progress
07/15/2024Maintenance informationWANLONG HEenergy_progress
07/15/2024HVAC-R and service water heating equipmentWANLONG HEenergy_progress
07/15/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
07/15/2024HVAC-R and service water piping design and insulationWANLONG HEenergy_progress
06/24/2024HVAC-R and service water heating equipmentWANLONG HEenergy_progress
06/24/2024Maintenance informationWANLONG HEenergy_progress
06/24/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
06/24/2024HVAC-R and service water piping design and insulationWANLONG HEenergy_progress
03/30/2024FinalWANLONG HEprogress
03/30/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026Q01027633-P4Request digital key ↗
08/21/2026Q01027633-P5Request digital key ↗
08/21/2026Q01027633-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature16
09/14/2026Q01027633-P1Open ↗
09/14/2026Q01027633-P1Open ↗
09/14/2026Q01027633-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026Q01027633-P1Open ↗
08/13/2026Q01027633-P2Open ↗
08/13/2026Q01027633-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/14/2026Q01027633-P1Open ↗
08/27/2026Q01027633-P2Open ↗
08/25/2026Q01027633-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026Q01027633-P1Open ↗
08/13/2026Q01027633-P4Open ↗
08/13/2026Q01027633-P2Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/13/2026Q01027633-S2Open ↗
08/13/2026Q01027633-P5Open ↗
08/13/2026Q01027633-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026Q01279393-I1Open ↗