← Back
Church, synagogue, chapel
37-59 60 STREET
QUEENS · Woodside · BIN 4311319
💬 Discuss this project
1986Year Built
3Stories
M1Building Class
R5BZoning
7,125 sfGross Floor Area
1Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: KOREAN 1ST PRESBYTERIAN · 15,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 17 docs
CellarUnder Construction2p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KOREAN 1ST PRESBYTERIAN CHURCH203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MIN KIM ARCHITECT PC403/25/2026
NEWTEC ENGINEERING112/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K M DOB CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARISTA AIR CONDITIONING CORPGeneral Contractor203/21/2026
HANKOOK HIC INCGeneral Contractor207/08/2026
C.R.U. MECHAN & HEAT INCPlumbing207/08/2026
YOUNG CHOEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHONG ENGINEERING P.C.7411311/14/2025
OBAID MIAN849112/14/2022
Building Lifecycle
All (52)Filed (5)Permit Issued (5)Signed Off (3)Violation (25)Inspection (3)Special Inspection (11)
05/04/2026
Permit issued — Plumbing
Q01297021-S1-PL
03/25/2026
Filed — Alteration
The previous legalization application (#Q01297021-I1) incorrectly indicated the gas pipe size. However, a legalization application cannot be filed as a PAA. This application is submitted solely to correct the previously stated gas pipe size.
Q01297021-S1
03/02/2026
Signed off — Alteration
INSTALLATION OF KITCHEN HOOD WITH EXHAUST FAN WITH DUCT WORK, AND MAKE-UP AIR IN WATER HEATER ROOM.
Q01297084-I1
03/02/2026
Signed off — Alteration
INSTALLATION OF A HOT WATER HEATER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01296647-I1
02/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/04/2025
Permit issued — Plumbing
Q01297021-I1-PL
11/26/2025
Permit issued — General Construction
Q01296647-I1-GC
11/24/2025
Permit issued — Mechanical Systems
Q01297084-I1-MS
11/14/2025
Filed — Alteration
INSTALLATION OF KITCHEN HOOD WITH EXHAUST FAN WITH DUCT WORK, AND MAKE-UP AIR IN WATER HEATER ROOM.
Q01297084-I1
11/14/2025
Filed — Alteration
INSTALLATION OF A HOT WATER HEATER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01296647-I1
11/14/2025
Filed — Alteration
The previous legalization application (#Q01297021-I1) incorrectly indicated the gas pipe size. However, a legalization application cannot be filed as a PAA. This application is submitted solely to correct the previously stated gas pipe size.
Q01297021-I1
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
10/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Tae Chong
10/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tae Chong
10/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tae Chong
10/02/2025
Special inspection requirement — Maintenance information
Tae Chong
10/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tae Chong
10/02/2025
Special inspection requirement — Mechanical Systems
Tae Chong
10/02/2025
Special inspection requirement — Final
Tae Chong
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
10/02/2025
Special inspection requirement — Final
Tae Chong
03/22/2023
Signed off — Alteration
Q08043497-I1
12/14/2022
Filed — Alteration
Q08043497-I1
12/14/2022
Permit issued — Mechanical Systems
Q08043497-I1-MS
02/26/2015
Violation issued (HPD, closed)
I
10/30/2013
Violation issued (ECB, closed)
Unknown
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/10/1984
Violation issued (HPD, open)
B
08/10/1984
Violation issued (HPD, open)
A
08/10/1984
Violation issued (HPD, open)
A
08/10/1984
Violation issued (HPD, open)
B
08/10/1984
Violation issued (HPD, open)
A
08/10/1984
Violation issued (HPD, open)
A
08/10/1984
Violation issued (HPD, open)
A
08/10/1984
Violation issued (HPD, open)
B
08/10/1984
Violation issued (HPD, open)
B
06/17/1983
Violation issued (HPD, closed)
A
05/07/1982
Violation issued (HPD, closed)
A
01/20/1982
Violation issued (HPD, closed)
A
06/15/1979
Violation issued (HPD, open)
B
06/15/1979
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedC.R.U. MECHAN & HEAT INC05/04/2026
DOB NOWPlumbingPermit IssuedC.R.U. MECHAN & HEAT INC12/04/2025
DOB NOWGeneral ConstructionSigned-offHANKOOK HIC INC11/26/2025
DOB NOWMechanical SystemsSigned-offHANKOOK HIC INC11/24/2025
DOB NOWMechanical SystemsSigned-offARISTA AIR CONDITIONING C12/14/2022
BISFPISSUEDFIRE COMMAND CO, INC09/27/2011
BISOTISSUEDKORMAN DESIGN & BUILD05/27/1998
BISPLISSUEDMAINLAND PLG08/02/1995
BISFPISSUEDIDEAL FIRE CONTROL09/02/1994
1 project · most recent 03/25/2026
Gas
FiledStatusContractorScope
03/25/2026Permit IssuedC.R.U. MECHAN & HEAT INCGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/10/2025Fire-Resistant Penetrations and JointsTae Chongspecial
10/02/2025Energy Code Compliance InspectionsTae Chongprogress
10/02/2025HVAC-R and service water heating equipmentTae Chongenergy_progress
10/02/2025HVAC-R and service water heating system controlsTae Chongenergy_progress
10/02/2025Maintenance informationTae Chongenergy_progress
10/02/2025HVAC-R and service water piping design and insulationTae Chongenergy_progress
10/02/2025Mechanical SystemsTae Chongspecial
10/02/2025FinalTae Chongprogress
10/02/2025Fire-Resistant Penetrations and JointsTae Chongspecial
10/02/2025Fire-Resistant Penetrations and JointsTae Chongspecial
10/02/2025FinalTae Chongprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q08043497-I1Request digital key ↗
08/18/2026Q01296647-I1Request digital key ↗
08/18/2026Q01297084-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
09/29/2011420484050Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/22/2011420484050Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08043497-I1Open ↗
08/18/2026Q01296647-I1Open ↗
08/17/2026Q01297021-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q01297084-I1Open ↗
08/29/2026Q01296647-I1Open ↗
08/24/2026Q01297021-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026Q01297084-I1Open ↗
08/29/2026Q01296647-I1Open ↗
08/24/2026Q01297021-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/29/2011420484050Open ↗
09/22/2011420484050Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026Q08043497-I1Open ↗
08/18/2026Q01296647-I1Open ↗
08/17/2026Q01297021-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/22/2011420484050Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q08043497-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/25/2026Q08043497-I1Open ↗
08/13/2026Q01297021-S1Open ↗
08/13/2026Q01296647-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
09/22/2011420484050Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/22/2011420484050Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/22/2011420484050Open ↗
▸Other Documents1
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026Q01297021-S1Open ↗