1928Year Built
3Stories
S9Building Class
R6Zoning
5,600 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸
Single or multiple dwelling with stores or offices · 2,000 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 2 filings · 20 docs
Floor 21p · 1 filing · 6 docs
Floor 124p · 1 filing · 20 docs
Cellar28p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FERHATI LLC503/22/2026
93-01 CORNER PROPERTY703/22/2026
93-01 CORNER PROPERTIES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HARDIE & ASSOCIATES CONSULTING ENG.301/15/2026
AM ARCHITECT P.C.606/17/2025
ALLEN SHINFELD, P.E. PLLC112/10/2024
SELF EMPLOYED108/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DY EXPEDITING803/21/2026
A K EXPEDITING1203/21/2026
Younes Abouyaala PE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FERHATI LLCGeneral Contractor303/21/2026
JIN AN INCGeneral Contractor303/21/2026
INNOVATIVE VENTURES TEAMGeneral Contractor207/08/2026
DRILON PLBG & HTG INCPlumbing207/08/2026
CAPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827305/28/2025
ALLEN SHINFELD, P.E. PLLC1305112/10/2024
NKM ENGINEERING PLLC6244111/19/2024
AA BUILDING & INSPECTION1519108/28/2024
Building Lifecycle
All (82)Filed (11)Permit Issued (7)Signed Off (3)Violation (23)Inspection (12)Special Inspection (26)
03/17/2026
Signed off — Alteration
Cap and remove the existing gas meter, associated gas piping, gas-fired boiler, and gas-fired water heater located in the cellar in order to file an OP-49. All gas piping will be permanently capped and made safe. No new gas work proposed.
Q01127313-I1
01/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
01/15/2026
Filed — Alteration
Cap and remove the existing gas meter, associated gas piping, gas-fired boiler, and gas-fired water heater located in the cellar in order to file an OP-49. All gas piping will be permanently capped and made safe. No new gas work proposed.
Q01127313-P2
01/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
12/05/2025
Permit issued — Plumbing
Q01127313-I1-PL
12/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2025
Filed — Alteration
Cap and remove the existing gas meter, associated gas piping, gas-fired boiler, and gas-fired water heater located in the cellar in order to file an OP-49. All gas piping will be permanently capped and made safe. No new gas work proposed.
Q01127313-P1
09/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/17/2025
Filed — Alteration
Installation of plumbing fixtures in existing roughing to an existing commercial space. No change in use, egress or occupancy is involved under this application.
Q01123264-P3
06/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/02/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/28/2025
Filed — Alteration
Installation of plumbing fixtures in existing roughing to an existing commercial space. No change in use, egress or occupancy is involved under this application.
Q01123264-P2
05/06/2025
Filed — Alteration
Installation of plumbing fixtures in existing roughing to an existing commercial space. No change in use, egress or occupancy is involved under this application.
Q01123264-P1
05/05/2025
Special inspection requirement — Interior lighting power
Altagracia Martinez
05/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
05/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2025
Special inspection requirement — Final
JONAR MADRIAGA
05/05/2025
Special inspection requirement — Fenestration areas
Altagracia Martinez
05/05/2025
Special inspection requirement — Lighting controls
Altagracia Martinez
05/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/29/2025
Violation issued (ECB, closed)
Unknown
03/31/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2025
Permit issued — Mechanical Systems
Q01123264-S3-MS
01/27/2025
Permit issued — Plumbing
Q01127313-I1-PL
01/15/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/30/2024
Signed off — Alteration
MECHANICAL HEATING THROUGH OUT THE BUILDING TO REPLACEBUILDING BOILER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01127322-I1
12/23/2024
Permit issued — Mechanical Systems
Q01127322-I1-MS
12/10/2024
Filed — Alteration
MECHANICAL HEATING THROUGH OUT THE BUILDING TO REPLACEBUILDING BOILER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q01127322-I1
12/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALLEN SHINFELD
12/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALLEN SHINFELD
12/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLEN SHINFELD
12/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALLEN SHINFELD
12/09/2024
Special inspection requirement — Ventilation and air distribution system
ALLEN SHINFELD
12/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALLEN SHINFELD
12/02/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/19/2024
Filed — Alteration
Cap and remove the existing gas meter, associated gas piping, gas-fired boiler, and gas-fired water heater located in the cellar in order to file an OP-49. All gas piping will be permanently capped and made safe. No new gas work proposed.
Q01127313-I1
11/14/2024
Signed off — Alteration
Q01073849-I1
11/13/2024
Filed — Alteration
Installation of plumbing fixtures in existing roughing to an existing commercial space. No change in use, egress or occupancy is involved under this application.
Q01123264-S3
11/04/2024
Permit issued — General Construction
Q01123264-I1-GC
11/04/2024
Permit issued — Plumbing
Q01123264-S1-PL
10/15/2024
Special inspection requirement — Final
ALLEN SHINFELD
10/15/2024
Special inspection requirement — Mechanical Systems
ALLEN SHINFELD
10/09/2024
Filed — Alteration
Installation of plumbing fixtures in existing roughing to an existing commercial space. No change in use, egress or occupancy is involved under this application.
Q01123264-I1
10/09/2024
Filed — Alteration
Installation of plumbing fixtures in existing roughing to an existing commercial space. No change in use, egress or occupancy is involved under this application.
Q01123264-S1
10/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
10/08/2024
Special inspection requirement — Final
JONAR MADRIAGA
10/08/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
08/30/2024
Permit issued — General Construction
Q01073849-I1-GC
08/28/2024
Filed — Alteration
Q01073849-I1
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
06/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/28/2024
Special inspection requirement — Final
NAVEEN KUMAR
06/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC12/05/2025
DOB NOWMechanical SystemsPermit IssuedINNOVATIVE VENTURES TEAM01/29/2025
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC01/27/2025
DOB NOWMechanical SystemsSigned-offJIN AN INC12/23/2024
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE VENTURES TEAM11/04/2024
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC11/04/2024
DOB NOWGeneral ConstructionSigned-offFERHATI LLC08/30/2024
BISPLISSUEDCROWN PLUMBING INC09/18/2018
BISOTISSUEDJIN AN INC08/27/2018
BISOTISSUEDJIN AN INC07/27/2018
BISPLISSUEDS & L PLUMBING INC04/20/2010
BISOTISSUEDTOWER AWNING & SIGN INC11/19/2004
BIS—ISSUEDGOOD-WILL MECHANICAL CORP.10/12/2004
BISOTISSUEDWAVE DANCER LTD07/15/2003
BISMHISSUEDWAVE DANCER LTD07/15/2003
1 project · most recent 06/17/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2025Permit IssuedINNOVATIVE VENTURES TEAMAir Conditioning Systems, Ventilation Systems
Cooling
Ct-Morley MOU-4A36H-2 36,000 BTU · Split System ×8
Apoodr ASF16-18H2B 18,000 BTU · Split System ×4
Ventilation
__Junk__ Superior Hood 1 CFM · Kitchen Exhaust ×4
1 project · most recent 06/17/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/17/2025Permit IssuedCAPE PLUMBING INCGas, Water/Sanitary
3 projects · most recent 07/23/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
07/23/2025Permit IssuedA & S MASTER ELEC'L CORPHVAC Wiring
04/23/2024CompleteATMOS ELECTRIC SVCE CORPGeneral Wiring
12/14/2018CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
12/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/02/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/15/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/02/2024Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
01/20/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
01/14/2026Tenant Protection Plan Compliance—special
06/17/2025Tenant Protection Plan Compliance—special
05/05/2025Interior lighting powerAltagracia Martinezenergy_progress
05/05/2025Tenant Protection Plan Compliance—special
05/05/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
05/05/2025Tenant Protection Plan Compliance—special
05/05/2025FinalJONAR MADRIAGAprogress
05/05/2025Fenestration areasAltagracia Martinezenergy_progress
05/05/2025Lighting controlsAltagracia Martinezenergy_progress
12/09/2024HVAC-R and service water piping design and insulationALLEN SHINFELDenergy_progress
12/09/2024HVAC-R and service water heating equipmentALLEN SHINFELDenergy_progress
12/09/2024Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
12/09/2024Tenant Protection Plan ComplianceALLEN SHINFELDspecial
12/09/2024Ventilation and air distribution systemALLEN SHINFELDenergy_progress
12/09/2024HVAC-R and service water heating system controlsALLEN SHINFELDenergy_progress
10/15/2024FinalALLEN SHINFELDprogress
10/15/2024Mechanical SystemsALLEN SHINFELDspecial
10/09/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
10/08/2024FinalJONAR MADRIAGAprogress
10/08/2024Mechanical SystemsJONAR MADRIAGAspecial
06/28/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/28/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
06/28/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
06/28/2024FinalNAVEEN KUMARprogress
Latest 25 of 26.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026Q01073849-I1Request digital key ↗
08/21/2026Q01127322-I1Request digital key ↗
08/20/2026Q01123264-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
12/20/2018421661446Open ↗
11/10/2018421661446Open ↗
11/03/2018421661446Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
10/09/2018421661446Open ↗
09/19/2018421661446Open ↗
08/15/2018421661446Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/02/2019421661446Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026Q01123264-P2Open ↗
09/02/2026Q01123264-P2Open ↗
09/02/2026Q01123264-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026Q01073849-I1Open ↗
08/21/2026Q01127322-I1Open ↗
08/20/2026Q01123264-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026Q01123264-P2Open ↗
08/25/2026Q01127322-I1Open ↗
08/25/2026Q01127322-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/02/2019421661446Open ↗
08/15/2018421661446Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/15/2018421661446Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/15/2018421661446Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/10/2018421661446Open ↗
11/03/2018421661446Open ↗
08/15/2018421661446Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/18/2010420160355Open ↗
06/02/2010420160355Open ↗
▸BISSCHEDULE B - PLUMBING1
03/10/2010420160355Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
10/18/2010420160355Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/15/2018421661446Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/21/2026Q01073849-I1Open ↗
08/21/2026Q01127322-I1Open ↗
08/20/2026Q01123264-S1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/15/2018421661446Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
03/10/2010420160355Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/02/2019421661446Open ↗
08/15/2018421661446Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/02/2019421661446Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/02/2019421661446Open ↗
08/30/2011420160355Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/10/2010420160355Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
04/02/2019421661446Open ↗
08/15/2018421661446Open ↗
08/30/2011420160355Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
08/15/2018421661446Open ↗
03/10/2010420160355Open ↗
▸BISADDITIONAL INFORMATION1
11/10/2018421661446Open ↗
▸BISBOROUGH INTAKE FORM1
12/20/2018421661446Open ↗