← Back
Multi-story retail building (2+)
37-64 JUNCTION BOULEVARD
QUEENS · BIN 4036664
💬 Discuss this project
1928Year Built
2Stories
K2Building Class
R6AZoning
3,520 sfGross Floor Area
1Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: NET RETAIL LLC · 1,950 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Roof1p · 1 filing · 6 docs
Floor 23p · 3 filings · 17 docs
Floor 13p · 3 filings · 20 docs
Cellar4p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/25/2020$2.0M—— → —$565/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CATAPANO ENGINEERING PC405/15/2025
JLS DESIGNS307/10/2024
ALL CITY ENGINEERING, P.C.105/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JLS DESIGNS303/21/2026
CATAPANO ENGINEERING403/21/2026
CATAPANO ENG ARCH P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN JERSEY IMPROVEGeneral Contractor407/08/2026
DCI ENTERPRISES LLCGeneral Contractor403/21/2026
BASS ELECTRICAL CORP.Electrical203/22/2026
LEBO ELECTRIC LLCElectrical103/22/2026
SCHUMACHER & FARLEY P&H CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATAPANO ENGINEERING & AR3235405/15/2025
SHAHRISH SHUVO ENGINEERIN8524207/03/2024
ALL CITY ENGINEERING PC7115105/31/2024
Building Lifecycle
All (64)Filed (8)Permit Issued (5)Signed Off (5)Violation (8)Inspection (6)Objection (2)Special Inspection (30)
05/19/2025
Signed off — Alteration
Proposing - (2) HVAC Units RTU 1&2 w/assoc. ductwork, grilles, diffusers, thermostat, (2) electric heating units (2) Restroom Exhaust Fans, (1) Air Curtain. All work as per plans.
Q01082531-I1
05/16/2025
Special inspection requirement — Ventilation and air distribution system
JOHN CATAPANO
05/16/2025
Special inspection requirement — Mechanical Systems
JOHN CATAPANO
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
05/16/2025
Special inspection requirement — Final
JOHN CATAPANO
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
05/16/2025
Special inspection requirement — Maintenance information
JOHN CATAPANO
05/16/2025
Special inspection requirement — Shutoff dampers
JOHN CATAPANO
05/15/2025
Filed — Alteration
Proposing - (2) HVAC Units RTU 1&2 w/assoc. ductwork, grilles, diffusers, thermostat, (2) electric heating units (2) Restroom Exhaust Fans, (1) Air Curtain. All work as per plans.
Q01082531-P1
05/02/2025
Signed off — Alteration
Install- Cellar (1) H.W. Heater,(1) Grease Interceptor. 1st Floor- (1) Lav. (1) Water Closet, (8) non res. sinks, (1) Ice Machine, (2) Ice Bin, (1) Ice Diverter, (1)water filling station, (1)Water Filtration, (1) Dishwasher, (10) Drains w/assoc piping
Q01082524-I1
05/01/2025
Signed off — Alteration
Proposing Interior Partitions, Floor & Ceiling Finishes, Casework, Wall Treatment, Furniture & Graphics.Remove existing partial wall at stairs & bathroom partitions. All Work as per plans.
Q01082500-I1
05/01/2025
Special inspection requirement — Ventilation and air distribution system
JOHN CATAPANO
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
05/01/2025
Special inspection requirement — Mechanical Systems
JOHN CATAPANO
05/01/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
05/01/2025
Special inspection requirement — Final
JOHN CATAPANO
05/01/2025
Special inspection requirement — Shutoff dampers
JOHN CATAPANO
05/01/2025
Special inspection requirement — Maintenance information
JOHN CATAPANO
01/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2024
Signed off — Alteration
Q01035714-I1
10/24/2024
Permit issued — Mechanical Systems
Q01082531-I1-MS
10/23/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/15/2024
Signed off — Alteration
PROPOSED ADA BATHROOM
Q01076086-I1
10/11/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/10/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/19/2024
Permit issued — Plumbing
Q01082524-I1-PL
09/09/2024
Permit issued — General Construction
Q01082500-I1-GC
08/08/2024
Filed — Alteration
Proposing - (2) HVAC Units RTU 1&2 w/assoc. ductwork, grilles, diffusers, thermostat, (2) electric heating units (2) Restroom Exhaust Fans, (1) Air Curtain. All work as per plans.
Q01082531-I1
08/08/2024
Filed — Alteration
Install- Cellar (1) H.W. Heater,(1) Grease Interceptor. 1st Floor- (1) Lav. (1) Water Closet, (8) non res. sinks, (1) Ice Machine, (2) Ice Bin, (1) Ice Diverter, (1)water filling station, (1)Water Filtration, (1) Dishwasher, (10) Drains w/assoc piping
Q01082524-I1
08/08/2024
Filed — Alteration
Proposing Interior Partitions, Floor & Ceiling Finishes, Casework, Wall Treatment, Furniture & Graphics.Remove existing partial wall at stairs & bathroom partitions. All Work as per plans.
Q01082500-I1
07/24/2024
Permit issued — General Construction
Q01076086-I1-GC-CX
07/19/2024
Special inspection requirement — Lighting controls
JOHN CATAPANO
07/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN CATAPANO
07/19/2024
Special inspection requirement — Maintenance information
JOHN CATAPANO
07/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
07/19/2024
Special inspection requirement — Insulation placement and R values
JOHN CATAPANO
07/19/2024
Special inspection requirement — Interior lighting power
JOHN CATAPANO
07/19/2024
Special inspection requirement — Exterior lighting power
JOHN CATAPANO
07/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
07/18/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
07/18/2024
Special inspection requirement — Final
JOHN CATAPANO
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
07/18/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
07/10/2024
Filed — Alteration
PROPOSED ADA BATHROOM
Q01076086-S1
07/03/2024
Filed — Alteration
PROPOSED ADA BATHROOM
Q01076086-I1
06/11/2024
Objection raised — Admin
06/11/2024
Objection resolved — Addressed
05/31/2024
Filed — Alteration
Q01058940-I1
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
05/24/2024
Permit issued — Structural
Q01035714-I1-GC-CX
04/17/2024
Filed — Alteration
Q01035714-I1
04/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
04/17/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Shahrish Shuvo
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAMERICAN JERSEY IMPROVE10/24/2024
DOB NOWPlumbingSigned-offSCHUMACHER & FARLEY P&H C09/19/2024
DOB NOWGeneral ConstructionSigned-offAMERICAN JERSEY IMPROVE09/09/2024
DOB NOWGeneral ConstructionSigned-offDCI ENTERPRISES07/24/2024
DOB NOWStructuralSigned-offDCI ENTERPRISES05/24/2024
BIS—ISSUEDN/A08/08/2024
BISSPISSUEDADRIANO PLUMBING & HEATING01/19/2024
BISPLISSUEDRRP PLUMBING CORP08/28/2008
BISSPISSUEDCHIEF FIRE CONTR. CO. INC10/05/2001
BISOTISSUEDDAFNA CONSTRUCTION CO., INC.07/18/1994
BISMHISSUEDAIR MODERN INC.09/03/1993
BISPLISSUEDN/A07/29/1993
BISOTISSUEDDAFNA CONSTRUCTION CO., INC.07/14/1993
BISMHISSUEDAIR MODERN INC.05/20/1993
1 project · most recent 07/10/2024
Water/Sanitary
FiledStatusContractorScope
07/10/2024——Water/Sanitary
2 projects · most recent 02/17/2025
General Wiring
FiledStatusContractorScope
02/17/2025CompleteLEBO ELECTRIC LLCGeneral Wiring
08/19/2024CompleteBASS ELECTRICAL CORP.General Wiring
1 project · most recent 07/10/2024
Steel Concrete
FiledStatusContractorScope
07/10/2024Signed-offDCI ENTERPRISES LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/11/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/16/2025Ventilation and air distribution systemJOHN CATAPANOenergy_progress
05/16/2025Mechanical SystemsJOHN CATAPANOspecial
05/16/2025Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
05/16/2025FinalJOHN CATAPANOprogress
05/16/2025Energy Code Compliance InspectionsJOHN CATAPANOprogress
05/16/2025Maintenance informationJOHN CATAPANOenergy_progress
05/16/2025Shutoff dampersJOHN CATAPANOenergy_progress
05/01/2025Ventilation and air distribution systemJOHN CATAPANOenergy_progress
05/01/2025Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
05/01/2025Mechanical SystemsJOHN CATAPANOspecial
05/01/2025Energy Code Compliance InspectionsJOHN CATAPANOprogress
05/01/2025FinalJOHN CATAPANOprogress
05/01/2025Shutoff dampersJOHN CATAPANOenergy_progress
05/01/2025Maintenance informationJOHN CATAPANOenergy_progress
07/19/2024Lighting controlsJOHN CATAPANOenergy_progress
07/19/2024HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
07/19/2024Maintenance informationJOHN CATAPANOenergy_progress
07/19/2024HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
07/19/2024Insulation placement and R valuesJOHN CATAPANOenergy_progress
07/19/2024Interior lighting powerJOHN CATAPANOenergy_progress
07/19/2024Exterior lighting powerJOHN CATAPANOenergy_progress
07/19/2024HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
07/18/2024Energy Code Compliance InspectionsJOHN CATAPANOprogress
07/18/2024Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
07/18/2024FinalJOHN CATAPANOprogress
Latest 25 of 35.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026Q01035714-I1Request digital key ↗
08/22/2026Q01058940-I1Request digital key ↗
08/22/2026Q01076086-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION15
08/04/2025421840761Open ↗
07/30/2025421840761Open ↗
07/28/2025400376721Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION5
12/01/2025421840761Open ↗
04/25/2025401245773Open ↗
04/25/2025401245773Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/14/2025421840761Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
07/16/2025421840761Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q01035714-I1Open ↗
08/27/2026Q01082531-P1Open ↗
08/27/2026Q01082531-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026Q01035714-I1Open ↗
08/22/2026Q01058940-I1Open ↗
08/22/2026Q01076086-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01035714-I1Open ↗
08/27/2026Q01082531-P1Open ↗
08/25/2026Q01058940-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/05/2007410026298Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/05/2007410026298Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/05/2007410026298Open ↗
▸Trade Schedules & Equipment6
▸BIS* SPRINKLER TEST(HYDROSTATIC) 27-9674
01/26/2024401245773Open ↗
01/26/2024401245773Open ↗
01/10/2024410026298Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
11/05/2007410026298Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
12/08/2008410026298Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026Q01035714-I1Open ↗
08/22/2026Q01058940-I1Open ↗
08/22/2026Q01076086-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/05/2007410026298Open ↗
▸BIS* ASBESTOS ACP 7 OR 5 OR ASB 41
01/10/2024410026298Open ↗
▸Inspections & Test Reports1
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/26/2024401245773Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSUPERSEDING LETTER2
04/25/2025401245773Open ↗
04/25/2025401245773Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/05/2024401245773Open ↗
01/23/2024410026298Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF2
01/26/2024401245773Open ↗
01/10/2024410026298Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
06/10/2025421840761Open ↗
07/15/2024421840761Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/24/2025400376721Open ↗
02/05/2024401245773Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/05/2007410026298Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT2
01/10/2024410026298Open ↗
08/28/2008410026298Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
07/29/2025421840761Open ↗
01/10/2024410026298Open ↗
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
04/25/2025401245773Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
10/27/2025421840761Open ↗
09/22/2025421840761Open ↗
07/28/2025400376721Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
04/25/2025401245773Open ↗
04/25/2025401245773Open ↗
▸BISEFILING COVER SHEET1
06/10/2025421840761Open ↗
▸Other Documents1
▸BIS* FIRE STOPS 27-3451
01/10/2024410026298Open ↗