HPD05/07/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD06/12/2025(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
HPD07/01/2003§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF concealed water leak atceiling IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY
HPD07/01/2003§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION heat riser IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY
HPD07/01/2003§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ceiliong IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY
HPD07/01/2003§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR walls /ceiling IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY
HPD07/01/2003§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR walls/ceiling IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
HPD03/25/1997§ 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE TO 2 STY APT 4. , SECTION '' ''
HPD03/25/1997§ 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE TO 1 STY APT 3. LOCATED AT APT 3
ECB01/09/2003HAVING A PROHIBITED ILLUMINATED SIGN ON A CANOPY. REMEDY; REMOVE ILLEGAL SIGN.Nothing owed — awaiting certificate of correction
ECB01/09/2003HAVING INSTALLED 5 SIGNS WITHOUT PERMITS. REMEDY; REMOVE ALL ILLEGAL SIGNAGE.Nothing owed — awaiting certificate of correction
ECB01/09/2003HAVING MORE THAN ONE SIGN FOR EACH USE BUILDING. REMEDY; REMOVE ALL ILLEGAL SIGNS.Nothing owed — awaiting certificate of correction
ECB01/09/2003HAVING A PROHIBITED ILLUMINATED SIGN IN AN 'R' DISTRICT REMEDY; REMOVE ILLEGAL SIGN.Nothing owed — awaiting certificate of correction