1930Year Built
1Stories
E1Building Class
M2-1Zoning
118,367 sfGross Floor Area
7Units
LL97 Covered3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
General warehouse · Owner of record: GOWANUS 9TH STREET OWNER LLC · 126,067 sf lot · 0.94 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof25p · 1 filing · 20 docs
Floor 137p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
POTTERY STUDIO3007/08/2026
GOWANUS 9TH STREET OWNER LLC103/22/2026
DEPARTMENT OF TRANSPORTAT103/22/2026
OWNER OF PREMISES 51 9 ST103/22/2026
OWNER OF 9 STREET103/22/2026
REALTY MANAGEMENT603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCORD CONSULTING ENGINEERING PC1106/11/2025
OPERA STUDIO ARCHITECTURE, LLC208/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OPERA STUDIO ARCHITECTURE LLC2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HYDRO MECHANICAL INCFire Protection107/08/2026
DGJ CONTRACTING INCGeneral Contractor107/08/2026
HYDRO MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OPERA STUDIO ARCHITECTURE59701106/11/2025
STEEL CORE ENGINEERING PL1098208/27/2024
Building Lifecycle
All (99)Filed (13)Permit Issued (3)Violation (9)Inspection (14)Objection (30)Special Inspection (30)
09/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
06/27/2025
Special inspection requirement — Maintenance information
Thomas Barry
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
06/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
06/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
06/11/2025
Filed — Alteration
TENANT IMPROVEMENT WORK ON THE 1ST FLOOR OF EXISTING COMMERCIALBUILDING INCLUDES THE DEMOLITION AND INSTALLATION OF NONSTRUCTURALPARTITION WALLS, FLOOR FINISHES, INSTALLATION OF HIGHVOLUME GAS KILNS FOR CERAMICS MANUFACTURE
B01065931-P9
06/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
06/11/2025
Special inspection requirement — Maintenance information
Thomas Barry
06/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
06/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
05/27/2025
Filed — Alteration
TENANT IMPROVEMENT WORK ON THE 1ST FLOOR OF EXISTING COMMERCIALBUILDING INCLUDES THE DEMOLITION AND INSTALLATION OF NONSTRUCTURALPARTITION WALLS, FLOOR FINISHES, INSTALLATION OF HIGHVOLUME GAS KILNS FOR CERAMICS MANUFACTURE
B01065931-P8
05/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
05/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
05/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
05/27/2025
Special inspection requirement — Maintenance information
Thomas Barry
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
04/16/2025
Violation issued (FDNY_NOV, closed)
04/16/2025
Violation issued (FDNY_NOV, closed)
04/16/2025
Violation issued (FDNY_NOV, closed)
04/16/2025
Violation issued (FDNY_NOV, closed)
04/16/2025
Violation issued (FDNY_NOV, closed)
04/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/05/2025
Filed — Alteration
TENANT IMPROVEMENT WORK ON THE 1ST FLOOR OF EXISTING COMMERCIALBUILDING INCLUDES THE DEMOLITION AND INSTALLATION OF NONSTRUCTURALPARTITION WALLS, FLOOR FINISHES, INSTALLATION OF HIGHVOLUME GAS KILNS FOR CERAMICS MANUFACTURE
B01065931-P7
02/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
02/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
02/05/2025
Special inspection requirement — Maintenance information
Thomas Barry
02/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
12/20/2024
Filed — Alteration
TENANT IMPROVEMENT WORK ON THE 1ST FLOOR OF EXISTING COMMERCIALBUILDING INCLUDES THE DEMOLITION AND INSTALLATION OF NONSTRUCTURALPARTITION WALLS, FLOOR FINISHES, INSTALLATION OF HIGHVOLUME GAS KILNS FOR CERAMICS MANUFACTURE
B01065931-P6
12/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/18/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
12/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/02/2024
Filed — Alteration
TENANT IMPROVEMENT WORK ON THE 1ST FLOOR OF EXISTING COMMERCIALBUILDING INCLUDES THE DEMOLITION AND INSTALLATION OF NONSTRUCTURALPARTITION WALLS, FLOOR FINISHES, INSTALLATION OF HIGHVOLUME GAS KILNS FOR CERAMICS MANUFACTURE
B01065931-P5
11/13/2024
Special inspection requirement — Maintenance information
Thomas Barry
11/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
11/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
11/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
11/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
10/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/22/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/02/2024
Permit issued — Sprinklers
B01065931-S2-EW-SP
10/02/2024
Permit issued — General Construction
B01065931-I1-GC
10/01/2024
Special inspection requirement — Sprinkler Systems
Alexander Sheyman
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
09/25/2024
Objection resolved — Addressed
09/19/2024
Permit issued — Plumbing
B01065931-S1-PL
08/30/2024
Objection raised — Other
08/27/2024
Filed — Alteration
TENANT IMPROVEMENT WORK ON THE 1ST FLOOR OF EXISTING COMMERCIALBUILDING INCLUDES THE DEMOLITION AND INSTALLATION OF NONSTRUCTURALPARTITION WALLS, FLOOR FINISHES, INSTALLATION OF HIGHVOLUME GAS KILNS FOR CERAMICS MANUFACTURE
B01065931-P3
08/27/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Barry
08/27/2024
Special inspection requirement — Final
Thomas Barry
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offHYDRO MECHANICAL INC10/02/2024
DOB NOWGeneral ConstructionPermit IssuedDGJ CONTRACTING INC10/02/2024
DOB NOWPlumbingPermit IssuedHYDRO MECHANICAL INC09/19/2024
BISOTISSUEDBSD TRI-STATE MAINTENANCE06/25/2014
BISOTISSUEDBSD TRI-STATE MAINTENANCE11/12/2013
BISOTISSUEDM&B MAINTENANCE GROUP INC02/18/2011
BISOTISSUEDM&B MAINTENANCE GROUP INC10/05/2010
1 project · most recent 06/11/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
06/11/2025Permit IssuedDGJ CONTRACTING INCHeating and Air Conditioning Systems
1 project · most recent 06/11/2025
Sprinkler System
FiledStatusContractorScope
06/11/2025Signed-offHYDRO MECHANICAL INCSprinkler System
1 project · most recent 06/11/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/11/2025Permit IssuedHYDRO MECHANICAL INCGas, Water/Sanitary
3 projects · most recent 02/17/2025
General Wiring
FiledStatusContractorScope
02/17/2025CompleteCURRENT POWER ELECTRIC—
04/03/2024On Hold - Returned CheckNET POWER ELECTRIC CORPGeneral Wiring
05/16/2018Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
09/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
06/27/2025HVAC-R and service water heating equipmentThomas Barryenergy_progress
06/27/2025Maintenance informationThomas Barryenergy_progress
06/27/2025Fire-Resistant Penetrations and JointsThomas Barryspecial
06/27/2025HVAC-R and service water heating system controlsThomas Barryenergy_progress
06/27/2025HVAC-R and service water piping design and insulationThomas Barryenergy_progress
06/11/2025HVAC-R and service water piping design and insulationThomas Barryenergy_progress
06/11/2025Maintenance informationThomas Barryenergy_progress
06/11/2025HVAC-R and service water heating system controlsThomas Barryenergy_progress
06/11/2025Fire-Resistant Penetrations and JointsThomas Barryspecial
06/11/2025HVAC-R and service water heating equipmentThomas Barryenergy_progress
05/27/2025HVAC-R and service water heating equipmentThomas Barryenergy_progress
05/27/2025HVAC-R and service water piping design and insulationThomas Barryenergy_progress
05/27/2025HVAC-R and service water heating system controlsThomas Barryenergy_progress
05/27/2025Maintenance informationThomas Barryenergy_progress
05/27/2025Fire-Resistant Penetrations and JointsThomas Barryspecial
02/05/2025HVAC-R and service water heating system controlsThomas Barryenergy_progress
02/05/2025HVAC-R and service water heating equipmentThomas Barryenergy_progress
02/05/2025Fire-Resistant Penetrations and JointsThomas Barryspecial
02/05/2025Maintenance informationThomas Barryenergy_progress
02/05/2025HVAC-R and service water piping design and insulationThomas Barryenergy_progress
11/13/2024Maintenance informationThomas Barryenergy_progress
11/13/2024HVAC-R and service water heating system controlsThomas Barryenergy_progress
11/13/2024HVAC-R and service water piping design and insulationThomas Barryenergy_progress
11/13/2024HVAC-R and service water heating equipmentThomas Barryenergy_progress
11/13/2024Fire-Resistant Penetrations and JointsThomas Barryspecial
Latest 25 of 48.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/21/2026B01065931-S1Request digital key ↗
08/21/2026B01065931-I1Request digital key ↗
08/21/2026B01065931-P9Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
07/03/2012320495530Open ↗
01/10/2012320263479Open ↗
02/24/2011320263479Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
07/18/2014320495530Open ↗
11/25/2013320495530Open ↗
02/22/2011320208725Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature27
08/31/2026B01065931-P8Open ↗
08/31/2026B01065931-P8Open ↗
08/31/2026B01065931-P8Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/21/2026B01065931-I1Open ↗
08/21/2026B01065931-P9Open ↗
08/21/2026B01065931-P8Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026B01065931-P8Open ↗
08/27/2026B01065931-I1Open ↗
08/24/2026B01065931-S2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/03/2012320495530Open ↗
03/16/2012320208725Open ↗
01/27/2011320263479Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
01/27/2011320263479Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/21/2026B01065931-I1Open ↗
08/21/2026B01065931-P9Open ↗
08/21/2026B01065931-P8Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/27/2011320263479Open ↗
09/08/2010320208725Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/28/2012320495530Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/03/2012320495530Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/22/2013320495530Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS3
06/28/2012320495530Open ↗
01/27/2011320263479Open ↗
09/08/2010320208725Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/22/2013320495530Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/16/2012320208725Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
07/03/2012320495530Open ↗
03/16/2012320208725Open ↗
01/27/2011320263479Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
07/03/2012320495530Open ↗
09/08/2010320208725Open ↗