← Back
BuildNYC
One story - permanent living quarter
37 ACACIA AVENUE
STATEN ISLAND · BIN 5066857
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R3AZoning
1,040 sfGross Floor Area
1Units
One story - permanent living quarter · 3,800 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 2 filings · 20 docs
Basement1 filing · 20 docs
Sub-Basement1p · 2 filings · 5 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael Deruvo & Associates Architects506/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Michael Deruvo & Associates803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. Smith ConstructionGeneral Contractor304/09/2026
J. Smith ConstructionScaffold206/28/2026
Fine MechanicalPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738205/05/2025
Building Lifecycle
10/16/2026
Signed off — Alteration
APPLICATION FILED HEREWITH TO REMOVE EXISTING STALL SHOWER IN BASEMENT.
S01417475-I1
10/16/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH ALTERATION TYPE 1 APPLICATION.
S01196838-I1
06/26/2026
Permit expired, never signed off — Earth Work
The city's record still shows this permit as issued, with no sign-off on its filing
S01172080-I1-GC-CX
06/25/2026
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
S01172042-I1-FN
06/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFine Mechanical06/24/2026
DOB NOWPlumbingSigned-offFine Mechanical06/27/2025
DOB NOWEarth WorkPermit IssuedJ. Smith Construction06/26/2025
DOB NOWConstruction FencePermit IssuedJ. Smith Construction06/25/2025
DOB NOWEarth WorkPermit IssuedJ. Smith Construction05/28/2025
DOB NOWConstruction FencePermit IssuedJ. Smith Construction05/21/2025
2 projects · most recent 06/16/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/16/2026Signed-offFine MechanicalWater/Sanitary
03/21/2025Signed-offFine MechanicalGas, Water/Sanitary
1 project · most recent 07/28/2025
General Wiring
FiledStatusContractorScope
07/28/2025CompleteFlip City Electric & FireGeneral Wiring
1 project · most recent 05/05/2025
FiledStatusContractorScope
05/05/2025Permit IssuedJ. Smith Construction—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
05/15/2025Subgrade Inspectionsanthony santorospecial
05/15/2025Concrete - Cast-In-Placeanthony santorospecial
05/15/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
05/15/2025Wood – Prefabricated I-Joistsanthony santorospecial
05/15/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
05/15/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/15/2025Footing and Foundationanthony santoroprogress
05/15/2025Finalanthony santoroprogress
05/15/2025Energy Code Compliance Inspectionsanthony santoroprogress
05/15/2025Fire-Resistance Rated Constructionanthony santoroprogress
05/15/2025Air barrier - visual inspectionanthony santoroenergy_progress
05/15/2025Maintenance informationanthony santoroenergy_progress
05/15/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
05/15/2025Insulation placement and R valuesanthony santoroenergy_progress
05/15/2025Fenestration areasanthony santoroenergy_progress
05/15/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
05/15/2025Permanent certificateanthony santoroenergy_progress
05/15/2025Fenestration air leakageanthony santoroenergy_progress
05/15/2025Meteringanthony santoroenergy_progress
05/15/2025Interior lighting poweranthony santoroenergy_progress
05/05/2025Concrete - Cast-In-Placeanthony santorospecial
05/05/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
05/05/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
05/05/2025Subgrade Inspectionsanthony santorospecial
05/05/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
Latest 25 of 40.
61 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account